Township:

Section:

Corner: NW
Date: APRIL 25, 1901
Located: GOV. MOUNDS, PIT AND STAKE
Depth: 2
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: NW
Date: March 15, 2006
Located: 5/8" iron rod
Depth:
Placed:
Location: At intersection of gravel roads
Tie 1: Top SE corner of power box NE 44.0'
Tie 2: Nails Xed in wood riser pole NE 47.4'
Tie 3: Top center of telephone ped SE 45.4'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Surveyor's Record Section 17


Surveyor's Record Section 7


Surveyor's Record Section 18


Surveyor's Record Section 8

Corner: N1/4
Date: APRIL 1977
Located: NOTHING
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: DUG HUGE HOLE


Corner: N1/4
Date: March 15, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1861 Field Notes


Surveyor's Record Section 17


Surveyor's Record Section 8

Corner: NE
Date: MAY 12, 1979
Located: FIELD STONE
Depth:
Placed: SPIKE
Location: ABOVE STONE
Tie 1: N&C TEL. PED. SE. 43.13'
Tie 2: N&C POWER BRACE POLE NE. 45.34'
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: March 15, 2006
Located: 3/8" iron pin
Depth:
Placed:
Location: At intersections of gravel roads
Tie 1: Nails Xed in PP NW 53.5'
Tie 2: South leg of road closed sign E/SE 57.0'
Tie 3: Top center of telephone ped SE 43.1'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Surveyor's Record Section 17


Surveyor's Record Section 8


Surveyor's Record Section 9


Surveyor's Record Section 16

Corner: W1/4
Date: APRIL 25, 1901
Located: STONE 18"x22"x40"
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: W1/4
Date: March 15, 2006
Located: PK Nail
Depth:
Placed: 5/8" rebar with cap #44563
Location: In line with fence to the west
Tie 1: Nails Xed in PP SW 152.3'
Tie 2: Nails Xed in fence post W 33.9'
Tie 3: Nails Xed in PP NW 97.3'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Corner: W1/4
Date: AUG. 23, 2011
Located: IRON STAKE W/ SURVEY CAP NO. 44563
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


1861 Field Notes


Surveyor's Record Section 17


Surveyor's Record Section 18

Corner: CENTER
No information.


Surveyor's Record Section 17

Corner: E1/4
Date: APRIL 1977
Located: CONC. MON.
Depth: 6" BELOW GRADE
Placed:
Location:
Tie 1: BOTTOM OF BRIDGE RAIL SW. 22.7'
Tie 2: BOTTOM OF BRIDGE RAIL SE. 21.7'
Tie 3:
Tie 4:
Remarks: THESE TIES ARE NO GOOD.


Corner: E1/4
Date: NOV. 9, 1912
Located:
Depth:
Placed: ESTABLISHED
Location:
Tie 1: 2611.5' TO NORTH CORNER
Tie 2: 2611.5' TO SOUTH CORNER
Tie 3:
Tie 4:
Remarks:


Corner: E1/4
Date: 1978
Located:
Depth:
Placed: CONC. MON.
Location: 5" BELOW GRADE
Tie 1: N&C PP NW. 63.10'
Tie 2: CHISLED "X" ON CULVERT END W. 22.82'
Tie 3: CHISLED "X" ON CULVERT END SE. 35.58'
Tie 4:
Remarks:


Corner: E1/4
Date: March 15, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location:
Tie 1: Chiseled X in W end of box culvert NW 35.5'
Tie 2: Chiseled X in E end of box culvert NE 22.8'
Tie 3: Nails Xed in PP SE 63.1'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1861 Field Notes


Surveyor's Record Section 17


Surveyor's Record Section 16

Corner: SW
Date: APRIL 25, 1901
Located: STONE 12"x12"x22"
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: SW
Date: Nov. 2, 1992
Located: 3/4"x6" rebar
Depth: 6" deep
Placed: 1/2"x30" rebar
Location:
Tie 1: Nail & bottle cap in guy pole SW 49.83'
Tie 2: Nail & bottle cap in PP NW 44.72'
Tie 3: Nail & bottle cap in guy pole NE 48.08'
Tie 4: Top NW corner telephone ped SE 46.01'
Remarks: Kevin Jongerius
Corner Certification


Corner: SW
Date: APRIL 2, 1999
Located: 3/4" IRON PIN, FROM TIM BELL RECORDS
Depth: 2' NORTH OF C.L.
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: SW
Date: Feb. 13, 2008
Located: 1/2" rebar
Depth: Down 0.8'
Placed:
Location: At road intersection
Tie 1: USGS monument NW 47.97'
Tie 2: PK Nail in N side of PP SE 111.19'
Tie 3: PK Nail in SE side of PP SW 130.79'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Surveyor's Record Section 17


Surveyor's Record Section 18


Surveyor's Record Section 19


Surveyor's Record Section 20

Corner: S1/4
Date: NOV. 9, 1912
Located: LARGE GREY ROCK
Depth:
Placed:
Location: ON COR.
Tie 1: 20.5' ? LINE BETWEEN CORNERS
Tie 2:
Tie 3:
Tie 4:
Remarks: INFORMATION UNCLEAR.


Corner: S1/4
Date: March 13, 2006
Located: Rebar with an unreadable cap
Depth:
Placed:
Location: In line with fence to the north
Tie 1: Nails Xed on top of fence post N 37.8'
Tie 2: Nails Xed in PP S 31.8'
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1861 Field Notes


Surveyor's Record Section 17


Surveyor's Record Section 20

Corner: SE
Date: APRIL 1977
Located: CONC. MON.
Depth: 8" BELOW GRADE
Placed:
Location: MON. IS 45' S. OF INTERSECTION
Tie 1: N&C PP NW. 31.45'
Tie 2: N&C TEL. PED. NE 41.50'
Tie 3:
Tie 4:
Remarks:


Corner: SE
Date: March 13, 2006
Located: Rebar with an unreadable cap
Depth:
Placed:
Location:
Tie 1: Nails Xed in PP NW 84.7'
Tie 2: Nails Xed in cutoff PP NE 26.1'
Tie 3: Nails Xed in PP SW 31.1'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Corner: SE
Date:
Located: CONC. MON.
Depth: 6" BELOW GRADE
Placed:
Location:
Tie 1: N&C PP NW. 31.3'
Tie 2: N&C BRACE POST SE. 48.4'
Tie 3:
Tie 4:
Remarks:


Surveyor's Record Section 17


Surveyor's Record Section 20


Surveyor's Record Section 16


Surveyor's Record Section 21

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2024, Murray County Minnesota