Township:

Section:

Corner: NW
Date: JUNE 7, 1973
Located: CONC. MON.
Depth:
Placed: STEEL PIN
Location: 5" BELOW GRADE
Tie 1: N&C PP SE. 58.60'
Tie 2: STEEL PIN CENTERLINE TWP. ROAD S. 200'
Tie 3:
Tie 4:
Remarks:


Corner: NW
Date: July 17, 2018
Located: Nothing
Depth:
Placed: Survey Spike with seal #43844
Location: On centerline of east-west road and centerline of north-south road.
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: NW
Date: Sept. 8, 2012
Located: 1/2" Rebar
Depth: 5" Down
Placed:
Location: Centerline
Tie 1: Northing = 110678.871
Tie 2: Easting = 479700.292
Tie 3: Elev. = 1707.136
Tie 4:
Remarks: Bent over, Shot at the Base of Pin.


Surveyor's Record Section 25


Surveyor's Record Section 23


Surveyor's Record Section 26


Surveyor's Record Section 24

Corner: N1/4
Date: Sept. 5, 2012
Located: 1/2" Iron Pin
Depth: 8" Down
Placed:
Location: Centerline
Tie 1: Northing = 110677.963
Tie 2: Easting = 482336.743
Tie 3: Elev. = 1707.852
Tie 4:
Remarks:


Corner: N1/4
Date: JUNE 7, 1973
Located: CONC. MON.
Depth: 0.3' BELOW NEW SURFACE
Placed: STEEL PIN
Location: PIN AT ANGLE OVER TOP OF MON.
Tie 1: CHISELED "X" TOP METAL BRACKET W. END FE. ENT. CULV. N. 40.0'
Tie 2: N&C PP SE. 84.22'
Tie 3: CHISELED "X" TOP METAL BRACKET FE. ENT. CULV. NE. 56.77'
Tie 4:
Remarks:


Corner: N1/4
Date: July 17, 2018
Located: Concrete Block
Depth:
Placed: Survey Spike with seal #43844
Location: On centerline of east-west road and with field line to the south and the fence line to the north.
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


1861 Field Notes


Surveyor's Record Section 25


Surveyor's Record Section 24

Corner: NE
Date: MAY 28, 1988
Located: CONC. MON.
Depth: 6" BELOW GRADE
Placed: 1/2" REBAR
Location: N. SIDE OF MON., LEVEL WITH TOP
Tie 1: N&C FE. POST E. 36.02'
Tie 2: N&C PP SE. 46.62'
Tie 3: CHISELED "X" RCP APRON NW. 43.35'
Tie 4: CHISELED "X" RCP APRON SW. 44.05'
Remarks:


Corner: NE
Date: June 1, 2015
Located: 1/2" Rebar and Concrete Monument with "X".
Depth: 0.5" below surface.
Placed: 5/8" x 3" Rebar above the "X" in concrete monument. 0.25' below surface.
Location:
Tie 1: N = 110668.926
Tie 2: 484969.173
Tie 3: 1692.039
Tie 4:
Remarks: Ties are good. Removed 1/2" rebar that was on the North side of concrete monument and placed the 5/8" x 3" rebar directly above "X" on monument.


Corner: NE
Date:
Located:
Depth:
Placed: CONC. STONE
Location:
Tie 1: TACK IN COR. FE. POST SW. 49.7'
Tie 2: TACK IN COR. FE. POST 41.0'
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: APRIL 16, 1903
Located:
Depth:
Placed: STONE
Location: IN GRADE
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: June 19, 2017
Located: 5/8" Iron
Depth:
Placed:
Location: 3' south of centerline of road to the west and in line with fence line east and on centerline of road to the north.
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 25


Surveyor's Record Section 24


Surveyor's Record Section 19


Surveyor's Record Section 30

Corner: W1/4
Date: Aug. 6, 2018
Located: Nothing
Depth:
Placed: 5/8" iron with seal #43844
Location: On centerline of north-south road and with fence to the west.
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


1861 Field Notes


Surveyor's Record Section 25


Surveyor's Record Section 26

Corner: CENTER
No information.


Surveyor's Record Section 25

Corner: E1/4
Date:
Located: CONC. STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. FE. POST W. ON LINE 36.8'
Tie 2: TACK IN COR. FE. POST NE. 49.6'
Tie 3:
Tie 4:
Remarks:


Corner: E1/4
Date: April 16, 2012
Located: Concrete block
Depth:
Placed: 5/8" Iron with seal #43844 on the north side of the stone
Location:
Tie 1: Nail & Seal in tel ped post SW 46.45'
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: E1/4
Date: MAY 1, 1988
Located: CONC. MON.
Depth: 6" BELOW GRAVEL SURFACE
Placed:
Location:
Tie 1: N&C BRACE POLE NW. 39.47'
Tie 2: N&C PP NE. 48.93'
Tie 3: N&C BRACE POLE SE. 41.80'
Tie 4:
Remarks:


Corner: E1/4
Date: Sept. 5, 2012
Located: Buetell Land Surveyors Pin
Depth: 8" Down
Placed:
Location: 1' West of Centerline
Tie 1: Northing = 108030.488
Tie 2: Easting = 484954.756
Tie 3: Elev. = 1726.145
Tie 4:
Remarks: This is coor. for the pin and not the concrete block.


Surveyor's Record Section 25


Surveyor's Record Section 30

Corner: SW
Date: May 16,2019
Located: Capped rebar stamped "Bueltel LS 43844"
Depth: Below the gravel surface 0.9'
Placed:
Location: In the Center of the intersection.
Tie 1: Wood post NW 46.63'
Tie 2: Mag Nail in the North face of the power pole SE 72.92'
Tie 3:
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


Corner: SW
Date: April 23, 2018
Located: 8"x8"x10" Stone
Depth:
Placed: 5/8" iron with seal #43844 over stone
Location: Center of intersection of east-west road and north-south road.
Tie 1: Nail and bottle cap in tel ped post NW 46.55'
Tie 2: Nail and bottle cap in old corner fence post SE 47.65'
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 25


Surveyor's Record Section 26


Surveyor's Record Section 35


Surveyor's Record Section 36

Corner: S1/4
Date: Aug. 6, 2018
Located: Nothing
Depth:
Placed: 5/8" iron with seal #43844
Location: 2' south of centerline east-west road
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


1861 Field Notes


Surveyor's Record Section 25


Surveyor's Record Section 36

Corner: SE
Date: June 1, 2015
Located: R/R spike.
Depth: 0.5' below surface.
Placed:
Location: 3' West of centerline of North-South road and 2' South of centerline of West road.
Tie 1: N = 105389.588
Tie 2: E = 484930.013
Tie 3: Elev. = 1722.273
Tie 4:
Remarks: All ties are gone.


Corner: SE
Date: 1971
Located: CONC. MON.
Depth:
Placed: R/R SPIKE
Location: ABOVE MON.
Tie 1: N&C FE. POST S/SE 41.72'
Tie 2: N&C TOP COR. POST NW. 49.58'
Tie 3: N&C COR. POST E. 33.66'
Tie 4: N&C PP SW. 46.78'
Remarks:


Corner: SE
Date: 1940
Located: CONC. MON.
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: SE
Date: Aug. 6, 2018
Located: 5/8" Iron
Depth:
Placed:
Location: 3' west and 2' south of center of intersection of roads.
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: SE
Date:
Located: CONC. STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. FE. POST NE. 49.6'
Tie 2: TACK IN COR. FE. POST W. ON LINE 36.8'
Tie 3:
Tie 4:
Remarks:


Surveyor's Record Section 25


Surveyor's Record Section 36


Surveyor's Record Section 30


Surveyor's Record Section 31

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2024, Murray County Minnesota