Township:

Section:

Corner: NW
Date: SEPT. 19, 1927
Located: STONE 10"x10"x18"
Depth:
Placed:
Location:
Tie 1: FE. COR. NE. 45.6'
Tie 2: TP SE. 38.5'
Tie 3: FE. COR. SW. 45.5'
Tie 4: FE. COR. NW. 45.0'
Remarks:


Corner: NW
Date: MARCH 22, 2007
Located: P.K. NAIL
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: NW
Date: JULY 26, 1899
Located:
Depth:
Placed: 2 STONES
Location: IN GRADE ON TOP OF EACH OTHER.
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: J. W. Woolstencroft Established Corner as Per Surveyor Record Book.


Corner: NW
Date: 1940
Located:
Depth:
Placed: STONE
Location:
Tie 1: TACK IN COR. FE. POST SE. 42.8'
Tie 2: TACK IN COR. FE. POST NE. 45.9'
Tie 3:
Tie 4:
Remarks: AS PER OLD SURVEYOR RECORD BOOK. TIES NO GOOD.


Corner: NW
Date: APRIL 3, 1931
Located: STONE
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: J. W. Woolstencroft Located Corner as Per Surveyor Record Book.


Surveyor's Record Section 30


Surveyor's Record Section 24


Surveyor's Record Section 25


Surveyor's Record Section 19

Corner: N1/4
Date: APRIL 26, 1901
Located: STONE 10"x12"x18"
Depth:
Placed:
Location: N. SIDE OF GRADE
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: N1/4
Date: ARPIL 7, 1967
Located:
Depth:
Placed: IRON PIN (ASSUMED)
Location:
Tie 1: N&C COR. FE. POST N. 36.55'
Tie 2: 1ST STEEL FE. POST NE. 50.3'
Tie 3:
Tie 4:
Remarks:


Corner: N1/4
Date: March 15, 2006
Located: PK Nail over an iron pin
Depth:
Placed:
Location:
Tie 1: Chiseled X in W end in CMP SW 36.5'
Tie 2: Chiseled X in E end in CMP SE 40.6'
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Corner: N1/4
Date: JUNE 13, 1969
Located: IRON PIN
Depth:
Placed:
Location:
Tie 1: CHISELED "X" ON TOP OF CULV. NW 39.35'
Tie 2: CHISELED "X" ON TOP OF CULV. SW 37.75'
Tie 3:
Tie 4:
Remarks:


Corner: N1/4
Date: MAY 6, 1993
Located: IRON PIN
Depth: 2" BELOW SURFACE
Placed:
Location:
Tie 1: CHISELED "X" ON CULV. END SE. 40.63'
Tie 2: CHISELED "X" CULV. END SW. 36.58'
Tie 3:
Tie 4:
Remarks: PLACED P.K. NAIL OCT. 12, 1993.


Corner: N1/4
Date: March 22, 2007
Located: P.K. Nail
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


1861 Field Notes


Surveyor's Record Section 30


Surveyor's Record Section 19

Corner: NE
Date: JUNE 13, 1969
Located: IRON ROD
Depth:
Placed:
Location:
Tie 1: CHISELED "X" ON APRON SE. 51.15'
Tie 2: N&C PP SW. 60.55'
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: MAY 6, 1993
Located: CONC. MON. WITH "X"
Depth: 6" BELOW SURF.
Placed: PLACED LARGE NAIL
Location: ABOVE MON.
Tie 1: N&C YEILD SIGN NW. 44.42'
Tie 2: N&C PP SW. 60.48'
Tie 3: TOP CENTER OF TEL. PED. NW. 59.23'
Tie 4: PAINTED NUT YIELD SIGN SE. 48.30'
Remarks: PLACED P.K. NAIL OCT. 12, 1993


Corner: NE
Date: March 5, 2008
Located:
Depth:
Placed: Mag. Nail
Location: 3' north of centerline of east-west road
Tie 1: Telephone ped NW 59.05'
Tie 2: Telephone ped NE 60.56'
Tie 3: N&C in PP SW 60.49'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Corner: NE
Date: APRIL 26, 1901
Located:
Depth:
Placed: STONE AND STAKE
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: APRIL 6, 1967
Located: 3/4" IRON PIN
Depth: 9" BELOW GRADE
Placed:
Location:
Tie 1: N&C TEL. PED. NW. 45.65'
Tie 2: N&C PP SW. 44.3'
Tie 3: N&C COR. FE. POST NE. 47.4'
Tie 4:
Remarks:


Corner: NE
Date: APRIL 2, 1999
Located: P,K, NAIL AT SURFACE, 3/4" IRON PIN BELOW FROM MURRAY CO. RECORDS
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: Nov. 2, 1992
Located: 3/4" rebar
Depth: 6" down
Placed:
Location:
Tie 1: Top SE corner of telephone ped NW 59.05'
Tie 2: 1/2"x30" rebar with survey cap #17518 NE 59.57'
Tie 3: Nail & bottle cap in PP up 3.5' SW 60.49'
Tie 4:
Remarks: Kevin Jongerius
Corner Certification


Surveyor's Record Section 30


Surveyor's Record Section 19


Surveyor's Record Section 20


Surveyor's Record Section 29

Corner: W1/4
Date: SEPT. 19, 1927
Located: STONE
Depth:
Placed:
Location:
Tie 1: FE. COR. E. 31.7' & S. 3.8'
Tie 2:
Tie 3: FE. COR. W. 33.8' & S. 3.8'
Tie 4:
Remarks:


Corner: W1/4
Date: Feb. 13, 2008
Located: PK Nail
Depth:
Placed:
Location: In centerline of TH 91
Tie 1: PK Nail in corner fence post W 58.00'
Tie 2: Double nail in corner fence post E 66.40'
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Corner: W1/4
Date: Aug. 9, 2006
Located:
Depth:
Placed: PK Nail
Location: 3' west of centerline of TH 91
Tie 1: PK Nail in corner fence post W 58.03'
Tie 2: Set ref corner NE 75.95'
Tie 3: Set ref corner SE 63.73'
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


Surveyor's Record Section 30


Surveyor's Record Section 25

Corner: CENTER
No information.


Surveyor's Record Section 30

Corner: E1/4
Date: FEB. 26, 2007
Located: IRON STAKE W/ CAP 44563
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: E1/4
Date: March 13, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location: In line with fence to the east
Tie 1: Nails Xed in PP SW 91.6'
Tie 2: Nails Xed in Tree NE 82.0'
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1861 Field Notes


Surveyor's Record Section 30


Surveyor's Record Section 29

Corner: SW
Date: OCT. 8, 2001
Located: GIN SPK. INPLACE AS PER MnDOT PLANS
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: SW
Date: Aug. 9, 2006
Located:
Depth:
Placed: PK Nail
Location: 1.7' west of centerline
Tie 1: MHD Disc in CMP NW 72.81'
Tie 2: MHD Disc in CMP NE 70.23'
Tie 3: Disc 5107N SE 101.40'
Tie 4: PK Nail in corner fence post SW 75.16'
Remarks: Westwood Professional Services
Corner Certification


Corner: SW
Date: SEPT. 19, 1927
Located: STONE
Depth:
Placed:
Location: IN GRADE
Tie 1: FE. COR. NE. 42.4'
Tie 2: TP SE. 38.5'
Tie 3: FE. COR. SW. 45.6'
Tie 4: FE. COR. NW. 45.0'
Remarks:


Corner: SW
Date: June 27, 1951
Located: 8" stone monument
Depth:
Placed: 30" precast concrete monument with aluminum cap down 1'
Location: 5.5' east of centerline of TH 91
Tie 1: MHD disc in 6' precast concrete monument NE 62.9'
Tie 2: Nail & disc in E end of CMP NE 69.22'
Tie 3: Nail & disc in W end of CMP NW 78.19'
Tie 4: Nail & disc in PP NW 80.9'
Remarks: MN DNR LS
Corner Certification


Corner: SW
Date: Feb. 27, 2008
Located: PK Nail
Depth:
Placed:
Location:
Tie 1: Top bolt of stop sign post NE 39.40'
Tie 2: Top NW corner of telephone ped SE 62.30'
Tie 3: PK Nail in corner fence post SW 81.80'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Surveyor's Record Section 30


Surveyor's Record Section 25


Surveyor's Record Section 36


Surveyor's Record Section 31

Corner: S1/4
Date: Aug. 9, 2006
Located:
Depth:
Placed: 1/2" pipe with cap #42604
Location: On centerline of east-west road
Tie 1: Set witness monument NW 32.45'
Tie 2: Set witness monument NE 33.23'
Tie 3: Chiseled X in E end of RCP SE 24.83'
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


Corner: S1/4
Date: Feb. 13, 2008
Located: 3/4" iron pipe
Depth:
Placed:
Location: In line with fence to the south & 5' west of field division to the north
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1861 Field Notes


Surveyor's Record Section 30


Surveyor's Record Section 31

Corner: SE
Date: March 9, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location: At intersection of roads
Tie 1: Nails Xed in PP NW 54.1'
Tie 2: Top center of telephone ped SE 62.4'
Tie 3: Top NE corner of power box NW 47.2'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Surveyor's Record Section 30


Surveyor's Record Section 31


Surveyor's Record Section 29


Surveyor's Record Section 32

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2024, Murray County Minnesota