Corner: NW Date: JULY 20, 1981 Located: Depth: Placed: 5/8" REBAR Location: Tie 1: N&C PP NW. 47.22' Tie 2: N&C TEL. PED. SE. 47.19' Tie 3: Tie 4: Remarks: DUG WITH BACKHOE FOUND NOTHING, 4.5' WEST OF CENTERLINE OF RD
Surveyor?s Record Section 36
Surveyor?s Record Section 26
Surveyor?s Record Section 35
Surveyor?s Record Section 25 |
Corner: N1/4 No information.
1861 Field Notes
Surveyor?s Record Section 36
Surveyor?s Record Section 25 |
Corner: NE Date: OCT. 19, 2004 Located: IRON PIN W/ CAP NO. 19092 Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Moseng Land Surveying
Corner: NE Date: JULY, 1900 Located: GOV. STAKE Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NE Date: Aug 11, 2016 Located: Iron Railroad spike at the center of the intersecting Township Roads. Depth: 1.1' Below the gravel surface. Placed: Location: 2' south of the E-W Township Rd Centerline, and 1' west of N-S Rd Centerline Tie 1: Northing- 200426.451
Tie 2: Easting- 548357.465, Elev.- 1504.823 Tie 3: Tie 4: Remarks: Placed pink ribbon above the railroad spike and also at 6" above the spike. Murray County Coordinates & Geoid 99 used.
Surveyor?s Record Section 36
Surveyor?s Record Section 25
Surveyor?s Record Section 30
Surveyor?s Record Section 31 |
Corner: W1/4 Date: August 27, 2013 Located: 5/8" Rebar Depth: 3" Down Placed: Location: Centerline Tie 1: Northing = 197785.418 Tie 2: Easting = 543067.701 Tie 3: Elev. = 1523.042 Tie 4: Remarks:
Corner: W1/4 Date: JULY 18, 1981 Located: Depth: Placed: 5/8" REBAR Location: Tie 1: CHISELED "X" N. END OF CULVERT WEST 24.12' Tie 2: FE. POST NW. 32.80' Tie 3: N&C PP NW. 99.95' Tie 4: Remarks: DUG WITH BACKHOE FOUND NOTHING
1861 Field Notes
Surveyor?s Record Section 36
Surveyor?s Record Section 35 |
Corner: CENTER No information.
Surveyor?s Record Section 36 |
Corner: E1/4 Date: AUG. 12, 2010 Located: Depth: Placed: IRON PIPE W/ CAP NO. 23008. Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Surveyor?s Record Section 36
Surveyor?s Record Section 31 |
Corner: SW Date: August 27, 2013 Located: 3/4" Rebar Depth: 8" Down Placed: Location: 2' North of Centerline Tie 1: Northing = 195148.081 Tie 2: Easting = 543072.077 Tie 3: Elev. = 1514.378 Tie 4: Remarks:
Corner: SW Date: APRIL 23, 1932 Located: Depth: Placed: STONE IN GRADE Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: SW Date: Aug. 26,2020 Located: NO. 8 REBAR WITHOUT CAP Depth: DOWN 0.6' Placed: Location: Tie 1: MAG NAIL IN NE FACE NW 47.27' Tie 2: NO. 3 REBAR WITH REF. CAP SE 53.92' Tie 3: SIGN POST NE 36.72' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: SW Date: JULY 21, 1989 Located: CONC. MON. ABOVE STEEL SHAFT Depth: STEEL SHAFT WAS 21" BELOW SURFACE. CONC. MON. WAS AT SURFACE. Placed: 1"x11" REBAR Location: ABOVE STEEL SHAFT, 4" BELOW SURFACE. Tie 1: N&C PP NW. 44.36' Tie 2: N&C PP SW. 101.75' Tie 3: N&C TEL. PED. SE. 47.10' Tie 4: Remarks: CONC. MON. WAS REMOVED AND 1"x11" WAS PUT IN ITS PLACE.
Surveyor?s Record Section 36
Surveyor?s Record Section 35
Surveyor's Record Section 2
Surveyor's Record Section 1 |
Corner: S1/4 Date: JULY 21, 1989 Located: FIELD STONE & WOODEN HUB, WITH CONC. MON. ABOVE. Depth: FIELD STONE 24" BELOW GRADE. MON. AT SURF. Placed: 3/4"x9.5" REBAR Location: ABOVE MON., 2" BELOW SURFACE Tie 1: N&C PP NE. 80.10' Tie 2: 1"x2" HUB NORTH IN FE. LINE 70.95' Tie 3: Tie 4: Remarks: CONC. MON. OVER POINTED FIELDSTONE WITH A WOODEN HUB ON N. SIDE OF STONE
Corner: S1/4 Date: Aug. 26,2020 Located: NO. 6 REBAR WITHOUT CAP Depth: DOWN 0.2' Placed: Location: Tie 1: NO. 3 REBAR WITH REF. CAP NW 57.15' Tie 2: NO. 3 REBAR WITH REF. CAP SW 52.58' Tie 3: NAIL & DISK IN SW FACE OF POWER POLE NE 79.74' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: S1/4 Date: August 27, 2013 Located: 3/4" Rebar Depth: 4" Down Placed: Location: Centerline Tie 1: Northing = 195138.682 Tie 2: Easting = 545710.890 Tie 3: Elev. = 1520.095 Tie 4: Remarks:
Surveyor?s Record Section 36
Surveyor's Record Section 1 |
Corner: SE Date: JULY 21, 1989 Located: CONC. MON. ABOVE FIELD STONE AND 2"x2" HUB Depth: FIELD STONE IS 3.7' DEEP WITH MON. AT SURFACE Placed: 3/4"x8" REBAR Location: ABOVE MON. 2" BELOW SURFACE Tie 1: N&C FE. COR. SW. 36.56' Tie 2: N&C PP NW. 47.80' Tie 3: SW. COR. POWER BOX NE. 59.12' Tie 4: Remarks:
Corner: SE Date: Aug. 26,2020 Located: NO. 6 REBAR Depth: DOWN 0.6' Placed: Location: Tie 1: FND NAIL WITH BOTTLE CAP IN SE FACE PP NW 47.09' Tie 2: SIGN POST SE 31.25' Tie 3: SW CORNER OF UTILITY BOX NE 70.25' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: SE Date: 1940 Located: CONCRETE STONE Depth: Placed: Location: Tie 1: TACK IN COR. FE. POST NW. 46.7' Tie 2: TACK IN COR. FE. POST NE. 51.3' Tie 3: Tie 4: Remarks:
Corner: SE Date: August 27, 2013 Located: 3/4" Rebar Depth: 6" Down Placed: Location: 3' North of Centerline Tie 1: Northing = 195143.522 Tie 2: Easting = 548372.284 Tie 3: Elev. = 1533.530 Tie 4: Remarks: