Corner: NW Date: JUNE 18, 1971 Located: IRON PIPE Depth: FLUSH WITH BIT. Placed: STEEL PIN Location: ABOVE PIN Tie 1: N&C PP SW. 67.59' Tie 2: "X" TOP R.C. PIPE FL END NW. 50.63' Tie 3: 3/8" REBAR SE. 80.78' Tie 4: Remarks:
Corner: NW Date: APRIL 7, 1992 Located: Depth: Placed: P.K. NAIL Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NW Date: June 2, 2015 Located: Depth: Placed: Mag Nail Location: At surface. Tie 1: N = 221631.523 Tie 2: E = 537737.189 Tie 3: Elev. = 1451.337 Tie 4: Remarks:
Corner: NW Date: July 29, 2015 Located: Mag Nail. Depth: Placed: Location: On Centerline of CSAH 38. Tie 1: N: 221631.523, E: 537737.189. Tie 2: N&C PP SW. 67.59' Tie 3: "X" TOP R.C. PIPE FL END NW. 50.63'
Tie 4: 3/8" REBAR SE. 80.78' Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor?s Record Section 11
Surveyor?s Record Section 3
Surveyor?s Record Section 10
Surveyor?s Record Section 2 |
Corner: N1/4 Date: APRIL 3, 1991 Located: STEEL PIN Depth: 0.6' BELOW GRADE Placed: 8" REBAR APRIL 7, 1998 Location: ABOVE STONE Tie 1: 3/8" REBAR NW. 30.80' Tie 2: 3/8" REBAR NE. 34.58' Tie 3: 3/8" REBAR SW. 29.88' Tie 4: Remarks:
Corner: N1/4 Date: Located: FIELD STONE Depth: Placed: STEEL PIN Location: ABOVE STONE Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
1861 Field Notes
Surveyor?s Record Section 11
Surveyor?s Record Section 2 |
Corner: NE Date: APRIL 3, 1991 Located: FIELD STONE 6"x14"x10", STEEL PIN Depth: 0.2' BELOW GRADE Placed: STEEL PIN Location: 3" BELOW GRADE Tie 1: N&C PP SW. 58.77' Tie 2: 3/8" REBAR NE. 52.18' Tie 3: TOP EDGE CONC. PIPE SE. 43.95' Tie 4: Remarks:
Corner: NE Date: Aug. 29, 2008 Located: Nothing Depth: Placed: Survey Spike with seal #43844 Location: Tie 1: Nail & bottle cap in PP SW 58.67' Tie 2: Nail & bottle cap in PP NE 52.18' Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: NE Date: APRIL 8, 1992 Located: STEEL PIN Depth: Placed: 1/2 "x8" REBAR Location: Tie 1: N&C PP SW. 58.77' Tie 2: 3/8" REBAR NE. 52.18' Tie 3: TOP EDGE CONC. PIPE SE. 43.95' Tie 4: Remarks:
Corner: NE Date: Located: Field Stone 6 X 14 X 10 Depth: 3" Below the Surface Placed: Steel Pin Location: Tie 1: N&C P.P. SW. 58.7' Tie 2: N&C P.P. NE. 81.45' Tie 3: Top edge concrete pipe SE 43.95' Tie 4: Remarks:
Surveyor?s Record Section 11
Surveyor?s Record Section 2
Surveyor's Record Section 1
Surveyor?s Record Section 12 |
Corner: W1/4 Date: APRIL 4, 1991 Located: STEEL PIN Depth: FLUSH WITH BIT. Placed: P.K. NAIL ON APRIL 7, 1992 Location: ABOVE PIN Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: W1/4 Date: JUNE 18, 1971 Located: IRON PIPE Depth: Placed: STEEL PIN Location: ABOVE PIN Tie 1: N&C PP NW. 58.95' Tie 2: "X" TOP C.M.P. NE. 78.55' Tie 3: 3/8" REBAR SE. 44.05' Tie 4: Remarks:
Corner: W1/4 Date: July 7, 2015 Located: Depth: AT SURFACE Placed: MAG NAIL Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
1861 Field Notes
Surveyor?s Record Section 11
Surveyor?s Record Section 10 |
Corner: CENTER No information.
Surveyor?s Record Section 11 |
Corner: E1/4 Date: Aug. 29, 2008 Located: Nothing Depth: Placed: 1" Iron Pipe with seal #43844 Location: In line with the fence to the west and in the centerline of road Tie 1: Nail and seal in corner fence post W 39.55' Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
1861 Field Notes
Surveyor?s Record Section 11
Surveyor?s Record Section 12 |
Corner: SW Date: Located: Depth: Placed: STONE Location: Tie 1: TACK IN LIGHT POLE NW. 41.3' Tie 2: TACK IN COR. POST NE. 44.6' Tie 3: BOTTOM BOLT ON STEEL POST SE. 41.4' Tie 4: Remarks:
Corner: SW Date: APRIL 4, 1991 Located: STEEL PIN Depth: FLUSH WITH BIT. Placed: P.K. NAIL ON APRIL 7, 1992 Location: ABOVE PIN Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: SW Date: July 7, 2015 Located: Depth: AT SURFACE Placed: MAG NAIL Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: SW Date: JUNE 18, 1971 Located: IRON PIPE Depth: Placed: STEEL PIN Location: ABOVE PIN Tie 1: TOP TURNBUCKLE C.M.P. SW. 54.35' Tie 2: N&C PP SE. 74.39' Tie 3: 3/8" REBAR NW. 72.40' Tie 4: Remarks:
Corner: SW Date: July 15, 2004 Located: PK nail over Iron Pin Depth: Flush with bit. surface Placed: Location: Centerline of intersection of CSAH 21 & CSAH 38 Tie 1: 3/8" rebar NW 72.40' Tie 2: Mag nail with Orange Tag in SW face of PP SE 74.62' Tie 3: Top turnbuckle of 24" CMP SW 54.35' Tie 4: Remarks: Yaggy Colby Associates Corner Certification
Surveyor?s Record Section 11
Surveyor?s Record Section 10
Surveyor?s Record Section 15
Surveyor?s Record Section 14 |
Corner: S1/4 Date: July 15, 2004 Located: Nothing Depth: Placed: 3/4" iron pipe with cap #22422, 0.2' below gravel surface Location: Centerline of east-west twp road and fence line to the south Tie 1: East face 18" spike mag nail with orange tag N/NE 67.17' Tie 2: 1/2" rebar NE 48.86' Tie 3: 1/2" rebar SE 50.50' Tie 4: Remarks: Yaggy Colby Associates Corner Certification
1861 Field Notes
Surveyor?s Record Section 11
Surveyor?s Record Section 14 |
Corner: SE Date: Aug. 29, 2008 Located: Nothing Depth: Placed: 1" pipe with seal #43844 Location: Tie 1: Nail & seal in telephoneped guard post SW 44.94' Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor?s Record Section 11
Surveyor?s Record Section 14
Surveyor?s Record Section 12
Surveyor?s Record Section 13 |