Corner: NW Date: APRIL 3, 1991 Located: FIELD STONE 6"x14"x10", STEEL PIN Depth: 0.2' BELOW GRADE Placed: STEEL PIN Location: 3" BELOW GRADE Tie 1: N&C PP SW. 58.77' Tie 2: 3/8" REBAR NE. 52.18' Tie 3: TOP EDGE CONC. PIPE SE. 43.95' Tie 4: Remarks:
Corner: NW Date: Aug. 29, 2008 Located: Nothing Depth: Placed: Survey Spike with seal #43844 Location: Tie 1: Nail & bottle cap in PP SW 58.67' Tie 2: Nail & bottle cap in PP NE 52.18' Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: NW Date: APRIL 8, 1992 Located: STEEL PIN Depth: Placed: 1/2 "x8" REBAR Location: Tie 1: N&C PP SW. 58.77' Tie 2: 3/8" REBAR NE. 52.18' Tie 3: TOP EDGE CONC. PIPE SE. 43.95' Tie 4: Remarks:
Corner: NW Date: Located: Field Stone 6 X 14 X 10 Depth: 3" Below the Surface Placed: Steel Pin Location: Tie 1: N&C P.P. SW. 58.7' Tie 2: N&C P.P. NE. 81.45' Tie 3: Top edge concrete pipe SE 43.95' Tie 4: Remarks:
Surveyor?s Record Section 12
Surveyor?s Record Section 2
Surveyor?s Record Section 11
Surveyor's Record Section 1 |
Corner: N1/4 Date: JAN. 11, 1971 Located: FIELD STONE 11"x9"x7" Depth: 1/3' BELOW GRADE Placed: STEEL PIN Location: ABOVE STONE Tie 1: STEEL PIN INSLOPE NW. 38.54' Tie 2: STEEL PIN INSLOPE NE. 30.98' Tie 3: STEEL PIN INSLOPE S. 26.00' Tie 4: Remarks: DUG AROUND AND UNDER SMALL FIELD STONE FOUND NOTHING, HOLE WAS 18'x4.5'x4.5' FIELD STONE WAS CONSIDERED TOO SMALL
Corner: N1/4 Date: MAY 11, 1899 Located: Depth: Placed: STONE Location: Tie 1: TACK IN FE. POST SW. 36.9' Tie 2: EDGE OF STEEL POST SE. 38.0' Tie 3: STEEL POST 12.6' EAST OF STONE Tie 4: Remarks:
Corner: N1/4 Date: Aug. 29, 2008 Located: Nothing Depth: Placed: Survey Spike with seal #43844 Location: Tie 1: Steel Pin in slope NW 38.54' Tie 2: Steel Pin in slope NE 30.98' Tie 3: Steel Pin in slope S 26.00' Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
1861 Field Notes
Surveyor?s Record Section 12
Surveyor's Record Section 1 |
Corner: NE Date: MAY 11, 1899 Located: Depth: Placed: CROCKERY & GLASS IN GRADE Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NE Date: APR. 3, 1991 Located: STEEL PIN Depth: 0.4' BELOW GRADE Placed: 1/2"X8" REBAR APRIL 3, 1991 Location: SURFACE Tie 1: N&C PP SW. 57.97' Tie 2: N&C TEL. RISER POST NE. 61.80 Tie 3: TOP OF BURR ON APRON BAND SE. 49.95' Tie 4: Remarks: PK NAIL IN 2004 ABOVE PIN.
Corner: NE Date: Aug. 29, 2008 Located: Depth: Placed: Survey Spike with seal #43844 Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: NE Date: JULY 6, 1931 Located: FIELD STONE OVER FIELD STONE Depth: Placed: STEEL PIN IN 1967 Location: ABOVE OLD STONE 3" BELOW GRADE Tie 1: N&C PP SW. 57.90' Tie 2: N&C TP NE. 61.90' Tie 3: TOP BOLT CULVERT APRON SE. 50.1' Tie 4: Remarks:
Corner: NE Date: Nov. ,17 1998 Located: 1/2" iron stake Depth: at road surface Placed: Location: Tie 1: Nail and seal in PP SW 58.03' Tie 2: Top of rural water valve SE 64.40' Tie 3: Nail and seal in top of guard post next to telephone ped NE 62.00' Tie 4: Remarks: Moseng Land Surveying Corner Certification
Surveyor?s Record Section 12
Surveyor's Record Section 1
Surveyor?s Record Section 6
Surveyor?s Record Section 7 |
Corner: W1/4 Date: Aug. 29, 2008 Located: Nothing Depth: Placed: 1" Iron Pipe with seal #43844 Location: In line with the fence to the west and in the centerline of road Tie 1: Nail and seal in corner fence post W 39.55' Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
1861 Field Notes
Surveyor?s Record Section 12
Surveyor?s Record Section 11 |
Corner: CENTER No information.
Surveyor?s Record Section 12 |
Corner: E1/4 Date: October 11, 2012 Located: Buetel Land Surveyor Pin Depth: 5" Down Placed: Location: 1' West of Centerline Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: E1/4 Date: Aug. 21, 2008 Located: An unrecorded 18" flat top stone with 1/2"x24" smooth iron over it Depth: Placed: 1" pipe with seal #43488 Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor?s Record Section 12
Surveyor?s Record Section 7 |
Corner: SW Date: Aug. 29, 2008 Located: Nothing Depth: Placed: 1" pipe with seal #43844 Location: Tie 1: Nail & seal in telephoneped guard post SW 44.94' Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor?s Record Section 12
Surveyor?s Record Section 11
Surveyor?s Record Section 14
Surveyor?s Record Section 13 |
Corner: S1/4 Date: APRIL 2, 1977 Located: FIELD STONE Depth: 6" BELOW GRAVEL SURFACE Placed: 3/4" BOLT Location: ABOVE STONE Tie 1: N&C COR. POST S. 35.82' Tie 2: N&C COR. POST N/NE 34.45' Tie 3: N&C 2ND POST NW. 36.81' Tie 4: Remarks:
Corner: S1/4 Date: Aug. 29, 2008 Located: 3/4" bolt Depth: Placed: Location: Tie 1: Nail and seal in PP N 33.35' Tie 2: Top center of telphone ped SW 43.77' Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
1861 Field Notes
Surveyor?s Record Section 12
Surveyor?s Record Section 13 |
Corner: SE Date: Aug. 29, 2008 Located: Sioux Engineering Pin Depth: Placed: Location: Tie 1: Nail and seal in PP NE 44.95' Tie 2: Nail and seal in PP SE 46.25' Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: SE Date: APR. 2, 1977 Located: GREY ROCK WITH 4" SQ. TOP Depth: 1.5' BELOW GRAVEL SURFACE Placed: IRON PIN Location: ABOVE STONE Tie 1: N&C PP NE. 49.00' Tie 2: N&C PP SE. 44.46' Tie 3: Tie 4: Remarks:
Surveyor?s Record Section 12
Surveyor?s Record Section 13
Surveyor?s Record Section 7
Surveyor?s Record Section 18 |