Township:

Section:

Corner: NW
Date: APRIL 15, 2005
Located: CORNER LOCATION AS PER MnDOT HWY. PLAN
Depth:
Placed: GIN SPIKE, 5/8" IRON STAKE W/ CAP NO. 23008
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: NW
Date: June 27, 1989
Located:
Depth:
Placed: 1.25"x1.25"x5" perforated steel tube with aluminum cap stamped "DNR Survey Marker" down 0.1'
Location: 10' north of centerline of TH 30 & on centerline of road south
Tie 1: 3/4"x24" iron rod down 0.1' NW 16.50'
Tie 2: 3/4"x24" iron rod down 0.1' NE 16.50'
Tie 3:
Tie 4:
Remarks: MN DNR LS
Corner Certification


Surveyor?s Record Section 17


Surveyor?s Record Section 7


Surveyor?s Record Section 18


Surveyor?s Record Section 8

Corner: N1/4
Date: March 21, 2006
Located: Chiseled X on concrete bridge deck
Depth:
Placed:
Location:
Tie 1: Chiseled X on top of NW flared end bridge NW 45.4'
Tie 2: Chiseled X on top of SE flared end bridge SE 53.0'
Tie 3: Chiseled X on top of SW flared end bridge SW 52.7'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Corner: N1/4
Date: APRIL 15, 2005
Located: CORNER LOCATION AS PER MnDOT HWY. PLAN
Depth:
Placed: SET GIN SPIKE, 5/8" IRON STAKE W/ CAP NO. 23008
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


1866 Field Notes


Surveyor?s Record Section 17


Surveyor?s Record Section 8

Corner: NE
Date: July 30, 2007
Located:
Depth:
Placed: Survey spike with seal #43844
Location: 2.9' north of PK Nail at PI of centerline of TH 30
Tie 1: MNDOT reference marker in cutoff PP NW 87.30'
Tie 2: MNDOT reference marker in PP SW 100.65'
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: NE
Date:
Located: BRASS PLUG
Depth: CONC. SURF.
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: May 9, 2014
Located: Buetel Survey Monument
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Surveyor?s Record Section 17


Surveyor?s Record Section 8


Surveyor?s Record Section 9


Surveyor?s Record Section 16

Corner: W1/4
Date: March 21, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location:
Tie 1: Chiseled X in N end of 18" CMP NE 40.3'
Tie 2: Chiseled X in S end of 18" CMP E/NE 29.1'
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1866 Field Notes


Surveyor?s Record Section 17


Surveyor?s Record Section 18

Corner: CENTER
No information.


Surveyor?s Record Section 17

Corner: E1/4
Date:
Located: STONE
Depth:
Placed:
Location:
Tie 1: TACK IN BRACE POST SE. 33.6'
Tie 2: TACK IN TEL POLE NE. 37.0'
Tie 3:
Tie 4:
Remarks:


Corner: E1/4
Date: June 15, 2015
Located: 5/8" Iron Stake.
Depth: 0.7' below surface
Placed:
Location: On centerline of North-South road and in line with East fence.
Tie 1: N = 150366.013
Tie 2: E = 463939.527
Tie 3: Elev. = 1654.921
Tie 4:
Remarks: All ties from 2006 are gone.


Corner: E1/4
Date: March 21, 2006
Located: 5/8" rebar
Depth:
Placed:
Location: In gravel road and opposite fenceline running east
Tie 1: Nails Xed on PP W 50.4'
Tie 2: Nails Xed on wood fence post E 51.1'
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1866 Field Notes


Surveyor?s Record Section 17


Surveyor?s Record Section 16

Corner: SW
Date: March 21, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location:
Tie 1: Chiseled X on NW end box culvert N/NW 57.9'
Tie 2: Chiseled X on SE end box culvert NE 47.5'
Tie 3: Chiseled X on SW end box culvert NW 22.4'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Surveyor?s Record Section 17


Surveyor?s Record Section 18


Surveyor?s Record Section 19


Surveyor?s Record Section 20

Corner: S1/4
Date: July 11, 2017
Located: 5/8" rebar w/cap #44563 down 0.6'
10" x 12" x 16" Stone down 4' and 1.9' from rebar.
Depth:
Placed: 4" x 20" Cast Iron Monument down 0.8' Over top of Stone.
Location: Centerline of east-west road and with field line south.
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Great River Energy Survey Crew Jacob R. Cunningham
Corner Certification


Corner: S1/4
Date: March 21, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location:
Tie 1: Nails Xed on PP SW 113.6'
Tie 2: Nails Xed on PP SE 167.9'
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1866 Field Notes


Surveyor?s Record Section 17


Surveyor?s Record Section 20

Corner: SE
Date: June 10, 2015
Located: DNR Monument with Cap.
Depth: 11" below surface.
Placed:
Location: Same as DNR description.
Tie 1: N = 147719.455
Tie 2: E = 463924.623
Tie 3: Elev. = 1669.153
Tie 4:
Remarks: Tie #1 from 1983 is gone.


Corner: SE
Date: Nov. 3, 1983
Located: 3/4"x8" rebar over a 10"x12"x18" field stone
Depth: Down 0.3'
Placed: 1.25"x1.25"x20" perforated steel tube with aluminum cap stamped "DNR Survey Marker" down 0.4'
Location: On centerline of north-south road & 1' south of centerline of road to west
Tie 1: Nail & DNR Disc in N side of PP up 5? SW 66.79'
Tie 2: PK Nail in N end of CMP NE 41.60'
Tie 3: PK Nail in S end of CMP SE 40.94'
Tie 4:
Remarks: MN DNR LS
Corner Certification


Corner: SE
Date: July 13, 2017
Located: 1.25"x1.25"x20" perforated steel tube with aluminum cap stamped "DNR Survey Marker" down 0.5'
Depth:
Placed:
Location: Centerline of north-south road and centerline of west road.
Tie 1: PK Nail in North End of 24" CMP NW 40.03'
Tie 2: PK Nail in North End of 24" CMP NE 41.60'
Tie 3: PK Nail in South End of 24" CMP SE 40.94'
Tie 4: NE Corner Substation Fence SW 62.80'
Remarks: Great River Energy Survey Crew Jacob R. Cunningham
Corner Certification


Surveyor?s Record Section 17


Surveyor?s Record Section 20


Surveyor?s Record Section 16


Surveyor?s Record Section 21

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2024, Murray County Minnesota