Township:

Section:

Corner: NW
Date: March 21, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location:
Tie 1: Chiseled X on NW end box culvert N/NW 57.9'
Tie 2: Chiseled X on SE end box culvert NE 47.5'
Tie 3: Chiseled X on SW end box culvert NW 22.4'
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Surveyor?s Record Section 20


Surveyor?s Record Section 18


Surveyor?s Record Section 19


Surveyor?s Record Section 17

Corner: N1/4
Date: July 11, 2017
Located: 5/8" rebar w/cap #44563 down 0.6'
10" x 12" x 16" Stone down 4' and 1.9' from rebar.
Depth:
Placed: 4" x 20" Cast Iron Monument down 0.8' Over top of Stone.
Location: Centerline of east-west road and with field line south.
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Great River Energy Survey Crew Jacob R. Cunningham
Corner Certification


Corner: N1/4
Date: March 21, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location:
Tie 1: Nails Xed on PP SW 113.6'
Tie 2: Nails Xed on PP SE 167.9'
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1866 Field Notes


Surveyor?s Record Section 20


Surveyor?s Record Section 17

Corner: NE
Date: June 10, 2015
Located: DNR Monument with Cap.
Depth: 11" below surface.
Placed:
Location: Same as DNR description.
Tie 1: N = 147719.455
Tie 2: E = 463924.623
Tie 3: Elev. = 1669.153
Tie 4:
Remarks: Tie #1 from 1983 is gone.


Corner: NE
Date: Nov. 3, 1983
Located: 3/4"x8" rebar over a 10"x12"x18" field stone
Depth: Down 0.3'
Placed: 1.25"x1.25"x20" perforated steel tube with aluminum cap stamped "DNR Survey Marker" down 0.4'
Location: On centerline of north-south road & 1' south of centerline of road to west
Tie 1: Nail & DNR Disc in N side of PP up 5? SW 66.79'
Tie 2: PK Nail in N end of CMP NE 41.60'
Tie 3: PK Nail in S end of CMP SE 40.94'
Tie 4:
Remarks: MN DNR LS
Corner Certification


Corner: NE
Date: July 13, 2017
Located: 1.25"x1.25"x20" perforated steel tube with aluminum cap stamped "DNR Survey Marker" down 0.5'
Depth:
Placed:
Location: Centerline of north-south road and centerline of west road.
Tie 1: PK Nail in North End of 24" CMP NW 40.03'
Tie 2: PK Nail in North End of 24" CMP NE 41.60'
Tie 3: PK Nail in South End of 24" CMP SE 40.94'
Tie 4: NE Corner Substation Fence SW 62.80'
Remarks: Great River Energy Survey Crew Jacob R. Cunningham
Corner Certification


Surveyor?s Record Section 20


Surveyor?s Record Section 17


Surveyor?s Record Section 16


Surveyor?s Record Section 21

Corner: W1/4
Date: March 21, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location: In gravel road and opposite of fenceline running west
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1866 Field Notes


Surveyor?s Record Section 20


Surveyor?s Record Section 19

Corner: CENTER
Date: NOV. 10, 1912
Located:
Depth:
Placed: GREY BOULDER
Location: IN ROAD
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Surveyor?s Record Section 20

Corner: E1/4
Date: NOV. 10, 1912
Located:
Depth:
Placed: STONE 10"x12"x20"
Location: IN ROAD
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: E1/4
Date: Nov. 2, 1983
Located: 3/4"x8" rebar over a 10"x12"x20" field stone
Depth: Down 2'
Placed: 1.25"x1.25"x20" perforated steel tube with aluminum cap stamped "DNR Survey Marker" down 0.3'
Location: On centerline of north-south road & 1' north of fence to east and 2.5' south of fence to west
Tie 1: Nail & DNR Disc in S side of PP up 2? SW 54.12''
Tie 2: Nail & DNR Disc in N side of corner fence post up 2? W/NW 50.20'
Tie 3:
Tie 4:
Remarks: MN DNR LS
Corner Certification


Corner: E1/4
Date: July 12, 2017
Located: 1.25"x1.25"x20" perforated steel tube with aluminum cap stamped "DNR Survey Marker" down 0.8'
Depth:
Placed:
Location:
Tie 1: Nail & DNR Disc in N side of corner fence post up 2? NW 50.20'
Tie 2: Top of DNR Sign E 54.5'
Tie 3: Nail & plastic disk N side of PP up 1' SW 53.6'
Tie 4:
Remarks: Great River Energy Survey Crew Jacob R. Cunningham
Corner Certification


Corner: E1/4
Date:
Located: STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. POST E. FENCE 3' SOUTH OF STONE 33.1'
Tie 2: TACK IN TP NE. 37.8'
Tie 3: TACK IN W. COR. POST FENCE ON LINE 33.9'
Tie 4:
Remarks:


Corner: E1/4
Date: June 10, 2015
Located: DNR Monument with Cap
Depth: 11" below surface
Placed:
Location: On centerline of North-South road and 1' North of East fence and 2.5' South of West fence.
Tie 1: N = 145081.837
Tie 2: E = 463918.286
Tie 3: Elev. = 1660.563
Tie 4:
Remarks: All ties are gone except DNR tie #2.


1866 Field Notes


Surveyor?s Record Section 20


Surveyor?s Record Section 21

Corner: SW
Date: March 21, 2006
Located:
Depth:
Placed: 5/8" rebar with cap #44563
Location: At centerline of intersection
Tie 1: Nails Xed in PP NW 125.4'
Tie 2: Nails Xed in wood post SE 47.9'
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


Corner: SW
Date: April 29, 2013
Located: 11"x12" Field Stone
Depth: 2.3' below surface in unmixed soil
Placed: 5/8" iron stake with survey cap #23008 over stone
Location: Center of Township Road
Tie 1: PP with nails "X" on side NW 125.78'
Tie 2: Wood Post with nails "X" on side SE 46.15'
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying
Prior Corner set by Ulteig in 2006 is 3.93' north and 1.25' east of actual corner.
Corner Certification


Surveyor?s Record Section 20


Surveyor?s Record Section 19


Surveyor?s Record Section 30


Surveyor?s Record Section 29

Corner: S1/4
Date: NOV. 11, 1912
Located:
Depth:
Placed: STONE 10"x12"x18"
Location: IN A ROAD
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: S1/4
Date: July 12, 2017
Located: 1/2" Iron Pipe down 0.2'
10" x 12" x 18" Stone down 4' and 1' from iron pipe.
Depth:
Placed: 4" x 20" cast iron monument down 8" Over Stone.
Location: Centerline of east-west road and slightly west of fence line north.
Tie 1: PK nail and plastic disk east end of 18" CMP SE 33.86'
Tie 2: PK nail and plastic disk west end of 18" CMP SW 27.05'
Tie 3:
Tie 4:
Remarks: Great River Energy Survey Crew Jacob R. Cunningham
Corner Certification


Corner: S1/4
Date: March 21, 2006
Located: 1/2" iron pipe
Depth:
Placed:
Location: In centerline of gravel road
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Ulteig Engineering, Inc.
Corner Certification


1866 Field Notes


Surveyor?s Record Section 20


Surveyor?s Record Section 29

Corner: SE
Date: Nov. 2, 1983
Located: 3/4"x8" rebar over a 10"x12"x22" field stone
Depth: Down 3"
Placed: 1.25"x1.25"x12" perforated steel tube with aluminum cap stamped "DNR Survey Marker" down 0.4'
Location: On centerline of north-south road and centerline of east-west road
Tie 1: Nail & DNR Disc in SW side of PP up 4? NW 57.79'
Tie 2: Nail & DNR Disc in SE side of yield sign post up 3? NE 45.73'
Tie 3: Nail & DNR Disc in SE side of yield sign post up 4? SW 48.32'
Tie 4:
Remarks: MN DNR LS
Corner Certification


Corner: SE
Date:
Located: STONE 10"x12"x22"
Depth:
Placed:
Location:
Tie 1: FE. COR. NW. 45.6'
Tie 2: TP NE. 72.5'
Tie 3:
Tie 4:
Remarks:


Corner: SE
Date: June 10, 2015
Located: 1/2" Iron Pipe
Depth: 1.1' below surface.
Placed:
Location: Centerline of North-South road and 1' North of centerline of East road.
Tie 1: N = 142441.995
Tie 2: E = 463914.899
Tie 3: Elev. = 1699.280
Tie 4:
Remarks: Only tie is Tie #1 from DNR.


Surveyor?s Record Section 20


Surveyor?s Record Section 29


Surveyor?s Record Section 21


Surveyor?s Record Section 28

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2024, Murray County Minnesota