Corner: NW Date: OCT. 8, 1974 Located: FIELD STONE Depth: 8" BELOW BIT. Placed: 18" STEEL REBAR Location: ABOVE STONE, BIT. SURF. Tie 1: HEAD SPIKE PP SE. 59.54' Tie 2: CENTER TOP TEL. PED. NE. 60.80' Tie 3: N&C PP NW. 61.97' Tie 4: Remarks: PLACED P.K. NAIL JUNE 10, 1997
Corner: NW Date: July 18, 2017 Located: Depth: At the top of the asphalt surface. Placed: MAG Nail Location: on Centerline of N-S Township Rd and 0.3' South of the Centerline of CSAH 20. Tie 1: N: 216467.189 Tie 2: E: 458798.100 Tie 3: Elev. 1649.85 Tie 4: Remarks: MAG nail placed after 2017 Bituminous overlay project. Murray County Coordinates & Geoid 99 used
Surveyor?s Record Section 17
Surveyor?s Record Section 7
Surveyor?s Record Section 18
Surveyor?s Record Section 8 |
Corner: N1/4 Date: OCT. 8, 1974 Located: FIELD STONE Depth: 3' BELOW BITUM. MAT. Placed: 18" STEEL REBAR Location: ABOVE STONE, BITUM. SURF. Tie 1: N&C COR. POST N/NE 52.36' Tie 2: STEEL PIN INSLOPE SW. 24.69' Tie 3: N&C PP SE. 102.16' Tie 4: Remarks: RR. SPIKE 1983
Corner: N1/4 Date: Julu 18, 2017 Located: Depth: At the top of the asphalt surface. Placed: MAG Nail Location: 0.75' North of CSAH 20 Centerline and 1.5' west of the fence line heading northerly. Tie 1: N: 216464.650 Tie 2: E: 461426.608 Tie 3: Elev. 1627.719 Tie 4: Remarks: MAG nail placed after 2017 Bituminous overlay project. Murray County Coordinates & Geoid 99 used
1861 Field Notes
Surveyor?s Record Section 17
Surveyor?s Record Section 8 |
Corner: NE Date: Dec. 6, 2012 Located: P.K. Nail Depth: Placed: Location: Tie 1: Fence Post SW 65.52' Tie 2: Corner Fence Post SE 59.90' Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: NE Date: Located: Depth: Placed: RR. SPIKE Location: Tie 1: N&C PP SW. 68.17' Tie 2: N&C PP SE. 68.45' Tie 3: N&C PP NW. 58.23' Tie 4: Remarks:
Corner: NE Date: July 18, 2017 Located: Depth: At the top of the asphalt surface. Placed: MAG Nail Location: On Centerline of CSAH 20 and on Centerline of the Township road heading Northerly and 2' east of the township road heading Southerly. Tie 1: N: 216463.903 Tie 2: E: 464067.901 Tie 3: Elev. 1661.182 Tie 4: Remarks: MAG nail placed after 2017 Bituminous overlay project.
Murray County Coordinates & Geoid 99 used
Surveyor?s Record Section 17
Surveyor?s Record Section 8
Surveyor?s Record Section 9
Surveyor?s Record Section 16 |
Corner: W1/4 No information.
1861 Field Notes
Surveyor?s Record Section 17
Surveyor?s Record Section 18 |
Corner: CENTER No information.
Surveyor?s Record Section 17 |
Corner: E1/4 Date: March 10, 2000 Located: Spike over a 1"x1"x18" pointed wood stake Depth: Placed: 5/8" iron with seal #11943 on south side of stake Location: Tie 1: Nail & seal in PP E 35.55' Tie 2: Nail & seal in croner fence post W 34.21' Tie 3: Tie 4: Remarks: Moseng Land Surveying Corner Certification
Corner: E1/4 Date: August 21, 2013 Located: Moseng Land Surveyor Pin # 11943 Depth: 6" Down Placed: Location: Centerline Tie 1: Northing = 213829.505 Tie 2: Easting = 464060.778 Tie 3: Elev. = 1663.590 Tie 4: Remarks:
1861 Field Notes
Surveyor?s Record Section 17