Corner: NW Date: AUG. 26, 1925 Located: Depth: Placed: 1/2" ROD AND STONE Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NW Date: Aug. 10, 2015 Located: Steel Fence Post Depth: 0.4' below surface Placed: Location: On line with centerlines of intersecting roads. Tie 1: N = 226958.527 Tie 2: E = 479776.939 Tie 3: Elev. = 1565.875 Tie 4: Remarks: No ties
Surveyor?s Record Section 1
Surveyor?s Record Section 2 |
Corner: N1/4 No information.
Surveyor?s Record Section 1 |
Corner: NE No information.
Surveyor?s Record Section 1
Surveyor?s Record Section 6 |
Corner: W1/4 Date: AUG. 26, 1925 Located: Depth: Placed: IRON STAKE, LIME STONE 8"x10"x16" ON N. SIDE Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: W1/4 Date: July 20, 2017 Located: Nothing Depth: Placed: 5/8" Iron with Seal #50343 Location: Tie 1: Nail & bottle cap in PP SE 62.30' Tie 2: Nail & bottle cap in fence post W 50.60' Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: W1/4 Date: Aug. 10, 2015 Located: Stones, but were unsure if they were monuments for section corner. Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
1861 Field Notes
Surveyor?s Record Section 1
Surveyor?s Record Section 2 |
Corner: CENTER No information.
Surveyor?s Record Section 1 |
Corner: E1/4 No information.
Surveyor?s Record Section 1
Surveyor?s Record Section 6 |
Corner: SW Date: July 12, 2010 Located: Depth: Placed: 1" pipe with seal #43844 Location: Tie 1: Nail & survery marker in telephone ped post NW 66.55' Tie 2: Nail & survey marker in PP NE 58.60' Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: SW Date: 10/30/1915 Located: STONE 8" X 8" TON TOP Depth: Placed: Location: Tie 1: TACK COR. FE. POST SE 45.8' Tie 2: "X" ON WEST END 24" CULVERT SW 37.5' Tie 3: TACK T.P. NW 46.9' Tie 4: Remarks:
Corner: SW Date: Aug. 11, 2015 Located: Iron Pipe with cap #43844 Depth: 0.3' below surface Placed: Location: 1' South of centerline of West road and on line with centerline of North-South road. Tie 1: N = 221690.695 Tie 2: E = 479835.432 Tie 3: Elev. = 1608.649 Tie 4: Remarks: Ties are good.
Surveyor?s Record Section 1
Surveyor?s Record Section 2
Surveyor?s Record Section 11
Surveyor?s Record Section 12 |
Corner: S1/4 Date: July 12, 2010 Located: 12" pointed field stone Depth: Placed: 5/8" iron with seal #43844 on east and west side of stone and chiseled X on stone Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
1861 Field Notes
Surveyor?s Record Section 1
Surveyor?s Record Section 12 |
Corner: SE Date: July 12, 2010 Located: Nothing Depth: Placed: 1" Pipe with seal #43844 Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor?s Record Section 1
Surveyor?s Record Section 12
Surveyor?s Record Section 6
Surveyor?s Record Section 7 |