Corner: NW Date: JULY 1, 1979 Located: 12" POINTED FIELD STONE ON TILE CHIPS Depth: 0.9' BELOW GRADE Placed: Location: Tie 1: N&C PP NE. 42.30' Tie 2: N&C COR. POST SW. 46.89' Tie 3: NAIL IN 1"x2" HUB SE. 25.74' Tie 4: Remarks:
Corner: NW Date: Sept. 25, 1980 Located: 1/2" iron rebar Depth: Placed: Location: In Centerline of North-South road & 2.0' south of East-West Centerline of road Tie 1: Nail and bottle cap in PP NE 42.29' Tie 2: 2"x2" Hub with nail in top SE 34.63' Tie 3: Nail and bottle cap in corner fence post SW 46.86' Tie 4: Remarks: Martin Land Surveying Corner Certification
Corner: NW Date: MAY 9, 1899 Located: Depth: Placed: STONE IN ROAD Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Surveyor?s Record Section 19
Surveyor?s Record Section 13
Surveyor?s Record Section 24
Surveyor?s Record Section 18 |
Corner: N1/4 No information.
1861 Field Notes
Surveyor?s Record Section 19
Surveyor?s Record Section 18 |
Corner: NE Date: Sept. 13, 2001 Located: Large field stone Depth: Placed: 5/8" Rebar with seal #11943 at road surface and three iron rods around the stone Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Moseng Land Surveying Corner Certification
Surveyor?s Record Section 19
Surveyor?s Record Section 18
Surveyor?s Record Section 17
Surveyor?s Record Section 20 |
Corner: W1/4 Date: SEPT. 25, 1980 Located: FIELD STONE Depth: 36" BELOW GRADE Placed: 1/2" REBAR WITH "LS 12967" CAP Location: OVER STONE Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Martin Land Surveying Corner Certification
Surveyor?s Record Section 19
Surveyor?s Record Section 24 |
Corner: CENTER No information.
Surveyor?s Record Section 19 |
Corner: E1/4 Date: Sept. 13, 2001 Located: Bridge spike Depth: Placed: 5/8" iron spike with seal #11943 Location: In line with fence to the east Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Moseng Land Surveying Corner Certification
1861 Field Notes
Surveyor?s Record Section 19
Surveyor?s Record Section 20 |
Corner: SW Date: 8/26/2024 Located: Depth: Placed: Location: Tie 1: N-205725.209 Tie 2: E-548347.083 Tie 3: Tie 4: Remarks: MAG nail placed after Bituminous overlay project.
At the top of the asphalt surface.
Corner: SW Date: SEPT. 25, 1980 Located: OLD IRON VALVE Depth: FLUSH WITH ROAD SURFACE Placed: LEFT MON. AS FOUND Location: Tie 1: N&C PP NE. 59.43' Tie 2: CHISELED "X" E. END RCP SE. 37.76' Tie 3: CHISELED "X" W. END RCP SW. 40.68' Tie 4: N&C TEL PED W/SW 61.08' Remarks: Martin Land Surveying Corner Certification
Surveyor?s Record Section 19
Surveyor?s Record Section 24
Surveyor?s Record Section 25
Surveyor?s Record Section 30 |
Corner: S1/4 Date: OCT. 19, 2004 Located: 2" DIA. DISK Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Moseng Land Surveying
Corner: S1/4 Date: NOV. 1969 Located: FIELD STONE Depth: Placed: STEEL PIN Location: ABOVE STONE Tie 1: N&C COR. POST S/SE 49.93' Tie 2: N&C BRACE POST NE. 58.47' Tie 3: Tie 4: Remarks:
Corner: S1/4 Date: 8/26/2024 Located: Depth: Placed: Location: Tie 1: N- 205725.346 Tie 2: E-550740.805 Tie 3: Tie 4: Remarks: MAG nail placed after Bituminous overlay project.
At the top of the asphalt surface.
1861 Field Notes
Surveyor?s Record Section 19
Surveyor?s Record Section 30 |
Corner: SE Date: NOV. 1969 Located: FIELD STONE Depth: Placed: STEEL PIN Location: ABOVE STONE Tie 1: N&C PP NW. 57.19' Tie 2: N&C COR. POST NE. 66.98' Tie 3: N&C COR. POST SE. 52.30' Tie 4: Remarks:
Corner: SE Date: 8/26/2024 Located: Depth: Placed: Location: Tie 1: N-205738.075 Tie 2: E-553379.912 Tie 3: Tie 4: Remarks: MAG nail placed after Bituminous overlay project.
At the top of the asphalt surface.
Corner: SE Date: OCT. 19, 2004 Located: 2" DIA. DISK Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Moseng Land Surveying
Surveyor?s Record Section 19
Surveyor?s Record Section 30
Surveyor?s Record Section 20
Surveyor?s Record Section 29 |