Township:

Section:

Corner: NW
Date: APRIL 2, 1991
Located: STEEL PIN
Depth: 5" BELOW GRADE
Placed: 1/2"x8" REBAR APRIL 8, 1992
Location: ABOVE STEEL PIN 3" BELOW GRADE
Tie 1: N&C PP NE. 60.53'
Tie 2: "X" TOP TEL. RISER NW. 58.60'
Tie 3: 3/8" REBAR SW. 58.54'
Tie 4:
Remarks:


Corner: NW
Date: 1967
Located: FIELD STONE
Depth:
Placed: STEEL PIN
Location: ABOVE FIELD STONE 3" BELOW GRADE
Tie 1: N&C PP NE. 60.4'
Tie 2: N&C TP NW. 70.4'
Tie 3: N&C TP SW. 68.3'
Tie 4:
Remarks:


Surveyor?s Record Section 9


Surveyor?s Record Section 5


Surveyor?s Record Section 8


Surveyor?s Record Section 4

Corner: N1/4
Date: APRIL 3,1991
Located: STEEL PIN
Depth: 7" BELOW GRADE
Placed: 1/2"x8" REBAR IN APRIL 8, 1992
Location: ABOVE STEEL PIN
Tie 1: N&C PP N. 48.72'
Tie 2: N&C COR FENCE POST S. 50.66'
Tie 3: 3/8" REBAR NW. 38.65
Tie 4:
Remarks:


1861 Field Notes


Surveyor?s Record Section 9


Surveyor?s Record Section 4

Corner: NE
Date: OCT. 14 1930
Located: FIELD STONE, IN LINE WITH FENCE LINE NORTH.
Depth: 4" BELOW GRADE
Placed: STEEL PIN IN 1967
Location: ABOVE STONE
Tie 1: N&C PP NW. 60.30'
Tie 2:
Tie 3:
Tie 4:
Remarks: GOV. MOUND IS ALSO LISTED WITH NO DATE. IT ALSO SAID ESTABLISHED 1/4 COR N. AND 1/4 COR W. AND ON LINE. DATE OCT. 13, 1930.


Corner: NE
Date: APRIL 3, 1991
Located: STEEL PIN
Depth: 4" BELOW GRADE
Placed: 1/2"x8" REBAR IN APRIL 8, 1992
Location: OVER STEEL PIN
Tie 1: N&C PP NW. 60.30'
Tie 2: N&C TEL. RISER POST SE. 89.50'
Tie 3: 3/8" REBAR NE. 60.98'
Tie 4: N&C YIELD SIGN POST SE. 51.40'
Remarks:


Surveyor?s Record Section 9


Surveyor?s Record Section 4


Surveyor?s Record Section 3


Surveyor?s Record Section 10

Corner: W1/4
Date: June 29, 2015
Located: 3/8" Iron Stake
Depth: 0.4' below surface.
Placed:
Location: 1.0' West of centerline of North-South road and in line with East fence.
Tie 1: N = 218951.702
Tie 2: E = 558605.156
Tie 3: Elev. = 1408.169
Tie 4:
Remarks: Tie in PP SE 64.32' is there.


Corner: W1/4
Date: JUNE 19,1899
Located: 8"x10"x18" STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. POST E. ON LINE 40.2'
Tie 2: TACK IN COR. POST W. ON LINE 40.2'
Tie 3:
Tie 4:
Remarks:


Corner: W1/4
Date: Oct. 31, 2011
Located: 3/8" iron pipe
Depth:
Placed:
Location: in line with fences to the east and west
Tie 1: Nail and bottle cap in PP SE 64.32'
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: W1/4
Date: March 21, 2000
Located:
Depth:
Placed: 3/8" REBAR
Location: 0.2' BELOW GRADE
Tie 1: N&C PP SE. 64.32'
Tie 2: REBARS WEST 96.91', 194.41' & 298.52'
Tie 3:
Tie 4:
Remarks:


1861 Field Notes


Surveyor?s Record Section 9


Surveyor?s Record Section 8

Corner: CENTER
Date: JUNE 19, 1899
Located: STONE 6"x18"x16"
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Surveyor?s Record Section 9

Corner: E1/4
Date: JUNE 19, 1899
Located: FIELD STONE
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: E1/4
Date: September 12, 2017
Located: 15" X 7" Stone Down 1.7'
Depth:
Placed: 3/4" x 24" Rebar with plastic cap stamped "MN DNR LS 17003" OVER FOUND STONE. Down .3'
Location: Is on Centerline of the N-S Rd and in line with the Fence heading easterly. and in line with the field division heading westerly.
Tie 1: Set 3/8" x 24" Rebar with plastic cap stamped "MN DNR RP" Down .3' (15.41') NE
Tie 2: Set 3/8" x 24" Rebar with plastic cap stamped "MN DNR RP" Down .3 (17.21') SE
Tie 3: Set 3/8" x 24" Rebar with plastic cap stamped "MN DNR RP" Down .3' (17.10') NW
Tie 4: N= 219000.507, E= 563917.610
Remarks: MN DNR LS
Corner Certification


Corner: E1/4
Date: APR. 8, 1988
Located: FIELD STONE
Depth: 21" BELOW GRAVEL SURFACE
Placed: 3/4"x14" STEEL PIN
Location: ABOVE STONE
Tie 1: N&C BRACE POST W./NW. 33.58'
Tie 2: N&C COR. POST E. 35.92'
Tie 3:
Tie 4:
Remarks:


1861 Field Notes


Surveyor?s Record Section 9


Surveyor?s Record Section 10

Corner: SW
Date: MAR 21 2000
Located:
Depth: 0.2' BELOW GRADE
Placed: 3/8" REBAR
Location:
Tie 1: N&C PP E/NE 60.15'
Tie 2: "X" IN RCP CULVERT W/SW 56.7'
Tie 3:
Tie 4:
Remarks:


Corner: SW
Date: June 29, 2015
Located: Iron Stake with DNR cap.
Depth: 0.3' below surface.
Placed:
Location: 3' West of centerline of North-South road and in line with centerline of East-West road.
Tie 1: N = 216308.393
Tie 2: E = 558608.670
Tie 3: Elev. = 1411.462
Tie 4:
Remarks: DNR ties from 2009 are good.


Corner: SW
Date: JUNE 19, 1899
Located: 8"x10"x32" STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. POST NE. 48.7'
Tie 2: TACK IN COR POST SE. 48.3'
Tie 3:
Tie 4:
Remarks:


Corner: SW
Date: July 28, 2009
Located: 8"x10"x32" Broken Stone
Depth: 7.3' Down
Placed: 3/4"x24" Rebar with plastic cap stamped "MN DNR LS 17003"
Location: 0.4' Below Surface Over Stone
Tie 1: Nail and bottle cap in face of PP NE 60.53' (2000 Tie)
Tie 2: Chiseled X in top of 18" RCP Apron SW 56.36' (2000 Tie)
Tie 3:
Tie 4:
Remarks: MN DNR LS
Corner Certification


Surveyor?s Record Section 9


Surveyor?s Record Section 8


Surveyor?s Record Section 17


Surveyor?s Record Section 16

Corner: S1/4
Date: DEC. 18, 2009
Located: IRON MONUMENT INPLACE
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: S1/4
Date: JUNE 19, 1899
Located: STONE 6"x18"x16"
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: S1/4
Date: July 28, 2009
Located: 8"x12"x16" Stone
Depth: 0.8' Down
Placed: Railroad Spike over Stone 0.3' Down
Location: 3' South of east & west road in line with fence lines north & south
Tie 1: Nail and DNR Disc in E side of PP up 1.5' N 36.29'
Tie 2: Nail and DNR Disc in NE side of wood fence post up 1.5' SE 39.63'
Tie 3: Nail and DNR Disc in W side of corner fence post up 1.5' S 26.41'
Tie 4:
Remarks: MN DNR LS
Corner Certification


1861 Field Notes


Surveyor?s Record Section 9


Surveyor?s Record Section 16

Corner: SE
Date: DEC. 18, 2009
Located: IRON MONUMENT INPLACE
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: SE
Date: APR. 18, 1988
Located: FIELD STONE
Depth: 18" BELOW GRAVEL SURFACE
Placed: 3/4"x16" STEEL PIN ABOVE STONE
Location: ABOVE HIGH POINT OF STONE
Tie 1: N&C TEL. POLE NW. 44.15'
Tie 2: N&C WOOD COR. FE. POST SW. 48.24'
Tie 3:
Tie 4:
Remarks:


Corner: SE
Date: July 28, 2009
Located: 12"x6"x12" Stone
Depth: 1.5' Down
Placed: 3/4"x16" Steel Pin with plastic cap stamped "MN DNR LS 17003"
Location: Over Stone 0.3' Down
Tie 1: Nail and bottle cap in NE side of PP up 1.5' NW 44.20' (1988 Tie)
Tie 2: Nail and bottle cap in NW side of Corner fence post up 1.0' SW 48.52' (1988 Tie)
Tie 3: Set 3/4"x12" rebar with plastic cap stamped "MN DNR LS 17003" down 0.3' NOT THE SECTION CORNER S 9.28'
Tie 4:
Remarks: MN DNR LS
Corner Certification


Corner: SE
Date: JUNE 19, 1899
Located: 1" IRON STAKE
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Surveyor?s Record Section 9


Surveyor?s Record Section 16


Surveyor?s Record Section 10


Surveyor?s Record Section 15

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36