Corner: NW Date: AUG. 27,2020 Located: NO. 4 REBAR WITHOUT CAP Depth: FLUSH WITH ASPHALT Placed: Location: Tie 1: MAG IN SOUTHEAST FACE OF POWER POLE SW 58.75' Tie 2: R/W SIGN SE 153.48' Tie 3: R/W SIGN NE 153.87' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: NW Date: MAR 21 2000 Located: Depth: 0.2' BELOW GRADE Placed: 3/8" REBAR (ASSUMED) Location: Tie 1: N&C PP SW. 57.47' Tie 2: NAILS W. 155.00', 250.00' AND 346.00' Tie 3: Tie 4: Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.
Corner: NW Date: APRIL 14, 1978 Located: FOUND NOTHING Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: DUG WITH BACKHOE 6'x6'x6' HOLE.
Corner: NW Date: July 18, 2017 Located: Depth: At the top of asphalt surface. Placed: #4 Rebar Location: .25' west of Centerline of CSAH 42 & 1' North of the road heading easterly & 2' South of the road heading westerly. Tie 1: N: 200432.943 Tie 2: E: 558723.878 Tie 3: Elev.: 1447.413 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.
Corner: NW Date: JUNE 25, 1924 Located: Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: FOUND CORNER IN 1924.
Corner: NW Date: May 12, 2017 Located: #4 Rebar Depth: 1.35' Below the top of the asphalt surface. Placed: Location: On Centerline of CSAH 42 & On Centerline of the East Rd & 2' South of the Road heading westerly. Tie 1: N: 200432.937 Tie 2: E: 558723.855 Tie 3: Elev.:1445.863 Tie 4: Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap
Surveyor?s Record Section 33
Surveyor?s Record Section 29
Surveyor?s Record Section 32
Surveyor?s Record Section 28 |
Corner: N1/4 No information.
1861 Field Notes
Surveyor?s Record Section 33
Surveyor?s Record Section 28 |
Corner: NE Date: Aug 8, 2016 Located: Iron Pin with a Yellow survey cap denoting Martin. Depth: 1.1' Below the gravel surface. Placed: Location: On Centerline of the N-S Township Road & On Centerline of the E-W Township Road. Tie 1: Northing- 200460.631 Tie 2: Easting- 563999.222, Elev.- 1436.388 Tie 3: Tie 4: Remarks: Placed pink ribbon above the survey cap, also placed at 3" & 6" above the survey cap. Murray County Coordinates & Geoid 99 used
Corner: NE Date: Oct. 9, 1980 Located: Wooden lath and rotted hub Depth: Placed: 1/2" iron rebar with "LS 12967" cap or said lath and hub Location: At Twp road centerline intersection Tie 1: Brass Disc "LS 12967" & nail in PP NW 46.56' Tie 2: Top Dead Center of telephone ped SE 78.64' Tie 3: Tie 4: Remarks: Martin Land Surveying Corner Certification
Corner: NE Date: AUG. 27,2020 Located: NO. 4 REBAR WITH YELLOW CAP "LS 12967" Depth: DOWN 1.3' Placed: Location: Tie 1: MAG IN SOUTHWEST FACE OF POWER POLE NW 46.50' Tie 2: NO. 3 REBAR WITH REF. CAP SW 44.45' Tie 3: TOP CENTER OF TELEPHONE PEDESTAL SE 77.70' Tie 4: Remarks: Westwood Professional Services Corner Certification
Surveyor?s Record Section 33
Surveyor?s Record Section 28
Surveyor?s Record Section 27
Surveyor?s Record Section 34 |
Corner: W1/4 Date: MAR 21 2000 Located: Depth: 0.2' BELOW GRADE Placed: 3/8" REBAR Location: Tie 1: PK NAIL TOP OF CULV. NE. 44.34' Tie 2: PK NAIL TOP OF CULV. NW. 45.10' Tie 3: N&C PP SW. 82.45' Tie 4: REBAR E. 103.28', 196.67' AND 302.98' Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.
Corner: W1/4 Date: May 12, 2017 Located: #4 Rebar Depth: 1.3' Below the top of the asphalt surface. Placed: Location: 1' South of the fence heading westerly & .5' west of centerline of CSAH 42. Tie 1: N: 197783.393 Tie 2: E: 558743.987 Tie 3: Elev.:1435.642 Tie 4: Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap
Corner: W1/4 Date: Aug. 27, 2020 Located: NO. 4 REBAR WITHOUT CAP Depth: FLUSH WITH ASPHALT Placed: Location: Tie 1: MAG NAIL IN TOP OF NORTH END 15" CMP CULVERT NE 44.40' Tie 2: MAG NAIL IN SOUTHEAST SIDE OF POWER POLE SW 76.00' Tie 3: MAG NAIL IN TOP NORTH END 15" CMP CULVERT NW 45.00' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: W1/4 Date: APRIL 14,1978 Located: KOSOTA STONE Depth: Placed: STEEL PIN Location: ABOVE STONE @ SURFACE Tie 1: N&C PP SW. 75.80' Tie 2: N&C COR POST WEST 48.85' Tie 3: N&C WOOD POST NW. 49.33' Tie 4: Remarks:
Corner: W1/4 Date: AUG. 12, 2010 Located: IRON MONUMENT Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: W1/4 Date: July 18, 2017 Located: Depth: At the top of the asphalt surface. Placed: #4 Rebar Location: On CSAH 42 Centerline & 4' North of the fence heading easterly, On Centerline of the fence heading westerly. Tie 1: N: 197783.406 Tie 2: E: 558743.983 Tie 3: Elev.:1437.129 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.
1861 Field Notes
Surveyor?s Record Section 33
Surveyor?s Record Section 32 |
Corner: CENTER No information.
Surveyor?s Record Section 33 |
Corner: E1/4 Date: Oct. 9, 1980 Located: Field Stone Depth: Placed: 1/2" iron rebar with "LS 12967" cap over stone Location: In line with fences east-west and twp road centerline north-south Tie 1: Brass Disc "LS 12967" & nail in corner fence post SW 32.52' Tie 2: Brass Disc "LS 12967" & nail in corner fence post NE 32.03' Tie 3: Brass Disc "LS 12967" & nail in gate post SW 43.06' Tie 4: Remarks: Martin Land Surveying Corner Certification
Corner: E1/4 Date: Aug. 27, 2020 Located: NO. 4 REBAR WITH BROKEN CAP Depth: DOWN 0.5' Placed: Location: Tie 1: SEE CORNER CERT. ATTACHED Tie 2: Tie 3: Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: E1/4 Date: August 28, 2013 Located: Land Surveyor Cap and Pin # 12967 Depth: Down 5" Placed: Location: 2' West of Centerline of TWP. Road Tie 1: Northing = 197810.342 Tie 2: Easting = 564030.954 Tie 3: Tie 4: Remarks:
1861 Field Notes
Surveyor?s Record Section 33
Surveyor?s Record Section 34 |
Corner: SW Date: Located: CONCRETE STONE Depth: Placed: Location: Tie 1: TACK IN PP NW. 60.7' Tie 2: TACK IN COR. FE. POST SW. 54.6' Tie 3: Tie 4: Remarks: NO DATE
Corner: SW Date: May 12, 2017 Located: #4 Rebar Depth: 1.2' Below the top of the asphalt surface. Placed: Location: On Centerline of CSAH 42 & CSAH 14. Tie 1: N: 195131.537 Tie 2: E: 558765.344 Tie 3: Elev.: 1438.676 Tie 4: Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap
Corner: SW Date: Aug. 27, 2020 Located: NO. 4 REBAR WITHOUT CAP Depth: FLUSH WITH ASPHALT Placed: Location: Tie 1: NAIL & BOTTLE CAP IN SOUTHEAST FACE OF POWER POLE NW 61.06' Tie 2: STREET SIGN NE 53.26' Tie 3: NAIL & BOTTLE CAP IN NORTHEAST FACE OF POWER POLE SW 76.43' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: SW Date: APR. 13, 1978 Located: CONC. MON. Depth: 1.1' BELOW GRADE Placed: STEEL PIN Location: ABOVE MON. Tie 1: N&C SIGN POST NE. 42.60' Tie 2: N&C BRACE POST SW. 58.72' Tie 3: N&C PP NW. 62.10' Tie 4: Remarks:
Corner: SW Date: MAR. 21, 2000 Located: Depth: 0.2' BELOW GRADE Placed: 3/8" REBAR Location: Tie 1: N&C PP SW. 76.48' Tie 2: N&C PP NW. 61.58' Tie 3: NAILS WEST 155.0', 250.0', 340.0'. Tie 4: Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.
Corner: SW Date: July 18, 2017 Located: Depth: At the top of the asphalt surface. Placed: #4 Rebar Location: On Centerline of CSAH 14 & 42 Tie 1: N: 195131.569 Tie 2: E: 558765.257 Tie 3: Elev.: 1440.058 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.
Surveyor?s Record Section 33
Surveyor?s Record Section 32
Surveyor?s Record Section 5
Surveyor?s Record Section 4 |
Corner: S1/4 Date: DEC. 16, 2020 Located: 6" X 6" CONCRETE MONUMENT WITH "X" SCRIBED ON TOP, 0.8' BELOW GRADE Depth: Placed: RAILROAD SPIKE ABOVE CONCRETE MONUMENT Location: Tie 1: NO. 3 REBAR WITH REF. CAP NW 46.50' Tie 2: NO. 3 REBAR WITH REF. CAP SW 48.02' Tie 3: NO. 3 REBAR WITH REF. CAP SE 52.40' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: S1/4 Date: 1940 Located: CONCRETE STONE Depth: Placed: Location: Tie 1: TACK IN COR. FE. POST N. ON LINE 34.1' Tie 2: TACK IN FE. POST NW. 49.4' Tie 3: Tie 4: Remarks:
Corner: S1/4 Date: June 4, 2024 Located: RAILROAD SPIKE SET OVER STONE PER CORNER CERT. Depth: Placed: Location: Tie 1: N: 195143.383 Tie 2: E: 561408.205 Tie 3: REBAR TIE NW 46.50' Tie 4: REBAR TIE SW 48.02', SE 52.40' Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor?s Record Section 33
Surveyor?s Record Section 4 |
Corner: SE Date: Oct. 9, 1980 Located: Concrete Monument Depth: Placed: 1/2" iron rebar with "LS 12967" cap over monument Location: 1.5' west of north-south road and on centerline of east-west road Tie 1: Brass Disc "LS 12967" & nail in PP NW 44.40' Tie 2: Brass Disc "LS 12967" & nail in corner fence post NE 50.00' Tie 3: Brass Disc "LS 12967" & nail in guy pole SW 45.30' Tie 4: Remarks: Martin Land Surveying Corner Certification
Corner: SE Date: Aug. 27, 2020 Located: NO. 4 WITH BROKEN CAP Depth: DOWN 0.2' Placed: Location: Tie 1: SE CORNER OF ELECTRICAL CABINET NW 46.98' Tie 2: CENTER OF WATER GATE VALVE SW 54.23' Tie 3: CENTER OF WATER GATE VALVE NE 50.58' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: SE Date: 1940 Located: CONC. MON. Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: SE Date: August 28, 2013 Located: Surveyors Cap and Pin Depth: Down 2" Placed: Location: Centerline of CSAH 14 and 1.5' West of Centerline of North and South TWP. Road Tie 1: Northing = 195154.717 Tie 2: Easting = 564062.061 Tie 3: Tie 4: Remarks:
Corner: SE Date: June 4, 2024 Located: IRON WITH BROKEN CAP OVER A CONCRETE MONUMENT Depth: Placed: Location: Tie 1: N: 195154.710 Tie 2: E: 564062.056 Tie 3: SE CORNER ELEC. BOX NW 46.85' Tie 4: WATER VALVE NE 50.60', WATER VALVE SW 54.00' Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor?s Record Section 33
Surveyor?s Record Section 4
Surveyor?s Record Section 34
Surveyor?s Record Section 3 |