Township:

Section:

Corner: NW
Date: JULY, 1900
Located: STONE
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: NW
Date: Aug. 11, 2016
Located: Iron pin with a yellow survey cap # 19092 no other markings visible
Depth: .2' Below the gravel surface.
Placed:
Location: On Centerline of the E-W Township Road, and 6' west of the field break heading in the southerly direction.
Tie 1: Northing- 200449.850
Tie 2: Easting- 553446.860, Elev.- 1442.507
Tie 3:
Tie 4:
Remarks: Tied pink ribbon around the survey cap.
Murray County Coordinates & Geoid 99 used.


Corner: NW
Date: AUG. 12, 2010
Located: CAP NO. 19092
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: NW
Date: March 23, 2018
Located: Iron Stake
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Surveyor?s Record Section 32


Surveyor?s Record Section 30


Surveyor?s Record Section 31


Surveyor?s Record Section 29

Corner: N1/4
Date: March 23, 2018
Located: Iron Stake
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


1861 Field Notes


Surveyor?s Record Section 32


Surveyor?s Record Section 29

Corner: NE
Date: MAR 21 2000
Located:
Depth: 0.2' BELOW GRADE
Placed: 3/8" REBAR (ASSUMED)
Location:
Tie 1: N&C PP SW. 57.47'
Tie 2: NAILS W. 155.00', 250.00' AND 346.00'
Tie 3:
Tie 4:
Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.


Corner: NE
Date: APRIL 14, 1978
Located: FOUND NOTHING
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: DUG WITH BACKHOE 6'x6'x6' HOLE.


Corner: NE
Date: July 18, 2017
Located:
Depth: At the top of asphalt surface.
Placed: #4 Rebar
Location: .25' west of Centerline of CSAH 42 & 1' North of the road heading easterly & 2' South of the road heading westerly.
Tie 1: N: 200432.943
Tie 2: E: 558723.878
Tie 3: Elev.: 1447.413
Tie 4:
Remarks:
Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.


Corner: NE
Date: JUNE 25, 1924
Located:
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: FOUND CORNER IN 1924.


Corner: NE
Date: May 12, 2017
Located: #4 Rebar
Depth: 1.35' Below the top of the asphalt surface.
Placed:
Location: On Centerline of CSAH 42 & On Centerline of the East Rd & 2' South of the Road heading westerly.
Tie 1: N: 200432.937
Tie 2: E: 558723.855
Tie 3: Elev.:1445.863
Tie 4:
Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap


Corner: NE
Date: AUG. 27,2020
Located: NO. 4 REBAR WITHOUT CAP
Depth: FLUSH WITH ASPHALT
Placed:
Location:
Tie 1: MAG IN SOUTHEAST FACE OF POWER POLE SW 58.75'
Tie 2: R/W SIGN SE 153.48'
Tie 3: R/W SIGN NE 153.87'
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


Surveyor?s Record Section 32


Surveyor?s Record Section 29


Surveyor?s Record Section 28


Surveyor?s Record Section 33

Corner: W1/4
Date: AUG. 12, 2010
Located:
Depth:
Placed: 5/8" IRON STAKE W/ CAP NO. 23008
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


1861 Field Notes


Surveyor?s Record Section 32


Surveyor?s Record Section 31

Corner: CENTER
No information.


Surveyor?s Record Section 32

Corner: E1/4
Date: May 12, 2017
Located: #4 Rebar
Depth: 1.3' Below the top of the asphalt surface.
Placed:
Location: 1' South of the fence heading westerly & .5' west of centerline of CSAH 42.
Tie 1: N: 197783.393
Tie 2: E: 558743.987
Tie 3: Elev.:1435.642
Tie 4:
Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap


Corner: E1/4
Date: Aug. 27, 2020
Located: NO. 4 REBAR WITHOUT CAP
Depth: FLUSH WITH ASPHALT
Placed:
Location:
Tie 1: MAG NAIL IN TOP OF NORTH END 15" CMP CULVERT NE 44.40'
Tie 2: MAG NAIL IN SOUTHEAST SIDE OF POWER POLE SW 76.00'
Tie 3: MAG NAIL IN TOP NORTH END 15" CMP CULVERT NW 45.00'
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


Corner: E1/4
Date: APRIL 14,1978
Located: KOSOTA STONE
Depth:
Placed: STEEL PIN
Location: ABOVE STONE @ SURFACE
Tie 1: N&C PP SW. 75.80'
Tie 2: N&C COR POST WEST 48.85'
Tie 3: N&C WOOD POST NW. 49.33'
Tie 4:
Remarks:


Corner: E1/4
Date: AUG. 12, 2010
Located: IRON MONUMENT
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: E1/4
Date: July 18, 2017
Located:
Depth: At the top of the asphalt surface.
Placed: #4 Rebar
Location: On CSAH 42 Centerline & 4' North of the fence heading easterly, On Centerline of the fence heading westerly.
Tie 1: N: 197783.406
Tie 2: E: 558743.983
Tie 3: Elev.:1437.129
Tie 4:
Remarks:
Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.


Corner: E1/4
Date: MAR 21 2000
Located:
Depth: 0.2' BELOW GRADE
Placed: 3/8" REBAR
Location:
Tie 1: PK NAIL TOP OF CULV. NE. 44.34'
Tie 2: PK NAIL TOP OF CULV. NW. 45.10'
Tie 3: N&C PP SW. 82.45'
Tie 4: REBAR E. 103.28', 196.67' AND 302.98'
Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.


1861 Field Notes


Surveyor?s Record Section 32


Surveyor?s Record Section 33

Corner: SW
Date: 1934
Located: CONCRETE STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. FE. POST SW. 41.4'
Tie 2: TACK IN COR. FE. POST SE. 43.2'
Tie 3:
Tie 4:
Remarks:


Corner: SW
Date: AUG. 12, 2010
Located:
Depth:
Placed: 5/8" IRON STAKE W/ CAP NO. 23008
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: SW
Date: OCT. 28, 2008
Located: CONCRETE MONUMENT W/ X IN TOP
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Surveyor?s Record Section 32


Surveyor?s Record Section 31


Surveyor's Record Section 6


Surveyor's Record Section 5

Corner: S1/4
Date: OCT. 12, 1906
Located: FIELD STONE
Depth:
Placed:
Location:
Tie 1: TACK IN GATE POST N. 34.2'
Tie 2: TACK IN BLAZED FE. POST SW. 44'
Tie 3:
Tie 4:
Remarks:


Corner: S1/4
Date: OCT. 28, 2008
Located: 12" X 8" STONE
Depth:
Placed: IRON PIPE W/ CAP 23008
Location: OVER STONE
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying
Corner Certification


Corner: S1/4
Date: 1934
Located: FIELD STONE
Depth:
Placed:
Location:
Tie 1: TACK IN GATE POST N. 34.2'
Tie 2: TACK IN BLAZED FE. POST SW. 44.0'
Tie 3:
Tie 4:
Remarks:


Corner: S1/4
Date: APR. 3, 2025
Located: 3" survey spike with seal #23008. probed and hit stone
Depth:
Placed: 5/8" iron with seal #43844 in position of found survey spike
Location:
Tie 1: N: 195142.653
Tie 2: E: 556129.854
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor?s Record Section 32


Surveyor's Record Section 5

Corner: SE
Date:
Located: CONCRETE STONE
Depth:
Placed:
Location:
Tie 1: TACK IN PP NW. 60.7'
Tie 2: TACK IN COR. FE. POST SW. 54.6'
Tie 3:
Tie 4:
Remarks: NO DATE


Corner: SE
Date: May 12, 2017
Located: #4 Rebar
Depth: 1.2' Below the top of the asphalt surface.
Placed:
Location: On Centerline of CSAH 42 & CSAH 14.
Tie 1: N: 195131.537
Tie 2: E: 558765.344
Tie 3: Elev.: 1438.676
Tie 4:
Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap


Corner: SE
Date: Aug. 27, 2020
Located: NO. 4 REBAR WITHOUT CAP
Depth: FLUSH WITH ASPHALT
Placed:
Location:
Tie 1: NAIL & BOTTLE CAP IN SOUTHEAST FACE OF POWER POLE NW 61.06'
Tie 2: STREET SIGN NE 53.26'
Tie 3: NAIL & BOTTLE CAP IN NORTHEAST FACE OF POWER POLE SW 76.43'
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


Corner: SE
Date: APR. 13, 1978
Located: CONC. MON.
Depth: 1.1' BELOW GRADE
Placed: STEEL PIN
Location: ABOVE MON.
Tie 1: N&C SIGN POST NE. 42.60'
Tie 2: N&C BRACE POST SW. 58.72'
Tie 3: N&C PP NW. 62.10'
Tie 4:
Remarks:


Corner: SE
Date: MAR. 21, 2000
Located:
Depth: 0.2' BELOW GRADE
Placed: 3/8" REBAR
Location:
Tie 1: N&C PP SW. 76.48'
Tie 2: N&C PP NW. 61.58'
Tie 3: NAILS WEST 155.0', 250.0', 340.0'.
Tie 4:
Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.


Corner: SE
Date: July 18, 2017
Located:
Depth: At the top of the asphalt surface.
Placed: #4 Rebar
Location: On Centerline of CSAH 14 & 42
Tie 1: N: 195131.569
Tie 2: E: 558765.257
Tie 3: Elev.: 1440.058
Tie 4:
Remarks:
Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.


Surveyor?s Record Section 32


Surveyor's Record Section 5


Surveyor?s Record Section 33


Surveyor's Record Section 4

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36