Township:

Section:

Corner: NW
Date:
Located: STONE
Depth:
Placed:
Location:
Tie 1: TACK IN BLAZED FE. POST SE. 47.0'
Tie 2: TACK IN COR. FE. POST E. 32.4'
Tie 3:
Tie 4:
Remarks: STONE 6' N. OF FE. LINE RUNNING EAST


Corner: NW
Date: April 25, 1989
Located: Large field stone
Depth:
Placed: MNDOT Cast Iron Monument at pavement surface
Location: 2' east of centerline of twp road and 5' north of fence line east
Tie 1: Tie in PP NE 44.72'
Tie 2: Nail & bottle cap N side of corner fence post E/SE 33.40'
Tie 3:
Tie 4:
Remarks: MNDOT LS
Corner Certification


Corner: NW
Date: APRIL 17, 1979
Located: FIELD STONE
Depth: 18" BELOW GRADE
Placed: STEEL PIN
Location: ABOVE STONE
Tie 1: N&C COR. POST EAST 33.25'
Tie 2: N&C PP NE. 44.90'
Tie 3:
Tie 4:
Remarks:


Surveyor?s Record Section 12


Surveyor?s Record Section 2


Surveyor?s Record Section 11


Surveyor?s Record Section 1

Corner: N1/4
Date: OCT. 12, 1897
Located:
Depth:
Placed: GOV. MOUND
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


1861 Field Notes


1861 Field Notes Meandering Corners


Surveyor?s Record Section 12


Surveyor?s Record Section 1

Corner: NE
Date: OCT. 12, 1897
Located:
Depth:
Placed: STONE AND PITS
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Surveyor?s Record Section 12


Surveyor?s Record Section 1


Surveyor?s Record Section 6


Surveyor?s Record Section 7

Corner: W1/4
Date: Aug. 2, 1989
Located: PK Nail above a rebar above a field stone
Depth:
Placed: MNDOT Cast Iron Monument just below the pavement surface
Location: On centerline of north-south road and 3' north of field approach
Tie 1: Spike & bottle cap in E side of PP SE 117.07'
Tie 2: Chisled X in S end of RCP SW 38.72'
Tie 3: Chisled X in N end of RCP NW 37.07'
Tie 4:
Remarks: MNDOT LS
Corner Certification


Corner: W1/4
Date: APRIL 17, 1979
Located: CONC. MON.
Depth:
Placed: STEEL PIN
Location: ABOVE MON.
Tie 1: CHISELED "X" ON COLLAR CULV. END NW. 37.03'
Tie 2: CHISELED "X" ON COLLAR CULV. END SW. 38.75'
Tie 3: N&C EVERGREEN NE. 93.16'
Tie 4:
Remarks: PLACED STEEL PIN ON SEPT. 28, 1989


Corner: W1/4
Date:
Located: STONE
Depth:
Placed:
Location:
Tie 1: TACK IN TEL POLE SW. 46.3'
Tie 2: TACK IN BLAZED COTTONWOOD TREE 36.5'
Tie 3:
Tie 4:
Remarks:


1861 Field Notes


Surveyor?s Record Section 12


Surveyor?s Record Section 11

Corner: CENTER
No information.


Surveyor?s Record Section 12

Corner: E1/4
Date: Sept. 22, 1980
Located: Stone above grade over old bolt
Depth:
Placed: 1/2" X 10" iron rebar with "LS 12967" cap
Location: Over old bolt, removed stone in order to place rebar
5.5' west of centerline of twp road
Tie 1: Brass Disc "LS 12967" & nail in corner fence post E 43.46'
Tie 2: Brass Disc "LS 12967" & nail in corner fence post SW 44.53'
Tie 3: Brass Disc "LS 12967" & nail in fence post W 35.27'
Tie 4:
Remarks: Martin Land Surveying
Corner Certification


Surveyor?s Record Section 12


Surveyor?s Record Section 7

Corner: SW
Date:
Located:
Depth:
Placed: STONE AND IRON PIN IN LAKE
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Surveyor?s Record Section 12


Surveyor?s Record Section 11


Surveyor?s Record Section 14


Surveyor?s Record Section 13

Corner: S1/4
Date: APRIL 17, 1979
Located: FIELD STONE
Depth: 21" BELOW GRADE
Placed: STEEL PIN
Location: ABOVE STONE
Tie 1: N&C PP N/NE 52.47'
Tie 2: N&C FE. POST S. 51.10'
Tie 3: N&C PP NW. 141.25'
Tie 4: TOP 3RD STEEL POST N. 97.08'
Remarks: PLACED STEEL PIN IN BIT. MAT SEPT. 28, 1989


Corner: S1/4
Date:
Located: STONE
Depth:
Placed:
Location:
Tie 1: TACK IN BLAZED POST NW. 47.0'
Tie 2: TACK IN BLAZED COTTONWOOD TREE SOUTH ON LINE 40.0'
Tie 3:
Tie 4:
Remarks:


Corner: S1/4
Date: Aug. 13, 1989
Located: Stone monument
Depth:
Placed: Square MNDOT Cast Iron Monument
Location: On centerline of east-west road and on fence line north
Tie 1: Nail & bottle cap in S side of PP NW 141.15'
Tie 2: 3rd steel fence post N 97.08'
Tie 3:
Tie 4:
Remarks: MNDOT LS
Corner Certification


1861 Field Notes


Surveyor?s Record Section 12


Surveyor?s Record Section 13

Corner: SE
Date: APRIL 18, 1989
Located: P.K. NAIL, WAS PLACED IN OCT. 10,1979
Depth:
Placed: STEEL PIN
Location: ABOVE IRON PIN IN BIT. MAT
Tie 1: TOP EDGE C.M.P. NW. 43.0'
Tie 2: N&C TEL. PED. SW. 55.15'
Tie 3: NW. COR. POWER BOX 73.25' SE.
Tie 4: N&C PP NE. 65.21'
Remarks:


Corner: SE
Date: 1966
Located: IRON STAKE
Depth:
Placed: IRON PIN
Location:
Tie 1: TACK IN COR. FE. POST NE. 47.0'
Tie 2: TACK IN COR. FE. POST SOUTH ON LINE 33.3'
Tie 3: TOP EDGE OF C.M.P. NW. 43.0'
Tie 4:
Remarks:


Surveyor?s Record Section 12


Surveyor?s Record Section 13


Surveyor?s Record Section 7


Surveyor?s Record Section 18

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2024, Murray County Minnesota