Corner: NW Date: Jan 4, 2019 Located: Iron Monument with Seal no. 12967 Depth: Placed: Location: On Centerline of the TWP Rd heading E-W & In line with the fences heading north and south. Tie 1: N- 221608.966 Tie 2: E- 495390.844 Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor?s Record Section 9
Surveyor?s Record Section 5
Surveyor?s Record Section 8
Surveyor?s Record Section 4 |
Corner: N1/4 Date: SEPT. 30, 1974 Located: CONC. MON. Depth: Placed: STEEL PIN Location: ABOVE MON. Tie 1: N&C PP SW. 59.32' Tie 2: N&C COR. POST SE. 71.4' Tie 3: N&C TEL. PED. NE. 60.3' Tie 4: Remarks:
Corner: N1/4 Date: FEB. 6, 1934 Located: CONC. STONE Depth: Placed: Location: Tie 1: TACK IN TEL POLE NE. 45.2' Tie 2: TACK IN BLAZED COTTONWOOD SE. 53.7' Tie 3: Tie 4: Remarks:
Corner: N1/4 Date: MAY 17, 2021 Located: 1/2" IRON Depth: Placed: Location: SEE CORNER CERT. Tie 1: N: 221591.026 Tie 2: E: 498034.858 Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
1861 Field Notes
Surveyor?s Record Section 9
Surveyor?s Record Section 4 |
Corner: NE Date: JUNE 10, 1983 Located: IRON PIN 8" LONG Depth: Placed: Location: 4" BELOW SURFACE Tie 1: N&C FE. POST SE. 59.19' Tie 2: N&C COR. POST SOUTH 34.44' Tie 3: N&C COR. POST NE. 43.62' Tie 4: DISTANCE FROM EAST COR.(2651.55') Remarks: NO STONE LOCATED JUNE 10, 1983, DUG 1' BELOW PIN THEN USED TILE PROBE. USED PIN.
Corner: NE Date: Sept. 6, 2017 Located: Cast Iron monument Depth: 3' below surface Placed: 5/8" Iron with Seal #43844 over cast iron monument Location: Tie 1: Nail & bottle cap in tel ped guard post NE 68.18' Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: NE Date: April 25, 1989 Located: Two Irons, two field stones, and remnants of a wooden stake Depth: Placed: MNDOT Cast Iron Monument Location: Tie 1: Chisled X on E end of 24" RCP SE 41.74' Tie 2: Chisled X on W end of 24" RCP SE 23.26' Tie 3: Nail & bottle cap in corner fence post S 33.97' Tie 4: Nail & bottle cap in N side of fence post SE 60.18' Remarks: MNDOT LS Corner Certification
Surveyor?s Record Section 9
Surveyor?s Record Section 4
Surveyor?s Record Section 3
Surveyor?s Record Section 10 |
Corner: W1/4 Date: May 30, 2002 Located: Nothing Depth: Placed: T-bar Location: On centerline of CSAH 30 tangent curve points extended west Tie 1: N&D in PP E 61.8' Tie 2: 1/2" rebar W 30' Tie 3: 1/2" rebar S 30' Tie 4: Remarks: B&G Land Surveys Inc. Corner Certification
Corner: W1/4 Date: SEPT. 30, 1974 Located: CONC. MON. Depth: 16" BELOW GRADE Placed: 18" LONG STEEL PIN Location: ABOVE MON. Tie 1: N&C FE. POST EAST 2.75' Tie 2: N&C PP EAST 11.23' Tie 3: Tie 4: Remarks: FARM ENTRANCE
1861 Field Notes
1861 Field Notes Meandering Corners
Surveyor?s Record Section 9
Surveyor?s Record Section 8 |
Corner: CENTER Date: SEPT. 30, 1974 Located: FIELD STONE Depth: 6" BELOW GRADE Placed: Location: Tie 1: N&C BRACE POST EAST 19.51' Tie 2: OLD 8" COR. POST SE. 2.3' Tie 3: SE. COR. CONC. FLOOR OFCORN CRIB NW. 82.1' Tie 4: Remarks:
Corner: CENTER Date: Sept. 6, 2017 Located: Stone Depth: Placed: Left monument as found set 5/8" iron with seal #43844 on north side of stone. Location: Tie 1: T-bar with seal #12237 SW 13.58' Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: CENTER Date: May 30, 2002 Located: Stone Depth: Placed: Iron T-bar at true center of section 9 Location: 4.52' west and 12.80' south of the stone Tie 1: Tie 2: Tie 3: Tie 4: Remarks: B&G Land Surveys Inc. Corner Certification
Surveyor?s Record Section 9 |
Corner: E1/4 Date: Sept. 29, 1989 Located: Axleshaft Depth: 2.5' below surface Placed: MNDOT Cast Iron Monument Location: At intersection of fence lines north-south and west Tie 1: Tie 2: Tie 3: Tie 4: Remarks: MNDOT LS Corner Certification
1861 Field Notes
Surveyor?s Record Section 9
Surveyor?s Record Section 10 |
Corner: SW Date: Dec. 16, 2003 Located: "T" Bar Depth: 0.3' Down Placed: Location: Tie 1: Sign Post N/NW 81.4' Tie 2: Yield Sign Post NW 75.7' Tie 3: Northerly Post Low Maintenance Road Sign SW 57.7' Tie 4: Remarks: MN DNR LS Corner Certification
Corner: SW Date: June 12, 2006 Located: Iron T-Bar Depth: Near road surface Placed: Location: Tie 1: Yield Ssign Post WNW 75.7' Tie 2: North Post of Low Maintenance Sign WSW 57.7' Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: SW Date: 1958 Located: CONC. MON. Depth: Placed: Location: Tie 1: N&C FE. POST SW. 49.9' Tie 2: N&C FE. POST W. 37.9' Tie 3: Tie 4: Remarks:
Corner: SW Date: July 18, 2002 Located: Stone Depth: 4' below gravel road surface near level of old lake reeds Placed: Iron T-bar over stone near road surface Location: Centerline of twp road Tie 1: Street Sign Post W/NW 81.4' Tie 2: Yield Sign Post W/NW 75.7' Tie 3: North Post of Low Maintenance Sign W/SW 57.7' Tie 4: Remarks: B&G Land Surveys Inc. Corner Certification
Corner: SW Date: MAY 1, 1931 Located: Depth: Placed: STONE 12"x12"x20" Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: ESTABLISHED ON LINE WITH THE 1/4 COR. AND SEC. COR. TO THE NORTH, AND SOUTH 2640' FROM THE 1/4 COR.
Surveyor?s Record Section 9
Surveyor?s Record Section 8
Surveyor?s Record Section 17
Surveyor?s Record Section 16 |
Corner: S1/4 Date: July 18, 2002 Located: Wood Post lying N-S at the approx. middle of section Depth: Placed: Iron T-Bar Location: At midpoint of section 9 on line between the SW corner and the SE corner of section 9 Tie 1: Tie 2: Tie 3: Tie 4: Remarks: B&G Land Surveys Inc. Corner Certification
Corner: S1/4 Date: MAY 1, 1931 Located: CONC. STONE Depth: Placed: Location: Tie 1: TACK IN TEL. POLE NE. 45.2' Tie 2: TACK IN BLAZED COTTONWOOD SE. 53.7' Tie 3: Tie 4: Remarks:
Corner: S1/4 Date: June 12, 2006 Located: Iron T-Bar Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
1861 Field Notes
1861 Field Notes Meandering Corners
Surveyor?s Record Section 9
Surveyor?s Record Section 16 |
Corner: SE Date: Sept. 28, 1989 Located: Nothing Depth: Placed: MNDOT Cast Iron Monument Location: 6' South of centerline of twp road and on fence line north Tie 1: PK Nail in S side of PP NW 75.95' Tie 2: PK Nail in W side of fence post N 41.90'
Tie 3: Tie 4: Remarks: MNDOT LS Corner Certification
Surveyor?s Record Section 9
Surveyor?s Record Section 16
Surveyor?s Record Section 10
Surveyor?s Record Section 15 |