Township:

Section:

Corner: NW
Date: OCT. 19, 1904
Located:
Depth:
Placed: STONE 10"x10"x14"
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: NW
Date: Aug. 19, 2013
Located:
Depth: At Surface
Placed: PK Nail
Location: Centerline of Road
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: After Overlay


Corner: NW
Date: SEPT. 9, 1986
Located: FIELD STONE
Depth: 1' BELOW GRAVEL
Placed: 9" LONG BAR
Location: ABOVE STONE
Tie 1: N&C PP NE. 54.32', AND N&C PP SE. 38.13'
Tie 2: CHISELED "X" C.S.P. NW. 40.94'
Tie 3: CHISELED "X" C.S.P. SW. 40.31'
Tie 4: 2"x2" HUB W. 60.75'
Remarks:


Surveyor's Record Section 8


Surveyor's Record Section 6


Surveyor's Record Section 7


Surveyor's Record Section 5

Corner: N1/4
Date: April 29, 1995
Located: 12"x16"x30" stone pointed end up with 4 stones around it
Depth:
Placed: Steel fence post to the west & two 5/8" iron stakes seal #11943 on the east & west side of the stone
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Moseng Land Surveying
Corner Certification


1861 Field Notes


Surveyor's Record Section 8


Surveyor's Record Section 5

Corner: NE
Date: Oct. 12, 2016
Located: Nothing
Depth:
Placed: 5/8" Iron with seal # 43844.
Location:
Tie 1: N: 189880.940
Tie 2: E: 495535.037
Tie 3: Nail and seal # 11943 in wood post WNW- 26.2' Nail and seal # 11943 in wood post E- 39.85'
Tie 4: Nail and seal # 11943 in utility pole SE- 55.43'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 8


Surveyor's Record Section 5


Surveyor's Record Section 4


Surveyor's Record Section 9

Corner: W1/4
Date: May 15, 2010
Located: PK Nail
Depth:
Placed:
Location:
Tie 1: Nail & Cap in PP SE 77.00'
Tie 2: Chiseled X on E end of culvert NE 57.05'
Tie 3: Top turn buckle on W end culvert SW 56.90'
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: W1/4
Date: JUNE 11, 1996
Located: FIELD STONE 10"x10"x7"
Depth: 14" DOWN
Placed: STEEL PIN
Location: ABOVE STONE AT SURFACE
Tie 1: N&C PP SE. 77.00'
Tie 2: CHISELED "X" CL CULV. END NE. 57.05'
Tie 3: TOP TURN BUCKLE CULV. END SW. 56.90'
Tie 4:
Remarks: PLACED P.K. NAIL JUNE 20, 1997


Corner: W1/4
Date: FEB. 7, 1934
Located: STONE
Depth:
Placed:
Location:
Tie 1: TACK IN TP NW. 93.0'
Tie 2: TACK IN TP NE. 113.6'
Tie 3:
Tie 4:
Remarks:


1861 Field Notes


Surveyor's Record Section 8


Surveyor's Record Section 7

Corner: CENTER
Date:
Located: Stone
Depth:
Placed:
Location:
Tie 1: N & C Cottonwood Tree N 94.01'
Tie 2: N&C 2nd FE. Post N. 55.4'
Tie 3:
Tie 4:
Remarks:


Surveyor's Record Section 8

Corner: E1/4
Date: May 26, 2010
Located: Wood hub over 18" stone
Depth:
Placed: 1" PIPE W/ CAP NO. 43844
Location:
Tie 1: Nail & Survey Marker in PP NE 83.40'
Tie 2: Nail & Survey Marker in ped NW 57.38'
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: E1/4
Date:
Located: STONE
Depth:
Placed:
Location:
Tie 1: N&C COR. POST NE. 41.0'
Tie 2: N&C COR. POST SE. 38.9'
Tie 3:
Tie 4:
Remarks:


1861 Field Notes


Surveyor's Record Section 8


Surveyor's Record Section 9

Corner: SW
Date: 1968
Located: CONC. MON.
Depth:
Placed: STEEL PIN
Location: 2" BELOW SURFACE
Tie 1: N&C PP EAST 48.73'
Tie 2: STEEL PIN INSLOPE SW. 41.13'
Tie 3: STEEL PIN INSLOPE NW. 36.76'
Tie 4:
Remarks: DUG & FOUND LAND SURVEYOR PIN JUNE 11, 1996;
PLACED P.K. NAIL JUNE 26, 1997


Surveyor's Record Section 8


Surveyor's Record Section 7


Surveyor's Record Section 18


Surveyor's Record Section 17

Corner: S1/4
No information.


1861 Field Notes


Surveyor's Record Section 8


Surveyor's Record Section 17

Corner: SE
Date: April 22, 2008
Located: Nothing
Depth:
Placed: Survey Spike with seal #43844
Location:
Tie 1: Nail & seal in top lone fence post W 50.09'
Tie 2: Nail & seal in top fence post E 50.08'
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: SE
Date:
Located: HUB
Depth:
Placed:
Location:
Tie 1: 5TH FENCE POST ON LINE EAST 78.1'
Tie 2: EDGE OF FIRST STEEL POST NE. 71.6'
Tie 3:
Tie 4:
Remarks:


Corner: SE
Date: Aug. 19, 2013
Located:
Depth: At Surface
Placed: 1/2" x 3" Rebar
Location: Centerline of Road
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: After Regrade


Surveyor's Record Section 8


Surveyor's Record Section 17


Surveyor's Record Section 9


Surveyor's Record Section 16

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2024, Murray County Minnesota