Corner: NW Date: OCT. 19, 1904 Located: Depth: Placed: STONE 10"x10"x14" Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NW Date: July 21, 2021 Located: 1/2" IRON PIPE WITH CAP #16093 Depth: Placed: Location: ON CENTERLINE OF 120TH AVE. Tie 1: Tie 2: Tie 3: Tie 4: Remarks: O'Malley and Kron land surveyors, Inc. Corner Certification
Surveyor's Record Section 7
Surveyor's Record Section 1
Surveyor's Record Section 12
Surveyor's Record Section 6 |
Corner: N1/4 Date: OCT. 19, 1904 Located: Depth: Placed: FENCE POST 8"x8" Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
1861 Field Notes
Surveyor's Record Section 7
Surveyor's Record Section 6 |
Corner: NE Date: SEPT. 9, 1986 Located: FIELD STONE Depth: 1' BELOW GRAVEL Placed: 9" LONG BAR Location: ABOVE STONE Tie 1: N&C PP NE. 54.32', AND N&C PP SE. 38.13' Tie 2: CHISELED "X" C.S.P. NW. 40.94' Tie 3: CHISELED "X" C.S.P. SW. 40.31' Tie 4: 2"x2" HUB W. 60.75' Remarks:
Corner: NE Date: OCT. 19, 1904 Located: Depth: Placed: STONE 10"x10"x14" Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NE Date: Aug. 19, 2013 Located: Depth: At Surface Placed: PK Nail Location: Centerline of Road Tie 1: Tie 2: Tie 3: Tie 4: Remarks: After Overlay
Surveyor's Record Section 7
Surveyor's Record Section 6
Surveyor's Record Section 5
Surveyor's Record Section 8 |
Corner: W1/4 Date: MAY 1, 1989 Located: ASSUMED 2"x2" HUB Depth: 1.5' BELOW GRAVEL SURFACE Placed: STEEL PIN 3/4"x12" Location: 2" BELOW GRAVEL, ABOVE HUB Tie 1: STEEL PIN INSLOPE NW. 41.63' Tie 2: STEEL PIN INSLOPE NE. 43.88' Tie 3: N&C PP SE. 59.38' Tie 4: Remarks: PLACED P.K. NAIL JUNE 20, 1997
Corner: W1/4 Date: Aug. 19, 2013 Located: Depth: At Surface Placed: PK Nail Location: Centerline of Road Tie 1: Tie 2: Tie 3: Tie 4: Remarks: After Overlay
Surveyor's Record Section 7
Surveyor's Record Section 12 |
Corner: CENTER No information.
Surveyor's Record Section 7 |
Corner: E1/4 Date: FEB. 7, 1934 Located: STONE Depth: Placed: Location: Tie 1: TACK IN TP NW. 93.0' Tie 2: TACK IN TP NE. 113.6' Tie 3: Tie 4: Remarks:
Corner: E1/4 Date: May 15, 2010 Located: PK Nail Depth: Placed: Location: Tie 1: Nail & Cap in PP SE 77.00' Tie 2: Chiseled X on E end of culvert NE 57.05' Tie 3: Top turn buckle on W end culvert SW 56.90' Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: E1/4 Date: JUNE 11, 1996 Located: FIELD STONE 10"x10"x7" Depth: 14" DOWN Placed: STEEL PIN Location: ABOVE STONE AT SURFACE Tie 1: N&C PP SE. 77.00' Tie 2: CHISELED "X" CL CULV. END NE. 57.05' Tie 3: TOP TURN BUCKLE CULV. END SW. 56.90' Tie 4: Remarks: PLACED P.K. NAIL JUNE 20, 1997
1861 Field Notes
Surveyor's Record Section 7
Surveyor's Record Section 8 |
Corner: SW Date: July 21, 2021 Located: NONE Depth: Placed: 1/2" IRON PIPE WITH CAP # 42300 Location: Tie 1: HOLE PLACED IN CULVERT NW 29.98' Tie 2: HOLE PLACED IN CULVERT SE 33.58' Tie 3: Tie 4: Remarks: O'Malley and Kron land surveyors, Inc. Corner Certification
Surveyor's Record Section 7
Surveyor's Record Section 12
Surveyor's Record Section 13
Surveyor's Record Section 18 |
Corner: S1/4 No information.
1861 Field Notes
Surveyor's Record Section 7
Surveyor's Record Section 18 |
Corner: SE Date: 1968 Located: CONC. MON. Depth: Placed: STEEL PIN Location: 2" BELOW SURFACE Tie 1: N&C PP EAST 48.73' Tie 2: STEEL PIN INSLOPE SW. 41.13' Tie 3: STEEL PIN INSLOPE NW. 36.76' Tie 4: Remarks: DUG & FOUND LAND SURVEYOR PIN JUNE 11, 1996; PLACED P.K. NAIL JUNE 26, 1997
Surveyor's Record Section 7
Surveyor's Record Section 18
Surveyor's Record Section 8
Surveyor's Record Section 17 |