Township:

Section:

Corner: NW
Date: 1940
Located: CONCRETE STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. FENCE POST NW. 50.2'
Tie 2: EDGE OF STEEL COR. POST NE. 49.8'
Tie 3:
Tie 4:
Remarks:


Corner: NW
Date: Jan. 29, 2025
Located: CONCRETE MONUMENT
Depth:
Placed: 5/8" iron with seal #43844 OVER TOP OF THE CONCRETE MONUMENT.
Location:
Tie 1: N: 147681.218
Tie 2: E: 564229.297
Tie 3: NAIL & SEAL IN POWER POLE NE 61.28'
Tie 4: TOP CENTER OF TELE. PED. SW 48.31', NW CORNER OF DES MOINES RIVER TOWN HALL. SE 94.83'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: NW
Date: Nov. 16, 2007
Located: 6" Concrete Monument with X on it
Depth: 1' below surface
Placed: 1" iron pipe with survey cap #23008
Location: At centerline of intersection
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying
Corner Certification


Surveyor's Record Section 22


Surveyor's Record Section 16


Surveyor's Record Section 21


Surveyor's Record Section 15

Corner: N1/4
Date: Nov. 16, 2007
Located: 8"x6" Stone
Depth: 1.5' below surface
Placed: 1" iron pipe with survey cap #23008
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying
Corner Certification


Corner: N1/4
Date: MAY 17, 2012
Located: Iron Pipe with Cap No. 23008
Depth: DOWN 3"
Placed:
Location: 2' NORTH OF CENTERLINE OF ROAD.
Tie 1: N = 147702.160
Tie 2: E = 566879.683
Tie 3: ELEV. = 1493.009
Tie 4:
Remarks: NO TIES


1861 Field Notes


Surveyor's Record Section 22


Surveyor's Record Section 15

Corner: NE
Date: 1934
Located: Conc. Monument
Depth:
Placed: Steel Pin ASSUMED
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: MAY 17, 2012
Located: 3/4" STEEL PIN
Depth: DOWN 10"
Placed:
Location: CENTERLINE OF ROAD
Tie 1: N = 147721.076
Tie 2: E = 569499.883
Tie 3: ELEV. = 1478.756
Tie 4:
Remarks: NO TIES


Corner: NE
Date: Jan. 29, 2025
Located: concrete monument
Depth:
Placed: 5/8" iron with seal #43844 over top of the concrete monument
Location:
Tie 1: N: 147721.367
Tie 2: E: 569499.415
Tie 3: NAIL & SEAL IN POWER POLE NW 73.84, NE 69.60'
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 22


Surveyor's Record Section 15


Surveyor's Record Section 14


Surveyor's Record Section 23

Corner: W1/4
Date: Aug. 12, 2024
Located: Large pointed field stone with a 2" iron pipe along the south side of the stone 12" down.
Depth:
Placed:
Location:
Tie 1: N: 145036.859
Tie 2: E: 564254.065
Tie 3: NAIL & SEAL END FENCE POST E 34.99'
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


1861 Field Notes


Surveyor's Record Section 22


Surveyor's Record Section 21

Corner: CENTER
No information.


Surveyor's Record Section 22

Corner: E1/4
Date: 1967
Located: CONC. MON.
Depth: 5" BELOW GRAVEL
Placed: STEEL PIN
Location: 3" BELOW GRADE
Tie 1: N&C COR. FE. POST W. 54.4'
Tie 2: TIE BOLT APRON SE. 48.8'
Tie 3:
Tie 4:
Remarks:


Corner: E1/4
Date: Jan. 29, 2025
Located: concrete monument. Set a 5/ 8" iron along north side.
Depth:
Placed: 5/ 8" iron with seal #43844 over top of the concrete monument.
Location:
Tie 1: N: 145055.918
Tie 2: E: 569528.905
Tie 3: NAIL & SEAL IN FENCE POST SW 68.45'
Tie 4: NAIL & SEAL IN CORNER FENCE POST W 53.49'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: E1/4
Date: MAY 16, 2012
Located: 3/4 " STEEL PIN
Depth: DOWN 4"
Placed:
Location: 1' EAST OF CENTERLINE
Tie 1: N = 145056.041
Tie 2: E = 569529.145
Tie 3: ELEV. = 1443.881
Tie 4:
Remarks: NO TIES


1861 Field Notes


Surveyor's Record Section 22


Surveyor's Record Section 23

Corner: SW
Date: Jan. 29, 2025
Located: LARGE 2" PIPE
Depth:
Placed: 5/8" iron with seal #43844 OVER 2" PIPE.
Location:
Tie 1: N: 142398.119
Tie 2: E: 564255.279
Tie 3: NAIL & SEAL IN "NO TRESPASING" SIGN POST SW 30.97'
Tie 4: NAIL & SEAL IN FENCE POST NE 60.55', NE 85.88'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 22


Surveyor's Record Section 21


Surveyor's Record Section 28


Surveyor's Record Section 27

Corner: S1/4
Date: Jan. 29, 2025
Located: railroad spike in line with fence to the north
Depth:
Placed: 5/8" iron with seal #43844 AT THE LOCATION OF THE RAILROAD SPIKE
Location:
Tie 1: N: 142392.912
Tie 2: E: 566892.529
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


1861 Field Notes


Surveyor's Record Section 22


Surveyor's Record Section 27

Corner: SE
Date: SEPT. 21, 2005
Located: 5/8" IRON MON.
Depth: 8" DOWN
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: SE
Date: Jan. 29, 2025
Located: 5/8" IRON IN THE CENTER OF THE INTERSECTION
Depth:
Placed: 5/8" iron with seal #43844 AFTER EXCAVATING TO LOOK FOR STONE.
Location:
Tie 1: N: 142393.485
Tie 2: E: 569552.045
Tie 3: NAIL & SEAL IN POWER POLE NW 58.18'
Tie 4: TOP CENTER TELE. PED. SE 157.20'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: SE
Date: 1967
Located: CONC. MON.
Depth: 8" BELOW GRADE
Placed: STEEL PIN
Location: 1" BELOW GRADE
Tie 1: N&C PP NW. 57.50'
Tie 2: N&C TP SE. 45.0'
Tie 3: TOP OF TIE BOLT APRON NE. 42.60'
Tie 4:
Remarks:


Corner: SE
Date: MAY 16, 2012
Located: 3/4" STEEL PIPE
Depth: DOWN 8"
Placed:
Location: CENTERLINE OF ROAD.
Tie 1: N = 142393.485
Tie 2: E = 569552.198
Tie 3: ELEV. = 1462.051
Tie 4:
Remarks: NO TIES


Surveyor's Record Section 22


Surveyor's Record Section 27


Surveyor's Record Section 23


Surveyor's Record Section 26


Show County         Rich Version