Township:

Section:

Corner: NW
Date: Jan. 16, 2025
Located: 10"x 14" field stone with a wooden stake along side it.
Depth:
Placed: 5/8" iron with seal #43844 over top of the stone.
Location:
Tie 1: N: 163474.557
Tie 2: E: 564229.249
Tie 3: TOP CENTER OF TELE. PED NW 51.84'
Tie 4: NAIL & WASHER IN POWER POLE. SW 49.40'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 3


Surveyor's Record Section 33


Surveyor's Record Section 4


Surveyor's Record Section 34

Corner: N1/4
Date: Jan. 16, 2025
Located: LARGE 12" X 18" LIMESTONE MONUMENT.
Depth:
Placed: 5/8" iron with seal #43844
Location:
Tie 1: N: 163483.635
Tie 2: E: 566865.590
Tie 3: NAIL & WASHER IN POWER POLE. SW 51.03'
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 3


Surveyor's Record Section 34

Corner: NE
Date: FEB. 5, 1934
Located:
Depth:
Placed: CONC. STONE WITH "X" ON TOP
Location:
Tie 1: TACK IN COR FE. POST SW. 48.2'
Tie 2: TACK IN FE. POST NW. 41.0'
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: Jan. 16, 2025
Located: CONCRETE MONUMENT WITH "X" ON TOP
Depth:
Placed: 5/8" iron with seal #43844 OVER TOP OF THE CONCRETE MONUMENT.
Location:
Tie 1: N: 163490.835
Tie 2: E: 569510.021
Tie 3: TOP CENTER OF LINCOLN-PIPESTONE WATER VALVE NW 76.76'
Tie 4: NAIL & WASHER IN POWER POLE SE 58.73'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: NE
Date: 1967
Located:
Depth:
Placed: IRON PIN
Location: 3" BELOW GRADE
Tie 1: N&C T.P. NW. 47.1'
Tie 2: SOUTH CULV. END, APRON TIE BOLT SW. 42.3'
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: MAY 21, 2012
Located: 3/4" STEEL PIN
Depth: DOWN 6"
Placed: CENTERLINE OF ROAD
Location:
Tie 1: N = 163490.835
Tie 2: E = 569510.021
Tie 3: ELEV. = 1476.886
Tie 4:
Remarks: TIE NO. 1 IS NO GOOD, TIE NO. 2 IS GOOD.


Surveyor's Record Section 3


Surveyor's Record Section 34


Surveyor's Record Section 35


Surveyor's Record Section 2

Corner: W1/4
Date: Jan. 16, 2025
Located:
Depth:
Placed: 5/8" iron with seal #43844
Location:
Tie 1: N: 161032.807
Tie 2: E: 564151 .828
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


1861 Field Notes Meandering Corners


1861 Field Notes


Surveyor's Record Section 3


Surveyor's Record Section 4

Corner: CENTER
No information.


Surveyor's Record Section 3

Corner: E1/4
Date: MAY 21, 2012
Located: 3/4" STEEL PIN
Depth: DOWN 6"
Placed:
Location: CENTERLINE OF ROAD.
Tie 1: N = 161072.821
Tie 2: E = 569489.920
Tie 3: ELEV. = 1490.100
Tie 4:
Remarks: TIES NO GOOD


Corner: E1/4
Date: 1967
Located: CONC. MON.
Depth: 3" BELOW GRADE
Placed: STEEL PIN
Location: 3" BELOW GRADE
Tie 1: N&C COR. FE. POST W. 49.8'
Tie 2: N&C PP NE. 91.0'
Tie 3:
Tie 4:
Remarks:


Corner: E1/4
Date: Jan. 16,2025
Located: 3/4" IRON PIN
Depth:
Placed: 5/8" iron with seal #43844 AT THE POSITION OF THE 3/4" IRON PIN.
Location:
Tie 1: N: 161072.821
Tie 2: E: 569489.920
Tie 3: NAIL & SEAL IN CORNER FENCE POST W 58.49'
Tie 4: NAIL & SEAL IN POWER POLE E 50.13'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


1861 Field Notes


Surveyor's Record Section 3


Surveyor's Record Section 2

Corner: SW
Date: OCT. 15, 2012
Located: IRON MONUMENT
Depth:
Placed:
Location:
Tie 1: N = 158369.72
Tie 2: E = 564143.88
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: SW
Date: Jan. 16, 2025
Located: 12"x8" stone with a 2" sguare wood stake by the stone.
Depth:
Placed: 5L 8" iron with seal #43844 over top of the stone
Location:
Tie 1: N: 158370.898
Tie 2: E: 5641 41 .082
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 3


Surveyor's Record Section 4


Surveyor's Record Section 9


Surveyor's Record Section 10

Corner: S1/4
Date: Oct. 12, 2012
Located: 10" X 8" STONE
Depth: 1.4' DOWN
Placed: 5/8" Iron Pipe with Cap No. 23008 over top center of stone
Location: At centerline of road and in line with fence south
Tie 1: N = 158385.79
Tie 2: E = 566809.21
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying
Corner Certification


1861 Field Notes


Surveyor's Record Section 3


Surveyor's Record Section 10

Corner: SE
Date: 1967
Located: CONC. MON.
Depth: 6" BELOW GRADE
Placed: STEEL PIN
Location: 3" BELOW GRADE
Tie 1: N&C PP SE. 58.4'
Tie 2: SPIKE IN TP NW. 45.4'
Tie 3:
Tie 4:
Remarks:


Corner: SE
Date: Jan. 16, 2025
Located: 8" ROUND CONCRETE MONUMENT.
Depth:
Placed: 5/8" iron with seal #43844 OVER TOP OF CONCRETE MONUMENT.
Location:
Tie 1: N: 158396.501
Tie 2: E: 569472.820
Tie 3: TOP CENTER OF TELEPHONE PED. NW 45.53'
Tie 4: WATER VALVE SW 85.17', NAIL & WASHER IN POWER POLE SE 56.48'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: SE
Date: MAY 21, 2012
Located: 3/4" STEEL PIN
Depth: DOWN 8"
Placed:
Location: 3' WEST OF CENTERLINE OF ROAD.
Tie 1: N = 158396.555
Tie 2: E = 569472.592
Tie 3: ELEV. = 1513.607
Tie 4:
Remarks: (1967 TIES) TIE NO. 1 IS NO GOOD AND TIE NO. 2 IS GOOD.


Surveyor's Record Section 3


Surveyor's Record Section 10


Surveyor's Record Section 2


Surveyor's Record Section 11


Show County         Rich Version