Corner: NW Date: 1940 Located: CONCRETE STONE Depth: Placed: IRON PIN Location: ABOVE STONE Tie 1: N&C COR. POST NE. 52.40' Tie 2: N&C COR. POST NW. 45.30' Tie 3: Tie 4: Remarks:
Corner: NW Date: APRIL 14, 1978 Located: Depth: Placed: IRON PIN Location: ABOVE STOVE Tie 1: N&C PP NE. 61.43' Tie 2: N&C BLAZED TREE NW. 73.89' Tie 3: STEEL PIN INSLOPE SW. 54.11' Tie 4: Remarks:
Corner: NW Date: 8/26/2024 Located: Depth: Placed: Location: Tie 1: N-205723.179 Tie 2: E-558685.584 Tie 3: Tie 4: Remarks: MAG nail placed after Bituminous overlay project.
At the top of the asphalt surface.
Corner: NW Date: JUNE 8, 1976 Located: CONCRETE STONE Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NW Date: AUG. 27,2020 Located: NO. 4 REBAR WITHOUT CAP Depth: DOWN 0.2' Placed: Location: Tie 1: SEE ATTACHED CERT. Tie 2: Tie 3: Tie 4: Remarks: Westwood Professional Services Corner Certification
Surveyor?s Record Section 28
Surveyor?s Record Section 20
Surveyor?s Record Section 29
Surveyor?s Record Section 21 |
Corner: N1/4 Date: Located: FOUND NOTHING Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: DUG LARGE HOLE AND FOUND NOTHING, NO DATE.
Corner: N1/4 Date: AUG. 28, 2020 Located: NO. 5 REBAR WITH CAP "MOSENG LS 11943" Depth: DOWN 0.2' Placed: Location: Tie 1: MAG NAIL IN EAST TOP END OF 18" CMP CULVERT NE 48.13' Tie 2: MAG NAIL IN EAST TOP END OF 18" CMP CULVERT SE 44.30' Tie 3: MAG NAIL IN SOUTHWEST FACE OF POWER POLE NW 54.52' Tie 4: Remarks: Westwood Professional Services Corner Certification
1861 Field Notes
Surveyor?s Record Section 28
Surveyor?s Record Section 21 |
Corner: NE Date: Located: FOUND NOTHING Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: DUG 5'x5'x5' HOLE WITH BACKHOE FOUND NOTHING, NO DATE.
Corner: NE Date: AUG. 28, 2020 Located: NO. 4 REBAR WITHOUT CAP Depth: DOWN 0.2' Placed: Location: Tie 1: R/W MARKER NW 141.97' Tie 2: MAG NAIL IN NORTHWEST FACE OF POWER POLE NW 59.05' Tie 3: SOUTHWEST CORNER OF POWER BOX NE 80.78' Tie 4: R/W MARKER SE 153.39' Remarks: Westwood Professional Services Corner Certification
Surveyor?s Record Section 28
Surveyor?s Record Section 21
Surveyor?s Record Section 22
Surveyor?s Record Section 27 |
Corner: W1/4 Date: APR. 14, 1978 Located: FIELD STONE Depth: 30" BELOW GRADE Placed: Location: Tie 1: N&C PP W. 47.05' Tie 2: N&C PP SE. 57.37' Tie 3: NAILS E. 135.78', 252.26' AND 366.16' Tie 4: Remarks:
Corner: W1/4 Date: May 15, 2017 Located: #4 Rebar Depth: 1.3' Below the top of the asphalt surface. Placed: Location: On Centerline of CSAH 42 & 6' South of the centerline of the East Driveway & 6' South of tree line to the west. Tie 1: N: 203072.733 Tie 2: E: 558705.666 Tie 3: Elev.: 1450.190 Tie 4: Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap
Corner: W1/4 Date: March 23, 2018 Located: 3/8" Iron Stake Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: W1/4 Date: MAR 21 2000 Located: Depth: 0.2' BELOW GRADE Placed: 3/8" REBAR (ASSUMED) Location: Tie 1: N&C PP SW. 57.47' Tie 2: NAILS W. 155.00', 250.00' AND 346.00' Tie 3: Tie 4: Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.
Corner: W1/4 Date: July 18, 2017 Located: Depth: At the top of the asphalt surface. Placed: #4 Rebar Location: 4' South of the Centerline of driveway on the east side & .17' East of CSAH 42 Centerline. Tie 1: N: 203072.751 Tie 2: E: 558705.637 Tie 3: Elev.: 1451.559 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.
Corner: W1/4 Date: Aug. 27, 2020 Located: NO. 4 REBAR WITHOUT CAP Depth: FLUSH WITH ASPHALT Placed: Location: Tie 1: MAG NAIL IN EAST FACE OF POWER POLE SW 232.30' Tie 2: MAG NAIL IN SOUTH FACE OF POWER POLE SE 58.05' Tie 3: MAG NAIL IN NORTH FACE OF POWER POLE NW 47.59' Tie 4: NAIL & WHISKER SE 135.78' Remarks: Westwood Professional Services Corner Certification
1861 Field Notes
Surveyor?s Record Section 28
Surveyor?s Record Section 29 |
Corner: CENTER No information.
Surveyor?s Record Section 28 |
Corner: E1/4 Date: DEC. 16, 2020 Located: 10" X 10" STONE FIRMLY PLANTED WITH BOLT AND WOOD REMNANTS, DOWN 2.5' Depth: Placed: NO.4 REBAR WITH CAP LS 45874 ABOVE STONE, DOWN 0.4' BELOW GRADE Location: Tie 1: MAG NAIL IN EAST FACE OF POWER POLE NW 190.10' Tie 2: MAG NAIL IN NORTH FACE OF FENCE POST NW 32.63' Tie 3: MAG NAIL IN SOUTHEAST FACE OF POWER POLE SW 65.04' Tie 4: Remarks: Westwood Professional Services Corner Certification
1861 Field Notes
Surveyor?s Record Section 28
Surveyor?s Record Section 27 |
Corner: SW Date: MAR 21 2000 Located: Depth: 0.2' BELOW GRADE Placed: 3/8" REBAR (ASSUMED) Location: Tie 1: N&C PP SW. 57.47' Tie 2: NAILS W. 155.00', 250.00' AND 346.00' Tie 3: Tie 4: Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.
Corner: SW Date: APRIL 14, 1978 Located: FOUND NOTHING Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: DUG WITH BACKHOE 6'x6'x6' HOLE.
Corner: SW Date: July 18, 2017 Located: Depth: At the top of asphalt surface. Placed: #4 Rebar Location: .25' west of Centerline of CSAH 42 & 1' North of the road heading easterly & 2' South of the road heading westerly. Tie 1: N: 200432.943 Tie 2: E: 558723.878 Tie 3: Elev.: 1447.413 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.
Corner: SW Date: JUNE 25, 1924 Located: Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: FOUND CORNER IN 1924.
Corner: SW Date: May 12, 2017 Located: #4 Rebar Depth: 1.35' Below the top of the asphalt surface. Placed: Location: On Centerline of CSAH 42 & On Centerline of the East Rd & 2' South of the Road heading westerly. Tie 1: N: 200432.937 Tie 2: E: 558723.855 Tie 3: Elev.:1445.863 Tie 4: Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap
Corner: SW Date: AUG. 27,2020 Located: NO. 4 REBAR WITHOUT CAP Depth: FLUSH WITH ASPHALT Placed: Location: Tie 1: MAG IN SOUTHEAST FACE OF POWER POLE SW 58.75' Tie 2: R/W SIGN SE 153.48' Tie 3: R/W SIGN NE 153.87' Tie 4: Remarks: Westwood Professional Services Corner Certification
Surveyor?s Record Section 28
Surveyor?s Record Section 29
Surveyor?s Record Section 32
Surveyor?s Record Section 33 |
Corner: S1/4 No information.
1861 Field Notes
Surveyor?s Record Section 28
Surveyor?s Record Section 33 |
Corner: SE Date: Oct. 9, 1980 Located: Wooden lath and rotted hub Depth: Placed: 1/2" iron rebar with "LS 12967" cap or said lath and hub Location: At Twp road centerline intersection Tie 1: Brass Disc "LS 12967" & nail in PP NW 46.56' Tie 2: Top Dead Center of telephone ped SE 78.64' Tie 3: Tie 4: Remarks: Martin Land Surveying Corner Certification
Corner: SE Date: AUG. 27,2020 Located: NO. 4 REBAR WITH YELLOW CAP "LS 12967" Depth: DOWN 1.3' Placed: Location: Tie 1: MAG IN SOUTHWEST FACE OF POWER POLE NW 46.50' Tie 2: NO. 3 REBAR WITH REF. CAP SW 44.45' Tie 3: TOP CENTER OF TELEPHONE PEDESTAL SE 77.70' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: SE Date: Aug 8, 2016 Located: Iron Pin with a Yellow survey cap denoting Martin. Depth: 1.1' Below the gravel surface. Placed: Location: On Centerline of the N-S Township Road & On Centerline of the E-W Township Road. Tie 1: Northing- 200460.631 Tie 2: Easting- 563999.222, Elev.- 1436.388 Tie 3: Tie 4: Remarks: Placed pink ribbon above the survey cap, also placed at 3" & 6" above the survey cap. Murray County Coordinates & Geoid 99 used
Surveyor?s Record Section 28
Surveyor?s Record Section 33
Surveyor?s Record Section 27
Surveyor?s Record Section 34 |