Corner: NW Date: APRIL 1977 Located: CONC. MON. Depth: 8" BELOW GRADE Placed: Location: MON. IS 45' S. OF INTERSECTION Tie 1: N&C PP NW. 31.45' Tie 2: N&C TEL. PED. NE 41.50' Tie 3: Tie 4: Remarks:
Corner: NW Date: March 13, 2006 Located: Rebar with an unreadable cap Depth: Placed: Location: Tie 1: Nails Xed in PP NW 84.7' Tie 2: Nails Xed in cutoff PP NE 26.1' Tie 3: Nails Xed in PP SW 31.1' Tie 4: Remarks: Ulteig Engineering, Inc. Corner Certification
Corner: NW Date: Located: CONC. MON. Depth: 6" BELOW GRADE Placed: Location: Tie 1: N&C PP NW. 31.3' Tie 2: N&C BRACE POST SE. 48.4' Tie 3: Tie 4: Remarks:
Surveyor's Record Section 21
Surveyor's Record Section 17
Surveyor's Record Section 20
Surveyor's Record Section 16 |
Corner: N1/4 Date: Aug. 10, 2006 Located: Depth: Placed: 1/2" pipe with cap #42604 Location: On centerline of east-west road and in line with fence to the north Tie 1: Spike in PP N 29.31' Tie 2: Witness corner SE 50.81' Tie 3: Witness corner SW 48.69' Tie 4: Remarks: Westwood Professional Services Corner Certification
1861 Field Notes
Surveyor's Record Section 21
Surveyor's Record Section 16 |
Corner: NE Date: Aug. 20, 1992 Located: 12"x12"x18" stone over a 12"x7" stone Depth: Down 0.1' Placed: 3/4"x11" rebar with aluminum cap stamped "MN DNR Survey Marker" down 0.5' Location: 2' south of centerline of east-west road & 2' west of centerline of north-south road Tie 1: Nail & DNR Disc in SW side of PP up 4? NW 43.46' Tie 2: Chiseled X in N end of RCP NE 34.62' Tie 3: Chiseled X in S end of RCP SE 31.90' Tie 4: Nail & DNR Disc in NE side of telephone ped post up 4? SE 46.69' Remarks: MN DNR LS Corner Certification
Corner: NE Date: DEC. 1, 2000 Located: DNR MONUMENT Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: NE Date: October 10, 2012 Located: Aluminum cap stamped "DNR Survey Marker" Depth: 6" Down Placed: Location: 2' West and 2' South of intersection of Centerline Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Surveyor's Record Section 21
Surveyor's Record Section 16
Surveyor's Record Section 15
Surveyor's Record Section 22 |
Corner: W1/4 Date: March 13, 2006 Located: 1" iron pipe Depth: Placed: Location: Tie 1: Nails Xed in PP NW 66.3' Tie 2: Top center of telephone ped SE 81.1' Tie 3: North bolt in witness post W 33.9' Tie 4: Remarks: Ulteig Engineering, Inc. Corner Certification
Corner: W1/4 Date: Located: STONE Depth: Placed: Location: Tie 1: TACK IN COR. FE. POST W. ON LINE 33.0' Tie 2: TACK IN FE. POST SW. 44.3' Tie 3: Tie 4: Remarks:
1861 Field Notes
Surveyor's Record Section 21
Surveyor's Record Section 20 |
Corner: CENTER No information.
Surveyor's Record Section 21 |
Corner: E1/4 Date: SEPT. 25, 1930 Located: Depth: Placed: STONE 8"x12"x24" Location: ESTABLISHED ON LINE Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: E1/4 Date: Aug. 20, 1992 Located: 1/2"x16" rebar with cap #12967 over stone Depth: Placed: Location: 2' east of centerline of north-south road Tie 1: Nail & DNR Disc in SW side of PP up 1' NW 109.93' Tie 2: Nail & DNR DIsc in SE side of PP up 1' SW 171.15' Tie 3: Tie 4: Remarks: MN DNR LS Corner Certification
1861 Field Notes
Surveyor's Record Section 21
Surveyor's Record Section 22 |
Corner: SW Date: JUNE 13, 1969 Located: IRON ROD Depth: Placed: Location: NOTE CENTERLINE OF NEW ROAD 17' N. Tie 1: "X" ON CULV. NUT SW. 69.55' Tie 2: "X" ON CULV. NUT NW. 78.60' Tie 3: N&C PP SE. 49.50' Tie 4: Remarks:
Corner: SW Date: Sept. 11, 2006 Located: PK Nail Depth: Placed: Location: On centerline of north-south road and 16.9' south of centerline of east-west road Tie 1: Yield sign NW 67.1' Tie 2: Street sign NE 61.7' Tie 3: Top NW corner of power box SE 68.8' Tie 4: Remarks: Ulteig Engineering, Inc. Corner Certification
Corner: SW Date: MAY 6, 1993 Located: 3/4" STEEL PIN Depth: 12" BELOW GRADE Placed: Location: COR. 17' S. CENTERLINE COUNTY ROAD Tie 1: STEEL PIN S. 100.00' IN TWP. RD. Tie 2: N&C PP SE. 49.70' Tie 3: N&C COR. POST NW. 48.3' Tie 4: N&C YIELD SIGN NW. 66.22' Remarks: PLACED P.K. NAIL OCT. 12, 1993.
Corner: SW Date: Aug. 21,2019 Located: None Depth: Placed: 5/8" iron with seal #50343 Location: On centerline of north-south road and 16.9' south of centerline of east-west road Tie 1: N: 105448.329 Tie 2: E: 469020.888 Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor's Record Section 21
Surveyor's Record Section 20
Surveyor's Record Section 29
Surveyor's Record Section 28 |
Corner: S1/4 Date: MAY 6, 1993 Located: STEEL PIN Depth: 6" BELOW GRADE Placed: Location: Tie 1: N&C PP S/SW 52.15' Tie 2: N&C TP NW. 32.5' Tie 3: N&C COR. FE. POST S. 51.05' Tie 4: CHISELED "X" CULV. END NE. 47.82' Remarks: PLACED P.K. NAIL OCT. 12, 1993
Corner: S1/4 Date: APRIL 6, 1967 Located: FIELD STONE Depth: Placed: STEEL PIN Location: ABOVE STONE Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
1861 Field Notes
Surveyor's Record Section 21
Surveyor's Record Section 28 |
Corner: SE Date: APRIL 6, 1967 Located: STEEL WHEEL Depth: Placed: STEEL PIN Location: ABOVE CENTER OF WHEEL Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: SE Date: Aug. 18, 1992 Located: 2 1/2" wagon spindle with field stone on south side Depth: Down 2' Placed: 3/4"x24" iron rod with aluminum cap stamped "MN DNR Survey Marker" inside spindle Location: At intersection of roads Tie 1: PK Nail in NW side of PP up 4' SW 58.70' Tie 2: 60d spike & disc in W side of 34" Cottonwood Tree up 1' S/SE 154.88' Tie 3: Tie 4: Remarks: MN DNR LS Corner Certification
Corner: SE Date: MAY 6, 1993 Located: DNR PIPE Depth: 6" BELOW GRADE Placed: Location: ABOVE CENTER OF WHEEL Tie 1: N&C PP SW. 58.38' Tie 2: TOP NE. COR. POWER BOX SW. 64.68' Tie 3: BOTTOM POST YIELD SIGN, HEAD OF BOTTOM BOLT SE. 55.12' Tie 4: BOTTOM POST YIELD SIGN, HEAD OF TOP BOLT NW. 52.58' Remarks: PLACED P.K. NAIL OCT. 12, 1993.
Surveyor's Record Section 21
Surveyor's Record Section 28
Surveyor's Record Section 22
Surveyor's Record Section 27 |