Corner: NW Date: June 6, 1895 Located: Depth: Placed: STAKE MOUND AND PITS Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NW Date: July 12, 2006 Located: PK Nail Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: NW Date: Nov. 9, 2016 Located: PK Nail Depth: Placed: Location: Tie 1: N: 158390.783 Tie 2: E: 558855.239 Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: NW Date: 1985 Located: Steel Pin Depth: Below Existing Bit. Surface Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: This was before a road regrade.
Corner: NW Date: MARCH 30, 2005 Located: IRON MON. INPLACE UNDER BIT. SURFACE Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Surveyor's Record Section 9
Surveyor's Record Section 5
Surveyor's Record Section 8
Surveyor's Record Section 4 |
Corner: N1/4 Date: Jan. 16, 2025 Located: Depth: Placed: 5/8" iron with seal #43844 MIDWAY AND ON LINE. Location: Tie 1: N: 158380.840 Tie 2: E: 561498.160 Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
1861 Field Notes
Surveyor's Record Section 9
Surveyor's Record Section 4 |
Corner: NE Date: OCT. 15, 2012 Located: IRON MONUMENT Depth: Placed: Location: Tie 1: N = 158369.72 Tie 2: E = 564143.88 Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: NE Date: Jan. 16, 2025 Located: 12"x8" stone with a 2" sguare wood stake by the stone. Depth: Placed: 5L 8" iron with seal #43844 over top of the stone Location: Tie 1: N: 158370.898 Tie 2: E: 5641 41 .082 Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor's Record Section 9
Surveyor's Record Section 4
Surveyor's Record Section 3
Surveyor's Record Section 10 |
Corner: W1/4 Date: MARCH 31, 2005 Located: Depth: Placed: GIN SPIKE Location: AT CALCULATED AND OCCUPIED LOCATION Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: W1/4 Date: Located: Stone Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
1861 Field Notes
Surveyor's Record Section 9
Surveyor's Record Section 8 |
Corner: CENTER No information.
Surveyor's Record Section 9 |
Corner: E1/4 Date: Located: POINTED FIELD STONE, 12"x24" LONG Depth: 1.5' BELOW GRADE Placed: STEEL PIN Location: ABOVE STONE Tie 1: RED PAINTED STEEL FE. POST BASE W. ON LINE 84.95' Tie 2: RED PAINTED STEEL FE. POST, BASE E. ON LINE 66.36' Tie 3: Tie 4: Remarks:
Corner: E1/4 Date: Jan. 16, 2025 Located: LARGE POINTED FIELD STONE WITH A 1"X2"X12" LONG WOODEN ON THE SOUTH SIDE. Depth: Placed: 5/8" iron with seal #43844 OVER TOP OF THE STONE. Location: Tie 1: N: 155694.502 Tie 2: E: 564149.937 Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
1861 Field Notes
Surveyor's Record Section 9
Surveyor's Record Section 10 |
Corner: SW Date: NOVEMBER 6 2008 Located: IRON MONUMENT Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: SW Date: Located: Stone Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: SW Date: Oct. 14, 2015 Located: Nothing Depth: At the surface Placed: Survey spike with seal #50343. Location: Center of the Intersection. Tie 1: N: 153027.160, E: 558851.570 Tie 2: Nail and Seal in Utility Pole SW 79.95'. Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor's Record Section 9
Surveyor's Record Section 8
Surveyor's Record Section 17
Surveyor's Record Section 16 |
Corner: S1/4 No information.
1861 Field Notes
Surveyor's Record Section 9
Surveyor's Record Section 16 |
Corner: SE Date: Jan. 29, 2025 Located: large field stone with a wooden stake along the east side Depth: Placed: 5/8" iron with seal #43844 OVER STONE. Location: Tie 1: N: 153037.697 Tie 2: E: 564152.022 Tie 3: NAIL & SEAL IN TELE. PED. NW 52.94' Tie 4: NAIL & SEAL IN CUT OFF POWER POLE NE 47.01', NORTHWEST CORNER OF ELEC. BOX 52.67' Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor's Record Section 9
Surveyor's Record Section 16
Surveyor's Record Section 10
Surveyor's Record Section 15 |