Corner: NW Date: NOV. 1969 Located: FIELD STONE Depth: Placed: STEEL PIN Location: ABOVE STONE Tie 1: N&C PP NW. 57.19' Tie 2: N&C COR. POST NE. 66.98' Tie 3: N&C COR. POST SE. 52.30' Tie 4: Remarks:
Corner: NW Date: 8/26/2024 Located: Depth: Placed: Location: Tie 1: N-205738.075 Tie 2: E-553379.912 Tie 3: Tie 4: Remarks: MAG nail placed after Bituminous overlay project.
At the top of the asphalt surface.
Corner: NW Date: OCT. 19, 2004 Located: 2" DIA. DISK Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Moseng Land Surveying
Surveyor?s Record Section 29
Surveyor?s Record Section 19
Surveyor?s Record Section 30
Surveyor?s Record Section 20 |
Corner: N1/4 Date: March 23, 2018 Located: Iron Stake Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: N1/4 Date: 1969 Located: Depth: Placed: IRON PIN (ASSUMED) Location: ON SOUTH FENCE LINE Tie 1: N&C COR. POST S. 50.89' Tie 2: N&C 1ST POST W. OF N. COR. POST 58.54' Tie 3: Tie 4: Remarks:
Corner: N1/4 Date: 8/26/2024 Located: Depth: Placed: Location: Tie 1: N-205730.022 Tie 2: E-556033.861 Tie 3: Tie 4: Remarks: MAG nail placed after Bituminous overlay project.
At the top of the asphalt surface.
1861 Field Notes
Surveyor?s Record Section 29
Surveyor?s Record Section 20 |
Corner: NE Date: JUNE 8, 1976 Located: CONCRETE STONE Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NE Date: AUG. 27,2020 Located: NO. 4 REBAR WITHOUT CAP Depth: DOWN 0.2' Placed: Location: Tie 1: SEE ATTACHED CERT. Tie 2: Tie 3: Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: NE Date: 1940 Located: CONCRETE STONE Depth: Placed: IRON PIN Location: ABOVE STONE Tie 1: N&C COR. POST NE. 52.40' Tie 2: N&C COR. POST NW. 45.30' Tie 3: Tie 4: Remarks:
Corner: NE Date: APRIL 14, 1978 Located: Depth: Placed: IRON PIN Location: ABOVE STOVE Tie 1: N&C PP NE. 61.43' Tie 2: N&C BLAZED TREE NW. 73.89' Tie 3: STEEL PIN INSLOPE SW. 54.11' Tie 4: Remarks:
Corner: NE Date: 8/26/2024 Located: Depth: Placed: Location: Tie 1: N-205723.179 Tie 2: E-558685.584 Tie 3: Tie 4: Remarks: MAG nail placed after Bituminous overlay project.
At the top of the asphalt surface.
Surveyor?s Record Section 29
Surveyor?s Record Section 20
Surveyor?s Record Section 21
Surveyor?s Record Section 28 |
Corner: W1/4 Date: March 23, 2018 Located: Fence Corner Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: W1/4 Date: Aug. 12, 2010 Located: IRON PIN W/ CAP NO. 19092 Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: W1/4 Date: JULY, 1900 Located: STONE Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
1861 Field Notes
Surveyor?s Record Section 29
Surveyor?s Record Section 30 |
Corner: CENTER No information.
Surveyor?s Record Section 29 |
Corner: E1/4 Date: July 18, 2017 Located: Depth: At the top of the asphalt surface. Placed: #4 Rebar Location: 4' South of the Centerline of driveway on the east side & .17' East of CSAH 42 Centerline. Tie 1: N: 203072.751 Tie 2: E: 558705.637 Tie 3: Elev.: 1451.559 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.
Corner: E1/4 Date: Aug. 27, 2020 Located: NO. 4 REBAR WITHOUT CAP Depth: FLUSH WITH ASPHALT Placed: Location: Tie 1: MAG NAIL IN EAST FACE OF POWER POLE SW 232.30' Tie 2: MAG NAIL IN SOUTH FACE OF POWER POLE SE 58.05' Tie 3: MAG NAIL IN NORTH FACE OF POWER POLE NW 47.59' Tie 4: NAIL & WHISKER SE 135.78' Remarks: Westwood Professional Services Corner Certification
Corner: E1/4 Date: APR. 14, 1978 Located: FIELD STONE Depth: 30" BELOW GRADE Placed: Location: Tie 1: N&C PP W. 47.05' Tie 2: N&C PP SE. 57.37' Tie 3: NAILS E. 135.78', 252.26' AND 366.16' Tie 4: Remarks:
Corner: E1/4 Date: May 15, 2017 Located: #4 Rebar Depth: 1.3' Below the top of the asphalt surface. Placed: Location: On Centerline of CSAH 42 & 6' South of the centerline of the East Driveway & 6' South of tree line to the west. Tie 1: N: 203072.733 Tie 2: E: 558705.666 Tie 3: Elev.: 1450.190 Tie 4: Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap
Corner: E1/4 Date: March 23, 2018 Located: 3/8" Iron Stake Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: E1/4 Date: MAR 21 2000 Located: Depth: 0.2' BELOW GRADE Placed: 3/8" REBAR (ASSUMED) Location: Tie 1: N&C PP SW. 57.47' Tie 2: NAILS W. 155.00', 250.00' AND 346.00' Tie 3: Tie 4: Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.
1861 Field Notes
Surveyor?s Record Section 29
Surveyor?s Record Section 28 |
Corner: SW Date: AUG. 12, 2010 Located: CAP NO. 19092 Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: SW Date: March 23, 2018 Located: Iron Stake Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: SW Date: JULY, 1900 Located: STONE Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: SW Date: Aug. 11, 2016 Located: Iron pin with a yellow survey cap # 19092 no other markings visible Depth: .2' Below the gravel surface. Placed: Location: On Centerline of the E-W Township Road, and 6' west of the field break heading in the southerly direction. Tie 1: Northing- 200449.850 Tie 2: Easting- 553446.860, Elev.- 1442.507 Tie 3: Tie 4: Remarks: Tied pink ribbon around the survey cap. Murray County Coordinates & Geoid 99 used.
Surveyor?s Record Section 29
Surveyor?s Record Section 30
Surveyor?s Record Section 31
Surveyor?s Record Section 32 |
Corner: S1/4 Date: March 23, 2018 Located: Iron Stake Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
1861 Field Notes
Surveyor?s Record Section 29
Surveyor?s Record Section 32 |
Corner: SE Date: JUNE 25, 1924 Located: Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: FOUND CORNER IN 1924.
Corner: SE Date: May 12, 2017 Located: #4 Rebar Depth: 1.35' Below the top of the asphalt surface. Placed: Location: On Centerline of CSAH 42 & On Centerline of the East Rd & 2' South of the Road heading westerly. Tie 1: N: 200432.937 Tie 2: E: 558723.855 Tie 3: Elev.:1445.863 Tie 4: Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap
Corner: SE Date: AUG. 27,2020 Located: NO. 4 REBAR WITHOUT CAP Depth: FLUSH WITH ASPHALT Placed: Location: Tie 1: MAG IN SOUTHEAST FACE OF POWER POLE SW 58.75' Tie 2: R/W SIGN SE 153.48' Tie 3: R/W SIGN NE 153.87' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: SE Date: MAR 21 2000 Located: Depth: 0.2' BELOW GRADE Placed: 3/8" REBAR (ASSUMED) Location: Tie 1: N&C PP SW. 57.47' Tie 2: NAILS W. 155.00', 250.00' AND 346.00' Tie 3: Tie 4: Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.
Corner: SE Date: APRIL 14, 1978 Located: FOUND NOTHING Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: DUG WITH BACKHOE 6'x6'x6' HOLE.
Corner: SE Date: July 18, 2017 Located: Depth: At the top of asphalt surface. Placed: #4 Rebar Location: .25' west of Centerline of CSAH 42 & 1' North of the road heading easterly & 2' South of the road heading westerly. Tie 1: N: 200432.943 Tie 2: E: 558723.878 Tie 3: Elev.: 1447.413 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.
Surveyor?s Record Section 29
Surveyor?s Record Section 32
Surveyor?s Record Section 28
Surveyor?s Record Section 33 |