Corner: NW Date: May 12, 2017 Located: #4 Rebar Depth: 1.32' below the top of the asphalt. Placed: Location: 1' west of centerline of CSAH 42 & 1.5' south of E-W Rd centerline of CSAH 11. Tie 1: N: 179318.450 Tie 2: E: 558853.276 Tie 3: Elev.: 1483.976 Tie 4: Remarks: Found before the 2017 Overlay. The found rebar was placed by MCHD after grading in 1999, and before the paving in 2000.
Murray County Coordinates & Geoid 99 used
Placed pink ribbon above the survey cap
Corner: NW Date: Aug. 27, 2020 Located: NO. 4 REBAR WITHOUT CAP FLUSH WITH ASPHALT Depth: Placed: Location: Tie 1: MAG NAIL IN NE FACE OF POWER POLE NW 123.52' Tie 2: MAG NAIL IN NORTH OF POWER POLE SE 137.96' Tie 3: TELEPHONE PEDESTAL NE 155.95' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: NW Date: MAR. 21, 2000 Located: Depth: 0.2' BELOW GRADE Placed: 3/8" REBAR Location: Tie 1: N&C PP NW. 127.20' Tie 2: N&C TEL. PED. NE. 116.90' Tie 3: N&C PP SE. 154.35' Tie 4: NAILS W. 155.05', 245', 345.05' Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.
Corner: NW Date: November 23, 1987 Located: Depth: Placed: 3/4" Iron Pipe Location: Tie 1: N&C P.P. NW 127.20' Tie 2: N&C Tel. Ped. Post NE 116.90' Tie 3: N&C P.P. SE 154.35' Tie 4: Remarks: Placed by L.S.
Corner: NW Date: Sept. 21, 2015 Located: Iron Monument Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: NW Date: Sept. 9, 2017 Located: Depth: At the top of the asphalt surface. Placed: #4 Rebar Location: 1.1' west of the Centerline of CSAH 42 & On Centerline of CSAH 11 Tie 1: N: 179318.383 Tie 2: E: 558853.286 Tie 3: Elev. 1485.390 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.
Corner: NW Date: AUG. 8, 2006 Located: IRON MONUMENT Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: NW Date: April 13, 1978 Located: Nothing Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: DUG WITH BACKHOE A 6'x6'x7' HOLE.
Surveyor's Record Section 21
Surveyor's Record Section 17
Surveyor's Record Section 20
Surveyor's Record Section 16 |
Corner: N1/4 Date: JUNE 5, 2012 Located: 3/4" STEEL PIN Depth: DOWN 5" Placed: Location: CENTERLINE OF ROAD. Tie 1: N = 179330.943 Tie 2: E = 561499.700 Tie 3: ELEV. = 1474.819 Tie 4: Remarks: TIES WERE GOOD
Corner: N1/4 Date: 1963 Located: Depth: Placed: STEEL PIN (ASSUMED) Location: 1" BELOW GRADE Tie 1: N&C PP SE. 51.62' Tie 2: "X" NORTH END PIPE 134.72' Tie 3: Tie 4: Remarks:
Corner: N1/4 Date: Aug. 27, 2020 Located: NO. 3 REBAR WITHOUT CAP Depth: 0.2' BELOW GRADE Placed: Location: Tie 1: NAIL & BOTTLE CAP IN NE FACE OF POWER POLE SE 52.37' Tie 2: CUT "X" IN NORTH END OF 12" RCP CULVERT NE 134.44' Tie 3: CUT "X" IN NORTH END OF 12" RCP CULVERT SE 137.12' Tie 4: Remarks: Westwood Professional Services Corner Certification
1861 Field Notes
Surveyor's Record Section 21
Surveyor's Record Section 16 |
Corner: NE Date: Nov. 21, 2005 Located: Spike Depth: Placed: 1" Pipe with seal #43844 Location: Tie 1: Nail & seal in telephone ped post NW 66.70' Tie 2: Nail & seal in PP SE 58.40' Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: NE Date: 1963 Located: SPIKE (ASSUMED) Depth: Placed: STEEL PIN (ASSUMED) Location: 1" BELOW GRADE Tie 1: N&C PP NE. 58.54' Tie 2: N&C TP SW. 78.95' Tie 3: N&C TP NW. 66.59' Tie 4: Remarks:
Corner: NE Date: JUNE 5, 2012 Located: LAND SURVEYOR CAP AND PIN (TOP WAS TOO DAMAGED) Depth: 4" DOWN Placed: Location: CENTERLINE OF ROAD Tie 1: N = 179350.269 Tie 2: E = 564153.937 Tie 3: ELEV. = 1437.505 Tie 4: Remarks:
Surveyor's Record Section 21
Surveyor's Record Section 16
Surveyor?s Record Section 15
Surveyor's Record Section 22 |
Corner: W1/4 Date: AUG. 8, 2006 Located: SURVEY MARKER SPIKE OVER TOP OF IRON MONUMENT. Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: W1/4 Date: Sept. 29, 2017 Located: Depth: At the top of the asphalt surface. Placed: #4 Rebar Location: On Centerline of CSAH 42 & On the Centerline of the fence line to the west. Tie 1: N: 176658.231 Tie 2: E: 558862.629 Tie 3: Elev. 1505.546 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used Placed after the 2017 overlay project.
Corner: W1/4 Date: Aug. 27, 2020 Located: NO. 4 REBAR WITHOUT CAP Depth: FLUSH WITH ASPHALT Placed: Location: Tie 1: MAG NAIL IN NORTH END OF 18" CMP CULVERT NE 47.75' Tie 2: MAG NAIL IN NORTH END OF 18" CMP CULVERT SW 45.20' Tie 3: MAG NAIL IN NORTH END OF 18" CMP CULVERT SE 50.17' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: W1/4 Date: MAR. 21, 2000 Located: Depth: 0.2' BELOW GRADE Placed: 3/8" REBAR Location: Tie 1: REBAR E. 131.03', 233.25', 333.65' Tie 2: P.K. NAIL IN CULVERT NE. 47.60' Tie 3: P.K. NAIL IN CULVERT SE. 50.17' Tie 4: P.K. NAIL IN CULVERT SW. 45.05' Remarks: Rebar was placed before 6" of gravel and 5" of bituminous that was laid in the summer of 2000.
Corner: W1/4 Date: May 9, 2017 Located: 3/4" Iron pipe with no cap. Depth: At the top of the asphalt surface. Placed: Location: On centerline of CSAH 42 & in line with the E-W Fence lines. Tie 1: N: 176658.239 Tie 2: E: 558862.656 Tie 3: Elev.: 1505.313 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Corner: W1/4 Date: July 19, 2018 Located: Iron Monument Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
1861 Field Notes
Surveyor's Record Section 21
Surveyor's Record Section 20 |
Corner: CENTER No information.
Surveyor's Record Section 21 |
Corner: E1/4 Date: AUG. 8, 2006 Located: Depth: Placed: 1" IRON PIPE W/ CAP NO. 23008 Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying Corner Certification
Corner: E1/4 Date: Aug. 27, 2020 Located: NO. 5 REBAR WITH CAP LS 23008 Depth: DOWN 0.3' Placed: Location: Tie 1: MAG NAIL IN SW FACE OF POWER POLE SE 40.97' Tie 2: MAG NAIL IN SOUTH FACE OF LEANING FENCE POST SE 76.53' Tie 3: MAG NAIL IN WEST FACE OF POWER POLE NE 77.55' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: E1/4 Date: JUNE 5, 2012 Located: Iron Pipe with Cap No. 23008 Depth: DOWN 4" Placed: Location: 1' WEST OF CENTERLINE OF ROAD. Tie 1: N = 176701.423 Tie 2: E = 564187.893 Tie 3: ELEV. = 1476.643 Tie 4: Remarks:
1861 Field Notes
Surveyor's Record Section 21
Surveyor's Record Section 22 |
Corner: SW Date: NOV. 8, 2007 Located: IRON MONUMENT Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: SW Date: July 19, 2018 Located: Iron Monument Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: SW Date: APR. 14, 1978 Located: Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: DUG 6'x6'x7' DEEP HOLE WITH BACKHOE FOUND NOTHING
Corner: SW Date: Jan. 28, 2015 Located: Iron Monument Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Surveyor's Record Section 21
Surveyor's Record Section 20
Surveyor's Record Section 29
Surveyor?s Record Section 28 |
Corner: S1/4 No information.
1861 Field Notes
Surveyor's Record Section 21
Surveyor?s Record Section 28 |
Corner: SE Date: Aug. 27, 2020 Located: T-POST Depth: 1.3' BELOW GRADE Placed: Location: Tie 1: MAG NAIL IN NE FACE OF POWER POLE NW 46.35' Tie 2: NO. 3 REBAR WITH REF. CAP NE 61.59' Tie 3: NO. 3 REBAR WITH REF CAP SE 49.25' Tie 4: Remarks: Westwood Professional Services Corner Certification
Corner: SE Date: Jan. 28, 2015 Located: Iron Monument Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Surveyor's Record Section 21
Surveyor?s Record Section 28
Surveyor's Record Section 22
Surveyor's Record Section 27 |