Township:

Section:

Corner: NW
Date: MAY 24, 1977
Located: WOOD STAKE, 12"x10"x18" STONE
Depth: 18" DOWN
Placed: 3/4" IRON ROD
Location: O.4' DOWN; STONE N. SIDE OF IRON
Tie 1: N&C TEL. PED. NE. 47.92'
Tie 2: N&C WOODEN POST S. 32.30'
Tie 3: N&C PP SW. 45.65'
Tie 4:
Remarks:


Corner: NW
Date: March 24, 2017
Located: Iron Stake
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: NW
Date: May 24, 1977
Located: Rotted wood stake with a 12"x10"x18" stone over
Depth: 18" down
Placed: 3/4" iron rod with remains of stake and placed the stone on the north side of stake
Location:
Tie 1: Nail & bottle cap in SW side of telephone ped post up 4' NE 47.92'
Tie 2: Nail & bottle cap in E side of wooden post up 1' SE 32.30'
Tie 3: Nail & bottle cap in SE side of PP up 1' SW 45.65'
Tie 4:
Remarks: MN DNR LS
Corner Certification


Surveyor's Record Section 3


Surveyor's Record Section 33


Surveyor's Record Section 4


Surveyor's Record Section 34

Corner: N1/4
Date: SEPT. 22, 1977
Located:
Depth:
Placed: 1/2"x14" IRON PIPE 0.2' BELOW GRADE
Location: 12' NORTH OF CENTER OF ROAD
Tie 1: N&C COTTONWOOD NW. 72.65'
Tie 2: CHISELED "X" W. END RCP E/SE 81.20'
Tie 3: TOP OF STEEL FE. POST N. 64.90'
Tie 4: BRIDGE POST W/SW 41.32'
Remarks: BRIDGE POST W/NW 41.42'; BRIDGE POST SW. 12.45'; BRIDGE POST NW. 6.87'


Corner: N1/4
Date: Sept. 22, 1977
Located:
Depth:
Placed: 1/2"x14" iron pipe down 0.2'
Location:
Tie 1: Nail & bottle cap in S side of bridge post W/NW 41.42'
Tie 2: Nail & bottle cap in E side of bridge post N/NW 6.87'
Tie 3: Nail & bottle cap in E side of bridge post S/SW 12.45'
Tie 4: Nail & bottle cap in N side of bridge post W/SW 41.32'
Remarks: MN DNR LS
Corner Certification


Corner: N1/4
Date: Oct. 15, 2013
Located: Nothing
Depth:
Placed: 5/8" Iron with seal #43844
Location: On line with field line to the south and approx. 23' east of centerline of creek
Tie 1: Nail & Survey Marker in PP SE 82.65'
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: N1/4
Date: APRIL 12, 1898
Located:
Depth:
Placed: STAKE
Location: 6' E. OF BRIDGE ON N. SIDE OF GRADE
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: N1/4
Date: March 24, 2017
Located: Iron Stake
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Surveyor's Record Section 3


Surveyor's Record Section 34

Corner: NE
Date: NOV. 10, 1970
Located:
Depth:
Placed: 5/8" IRON PIPE
Location: 0.2' DOWN
Tie 1: N&C PP SW. 59.66'
Tie 2: N&C FE. POST NW. 60.21'
Tie 3: N&C TEL. PED. NE. 56.42'
Tie 4:
Remarks: MN DNR LS
Corner Certification


Corner: NE
Date: 1971
Located: 3/4" STEEL PIN
Depth:
Placed:
Location:
Tie 1: CULV. END NW. 39.62'
Tie 2: CULV. END SW. 41.82'
Tie 3: N&C TP NE. 56.52'
Tie 4: N&C PP SE. 57.68'
Remarks:


Corner: NE
Date: June 23, 2017
Located: Iron Pin
Depth:
Placed:
Location: Near intersection of roads north-south and east-west
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Jibben Surveying
Corner Certification


Corner: NE
Date: APRIL 12, 1898
Located:
Depth:
Placed: STONE
Location: IN GRADE
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: MAY 1, 2012
Located: 3/4" PIPE
Depth: DOWN 3"
Placed:
Location: CENTERLINE OF ROAD
Tie 1: N = 131730.325
Tie 2: E = 506087.007
Tie 3: ELEV. = 1572.118
Tie 4:
Remarks:


Surveyor's Record Section 3


Surveyor's Record Section 34


Surveyor's Record Section 35


Surveyor's Record Section 2

Corner: W1/4
Date: MAY 27, 1977
Located: COR. FE. POST
Depth:
Placed: DNR PROPERTY MON.
Location: 0.2' W. OF COR. FE. POST
Tie 1: NE. COR. SEC. 4, 2513.77'
Tie 2: SE. COR. SEC. 4, 2639.39'
Tie 3:
Tie 4:
Remarks: MN DNR LS
Corner Certification


1861 Field Notes


Surveyor's Record Section 3


Surveyor's Record Section 4

Corner: CENTER
No information.


Surveyor's Record Section 3

Corner: E1/4
Date: MAY 1, 2012
Located: 1" STEEL PIN
Depth: DOWN 5"
Placed:
Location: CENTERLINE OF ROAD
Tie 1: N = 129098.733
Tie 2: E = 506086.821
Tie 3: ELEV. = 1571.552
Tie 4:
Remarks: Checked 1977 Ties, Tie 1 Good and Ties 2,3,4 were No Good.


Corner: E1/4
Date: MAY 24, 1977
Located: 3/4" IRON PIPE
Depth: 0.2' DOWN
Placed:
Location:
Tie 1: N&C COR. POST W. 52.73'
Tie 2: N&C COR. POST E. 50.59'
Tie 3: N&C PP SW. 53.84'
Tie 4: N&C GATE POST SE. 57.28'
Remarks: MN DNR LS
Corner Certification


Corner: E1/4
Date: June 23, 2017
Located: Iron Pin
Depth:
Placed:
Location: Near centerline of road north-south, in line with fence to west.
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Jibben Surveying
Corner Certification


1861 Field Notes


Surveyor's Record Section 3


Surveyor's Record Section 2

Corner: SW
Date: June 25, 2018
Located: 3/4" Iron Stake
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: SW
Date: JUNE 21, 1977
Located: 6"x6"x10" STONE, SMALL ONES OVER 1"x4" PIECE OF WOOD W. SIDE
Depth: 3.8' BELOW GRADE
Placed: 3/4" IRON ROD OVER STONE DOWN 0.3'
Location:
Tie 1: N&C W. SIDE 10" ELM SE. 55.08'
Tie 2: N&C SW. FE. POST 37.58'
Tie 3: N&C PP W/SW 84.10'
Tie 4: FE. LINE N. 500'
Remarks: MN DNR LS
Corner Certification


Surveyor's Record Section 3


Surveyor's Record Section 4


Surveyor's Record Section 9


Surveyor's Record Section 10

Corner: S1/4
Date: May 24, 1977
Located: 8"x8"x12" stone and 2 pieces of crockery under
Depth: Down 1.5'
Placed: 3/4"x12" iron rod over stone
Location:
Tie 1: Nail & bottle cap in E side of fence post up 1.0' NW 32.59'
Tie 2: Nail & bottle cap in SE side of 7" Boxelder Tree up 1.0' NE 72.12'
Tie 3: Nail & bottle cap in E side of PP up 2.5' S 27.07'
Tie 4:
Remarks: MN DNR LS
Corner Certification


Corner: S1/4
Date: APRIL 30, 2012
Located: 3/4" PIN
Depth: DOWN 3"
Placed:
Location: CENTERLINE
Tie 1: N = 126538.058
Tie 2: E = 503414.206
Tie 3: ELEV = 1602.119
Tie 4:
Remarks:


1861 Field Notes


Surveyor's Record Section 3


Surveyor's Record Section 10

Corner: SE
Date: May 24, 1977
Located: 9"x10" stone with X with a 2"x2"x18" wood hub over
Depth: 4.5' down
Placed: 3/4"x24" iron rod over stone down 0.3'
Location:
Tie 1: Nail & bottle cap in NW side of PP up 6.0' SW 55.80'
Tie 2: Nail & bottle cap in SE side of telephone ped post up 5.0' NE 60.31'
Tie 3: Nail & bottle cap in top wooden post SE 60.71'
Tie 4:
Remarks: MN DNR LS
Corner Certification


Corner: SE
Date: June 23, 2017
Located: Iron Pin
Depth:
Placed:
Location: Near centerline roads north-south and east-west.
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Jibben Surveying
Corner Certification


Corner: SE
Date: MAY 24, 1977
Located: 9"x10" STONE, 2"x2" HUB
Depth: 4.5' DOWN
Placed: 3/4"x24" IRON ROD
Location: ABOVE STONE 0.3' DOWN
Tie 1: S. END CMP SW. 41.40'
Tie 2: N. END CMP NW. 41.85'
Tie 3: N&C PP SW. 55.80'
Tie 4: N&C FE. POST SE. 60.71'
Remarks: N&C TEL. PED. NE. 60.31'. Checked Ties in 2012, Tie 1 & 2 Were Good and Ties 3,4 were No Good.


Corner: SE
Date: May 1, 2012
Located: 3/4" STEEL PIN
Depth: DOWN 8"
Placed:
Location: 1' WEST OF CENTERLINE
Tie 1: N = 126468.265
Tie 2: E = 506088.171
Tie 3: ELEV. = 1589.268
Tie 4:
Remarks:


Surveyor's Record Section 3


Surveyor's Record Section 10


Surveyor's Record Section 2


Surveyor's Record Section 11

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2024, Murray County Minnesota