Corner: NW No information.
Surveyor?s Record Section 20
Surveyor?s Record Section 18
Surveyor?s Record Section 19
Surveyor?s Record Section 17 |
Corner: N1/4 No information.
1866 Field Notes
Surveyor?s Record Section 20
Surveyor?s Record Section 17 |
Corner: NE Date: July 18, 2017 Located: Depth: At the top of the asphalt surface. Placed: MAG nail Location: 1.9' North of Centerline of CSAH 18 & On Centerline of CSAH 25. Tie 1: N: 211425.489 Tie 2: E: 432431.944 Tie 3: Elev.: 1693.841 Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Placed after the 2017 overlay project.
Corner: NE Date: 1956 Located: CONC. MON. Depth: Placed: STEEL PIN 1969 Location: BIT. SURF. Tie 1: N&C PP NW. 69.00' Tie 2: STEEL PIN INSLOPE NE. 42.45' Tie 3: STEEL PIN INSLOPE SW. 54.04' Tie 4: Remarks: PK. NAIL PLACED JUNE 10, 1997
Corner: NE Date: Aug 2, 2016 Located: Iron Pin with orange survey cap denoting Moseng. Depth: At the surface of the asphalt. Placed: Location: At the intersection of CSAH 25 & CSAH 18. Also On Centerline of 25 & 6" north of the centerline of CSAH 18. Tie 1: Northing- 211425.489 Tie 2: Easting- 432431.944, Elev.- 1693.671 Tie 3: Tie 4: Remarks: Murray County Coordinates & Geoid 99 used
Corner: NE Date: Nov. 12, 2001 Located: 1/2" iron Depth: Placed: 1" Iron pipe over the iron Location: Tie 1: Nail & seal in telephone ped post NE 59.80' Tie 2: Nail & bottle cap in PP NW 69.13' Tie 3: Tie 4: Remarks: Moseng Land Surveying Corner Certification
Surveyor?s Record Section 20
Surveyor?s Record Section 17
Surveyor?s Record Section 16
Surveyor?s Record Section 21 |
Corner: W1/4 No information.
1866 Field Notes
Surveyor?s Record Section 20
Surveyor?s Record Section 19 |
Corner: CENTER No information.
Surveyor?s Record Section 20 |
Corner: E1/4 Date: Nov. 14, 2001 Located: 1/2" square rebar Depth: Placed: Location: Tie 1: Nail & seal in PP NW 50.94' Tie 2: Tie 3: Tie 4: Remarks: Moseng Land Surveying Corner Certification
Corner: E1/4 Date: 1969 Located: CONC. MON. Depth: Placed: STEEL PIN Location: 2" BELOW GRADE Tie 1: N&C PP NW. 51.35' Tie 2: 2"x2" HUB NW. 67.00' Tie 3: Tie 4: Remarks:
1866 Field Notes
Surveyor?s Record Section 20
Surveyor?s Record Section 21 |
Corner: SW Date: Oct. 10, 2001 Located: Depth: Placed: Pipe at the road surface Location: Tie 1: Nail & seal #11943 in PP SE 39.92' Tie 2: Tie 3: Tie 4: Remarks: Moseng Land Surveying Corner Certification
Corner: SW Date: July 5, 2007 Located: 1/2" capped iron pipe with seal #11943 Depth: Down 0.3' Placed: Location: Tie 1: Chiseled X in north end of RCP NW 47.06' Tie 2: Chiseled X in south end of RCP SW 46.10' Tie 3: PK Nail in N side of PP up 5.0' SE 39.90' Tie 4: Remarks: Westwood Professional Services Corner Certification
Surveyor?s Record Section 20
Surveyor?s Record Section 19
Surveyor?s Record Section 30
Surveyor?s Record Section 29 |
Corner: S1/4 No information.
1866 Field Notes
Surveyor?s Record Section 20
Surveyor?s Record Section 29 |
Corner: SE Date: Nov. 14, 2001 Located: Spike Depth: Placed: Location: Tie 1: Nail & bottle cap in PP SW 56.63' Tie 2: Nail & seal #11943 in PP SE 58.46' Tie 3: Tie 4: Remarks: Moseng Land Surveying Corner Certification
Corner: SE Date: 1969 Located: CONC. MON. Depth: Placed: STEEL PIN Location: 1" BELOW GRADE Tie 1: N&C PP SW. 56.80' Tie 2: N&C PP SE. 57.27' Tie 3: Tie 4: Remarks:
Surveyor?s Record Section 20
Surveyor?s Record Section 29
Surveyor?s Record Section 21
Surveyor?s Record Section 28 |