Township:

Section:

Corner: NW
Date: NOVEMBER 6 2008
Located: IRON MONUMENT
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: NW
Date:
Located: Stone
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: NW
Date: Oct. 14, 2015
Located: Nothing
Depth: At the surface
Placed: Survey spike with seal #50343.
Location: Center of the Intersection.
Tie 1: N: 153027.160, E: 558851.570
Tie 2: Nail and Seal in Utility Pole SW 79.95'.
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 16


Surveyor's Record Section 8


Surveyor's Record Section 17


Surveyor's Record Section 9

Corner: N1/4
No information.


1861 Field Notes


Surveyor's Record Section 16


Surveyor's Record Section 9

Corner: NE
Date: Jan. 29, 2025
Located: large field stone with a wooden stake along the east side
Depth:
Placed: 5/8" iron with seal #43844 OVER STONE.
Location:
Tie 1: N: 153037.697
Tie 2: E: 564152.022
Tie 3: NAIL & SEAL IN TELE. PED. NW 52.94'
Tie 4: NAIL & SEAL IN CUT OFF POWER POLE NE 47.01', NORTHWEST CORNER OF ELEC. BOX 52.67'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 16


Surveyor's Record Section 9


Surveyor's Record Section 10


Surveyor's Record Section 15

Corner: W1/4
Date: Oct. 14, 2015
Located: Nothing
Depth: At the surface.
Placed: Survey Spike with seal #50343.
Location: 1' west of Centerline of CSAH 42.
Tie 1: N: 150340.460, E: 558889.110
Tie 2: Nail and Seal in utility pole. W 50.95'
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: W1/4
Date: NOVEMBER 8 2008
Located: IRON MONUMENT
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


1861 Field Notes


Surveyor's Record Section 16


Surveyor's Record Section 17

Corner: CENTER
No information.


Surveyor's Record Section 16

Corner: E1/4
Date: Jan. 29, 2025
Located: 10"x14"x16" long stone below old road bed.
Depth:
Placed: 5/8" iron with seal #43844 OVER TOP OF THE STONE.
Location:
Tie 1: N: 150339.392
Tie 2: E: 564210.452
Tie 3: NAIL & SEAL IN POWER POLE NE 93.88'
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: E1/4
Date: APRIL 10, 1974
Located: 1'-6"x1' ROCK
Depth: 1'-6" BELOW GRAVEL GRADE 4' E. OF ROAD CENTERLINE
Placed: STEEL PIN
Location: ABOVE ROCK
Tie 1: N&C BRACE POST SW. 38.50'
Tie 2: N&C TP NW. 52.80'
Tie 3: PIPE COR. FE. POST EAST 32.50'
Tie 4:
Remarks:


1861 Field Notes


Surveyor's Record Section 16


Surveyor's Record Section 15

Corner: SW
Date: 1965
Located: 2"x2" HUB OVER CON. MON.
Depth:
Placed: P.K. NAIL
Location:
Tie 1: N&C FE. COR. POST NE. 65.0'
Tie 2: N&C TP SE. 62.65'
Tie 3: N&C PP NW. 83.47'
Tie 4: COR. POST SE. 63.94'
Remarks:


Corner: SW
Date: Nov. 29, 2016
Located: Railroad spike down 1.0'
Depth:
Placed: 3/4" X 24" Rebar with plastic cap stamped "MN DNR LS 17003", Down .7'
Location: 2.0' East of Centerline of N-S Rd & In line with E-W Rd.
Tie 1: N: 147658.151 E: 558931.106
Tie 2: 3/8" X 24" Rebar with plastic cap stamped " MN DNR RP" Down .5' -NW 83.08'
Tie 3: Drilled Hole in Top of North End of 36" RCP NE 67.92'
Tie 4: Drilled Hole in Top of South End of 36" RCP NE 66.45'
Remarks: MN DNR LS
Corner Certification


Surveyor's Record Section 16


Surveyor's Record Section 17


Surveyor's Record Section 20


Surveyor's Record Section 21

Corner: S1/4
Date: 1940
Located: CONCRETE STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. FENCE POST SOUTH ON LINE 34.2'
Tie 2: TACK IN TEL. POLE SE. 45.6'
Tie 3: TACK IN COR. FENCE POST NW. 50.2'
Tie 4: EDGE OF STEEL COR. POST NE. 49.8'
Remarks:


Corner: S1/4
Date: Aug. 12, 2024
Located: Concrete Monument, and PLACED 5/8" iron along the north side for locating purposes.
Depth:
Placed:
Location:
Tie 1: N: 147653.529
Tie 2: E: 561567.806
Tie 3: NAIL & SEAL IN POWER POLE NE 88.86'
Tie 4: NAIL & SEAL IN FENCE POST NW 100.84', NAIL & SEAL IN CORNER FENCE POST N 35.18'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


1861 Field Notes


Surveyor's Record Section 16


Surveyor's Record Section 21

Corner: SE
Date: Nov. 16, 2007
Located: 6" Concrete Monument with X on it
Depth: 1' below surface
Placed: 1" iron pipe with survey cap #23008
Location: At centerline of intersection
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying
Corner Certification


Corner: SE
Date: 1940
Located: CONCRETE STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. FENCE POST NW. 50.2'
Tie 2: EDGE OF STEEL COR. POST NE. 49.8'
Tie 3:
Tie 4:
Remarks:


Corner: SE
Date: Jan. 29, 2025
Located: CONCRETE MONUMENT
Depth:
Placed: 5/8" iron with seal #43844 OVER TOP OF THE CONCRETE MONUMENT.
Location:
Tie 1: N: 147681.218
Tie 2: E: 564229.297
Tie 3: NAIL & SEAL IN POWER POLE NE 61.28'
Tie 4: TOP CENTER OF TELE. PED. SW 48.31', NW CORNER OF DES MOINES RIVER TOWN HALL. SE 94.83'
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 16


Surveyor's Record Section 21


Surveyor's Record Section 15


Surveyor's Record Section 22

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2025, Murray County Minnesota