Corner: NW Date: March 5, 2008 Located: Depth: Placed: Mag. Nail Location: 3' north of centerline of east-west road Tie 1: Telephone ped NW 59.05' Tie 2: Telephone ped NE 60.56' Tie 3: N&C in PP SW 60.49' Tie 4: Remarks: Ulteig Engineering, Inc. Corner Certification
Corner: NW Date: APRIL 26, 1901 Located: Depth: Placed: STONE AND STAKE Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NW Date: APRIL 6, 1967 Located: 3/4" IRON PIN Depth: 9" BELOW GRADE Placed: Location: Tie 1: N&C TEL. PED. NW. 45.65' Tie 2: N&C PP SW. 44.3' Tie 3: N&C COR. FE. POST NE. 47.4' Tie 4: Remarks:
Corner: NW Date: APRIL 2, 1999 Located: P,K, NAIL AT SURFACE, 3/4" IRON PIN BELOW FROM MURRAY CO. RECORDS Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: NW Date: Nov. 2, 1992 Located: 3/4" rebar Depth: 6" down Placed: Location: Tie 1: Top SE corner of telephone ped NW 59.05' Tie 2: 1/2"x30" rebar with survey cap #17518 NE 59.57' Tie 3: Nail & bottle cap in PP up 3.5' SW 60.49' Tie 4: Remarks: Kevin Jongerius Corner Certification
Corner: NW Date: JUNE 13, 1969 Located: IRON ROD Depth: Placed: Location: Tie 1: CHISELED "X" ON APRON SE. 51.15' Tie 2: N&C PP SW. 60.55' Tie 3: Tie 4: Remarks:
Corner: NW Date: MAY 6, 1993 Located: CONC. MON. WITH "X" Depth: 6" BELOW SURF. Placed: PLACED LARGE NAIL Location: ABOVE MON. Tie 1: N&C YEILD SIGN NW. 44.42' Tie 2: N&C PP SW. 60.48' Tie 3: TOP CENTER OF TEL. PED. NW. 59.23' Tie 4: PAINTED NUT YIELD SIGN SE. 48.30' Remarks: PLACED P.K. NAIL OCT. 12, 1993
Surveyor's Record Section 29
Surveyor's Record Section 19
Surveyor's Record Section 30
Surveyor's Record Section 20 |
Corner: N1/4 Date: JUNE 13, 1969 Located: IRON ROD Depth: Placed: Location: Tie 1: "X" ON APRON Tie 2: Tie 3: Tie 4: Remarks:
Corner: N1/4 Date: APRIL 2, 1999 Located: P.K. NAIL AT SURFACE, 3/4" IRON PIN BELOW FROM MURRAY CO. RECORDS Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks:
Corner: N1/4 Date: APRIL 7, 1967 Located: Depth: Placed: 3/4"x6" IRON PIN (ASSUMED) Location: Tie 1: N&C COR. FE. POST N. 34.44' Tie 2: N&C 6" ELM TREE NE. 36.2' Tie 3: Tie 4: Remarks:
Corner: N1/4 Date: MAY 6, 1993 Located: 3/4" IRON PIN Depth: 6" BELOW GRADE Placed: Location: Tie 1: CHISELED "X" CULV. END SE. 43.90' Tie 2: CHISELED "X" CULV. END SW. 42.02' Tie 3: N&C BRACE POST NW. 92.65' Tie 4: N&C COR. FE. POST N. 89.60' Remarks: PLACED P.K. NAIL OCT. 12, 1993
Corner: N1/4 Date: Nov. 2, 1992 Located: 3/4" rebar Depth: 6" down Placed: Location: Tie 1: Nails Xed on top of wood fence post W/NW 111.37' Tie 2: Nails Xed on top of wood fence post NW 92.49' Tie 3: Nails Xed on top of wood fence post N 89.44' Tie 4: Remarks: Kevin Jongerius Corner Certification
1861 Field Notes
Surveyor's Record Section 29
Surveyor's Record Section 20 |
Corner: NE Date: MAY 6, 1993 Located: 3/4" STEEL PIN Depth: 12" BELOW GRADE Placed: Location: COR. 17' S. CENTERLINE COUNTY ROAD Tie 1: STEEL PIN S. 100.00' IN TWP. RD. Tie 2: N&C PP SE. 49.70' Tie 3: N&C COR. POST NW. 48.3' Tie 4: N&C YIELD SIGN NW. 66.22' Remarks: PLACED P.K. NAIL OCT. 12, 1993.
Corner: NE Date: Aug. 21,2019 Located: None Depth: Placed: 5/8" iron with seal #50343 Location: On centerline of north-south road and 16.9' south of centerline of east-west road Tie 1: N: 105448.329 Tie 2: E: 469020.888 Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: NE Date: JUNE 13, 1969 Located: IRON ROD Depth: Placed: Location: NOTE CENTERLINE OF NEW ROAD 17' N. Tie 1: "X" ON CULV. NUT SW. 69.55' Tie 2: "X" ON CULV. NUT NW. 78.60' Tie 3: N&C PP SE. 49.50' Tie 4: Remarks:
Corner: NE Date: Sept. 11, 2006 Located: PK Nail Depth: Placed: Location: On centerline of north-south road and 16.9' south of centerline of east-west road Tie 1: Yield sign NW 67.1' Tie 2: Street sign NE 61.7' Tie 3: Top NW corner of power box SE 68.8' Tie 4: Remarks: Ulteig Engineering, Inc. Corner Certification
Surveyor's Record Section 29
Surveyor's Record Section 20
Surveyor's Record Section 21
Surveyor's Record Section 28 |
Corner: W1/4 Date: FEB. 26, 2007 Located: IRON STAKE W/ CAP 44563 Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Zieske Land Surveying
Corner: W1/4 Date: March 13, 2006 Located: Depth: Placed: 5/8" rebar with cap #44563 Location: In line with fence to the east Tie 1: Nails Xed in PP SW 91.6' Tie 2: Nails Xed in Tree NE 82.0' Tie 3: Tie 4: Remarks: Ulteig Engineering, Inc. Corner Certification
1861 Field Notes
Surveyor's Record Section 29
Surveyor's Record Section 30 |
Corner: CENTER No information.
Surveyor's Record Section 29 |
Corner: E1/4 Date: Aug. 21, 2019 Located: Concrete Monument Depth: Placed: 5/8" iron with seal #50343 Location: Tie 1: N: 108169.327 Tie 2: E: 463695.634 Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: E1/4 Date: March 9, 2006 Located: Depth: Placed: 5/8" rebar with cap #44563 Location: In line with fence to the east Tie 1: Chiseled X in N end of CMP NW 40.0' Tie 2: Chiseled X in S end of CMP SW 25.0' Tie 3: Nails Xed in wood fence post E 30.6' Tie 4: Remarks: Ulteig Engineering, Inc. Corner Certification
Corner: E1/4 Date: Located: CONC. MON. Depth: 5" BELOW GRADE Placed: Location: Tie 1: N&C GATE POST NE. 38.7' Tie 2: N&C COR. POST E. 33.3' Tie 3: Tie 4: Remarks:
1861 Field Notes
Surveyor's Record Section 29
Surveyor's Record Section 28 |
Corner: SW Date: March 9, 2006 Located: Depth: Placed: 5/8" rebar with cap #44563 Location: At intersection of roads Tie 1: Nails Xed in PP NW 54.1' Tie 2: Top center of telephone ped SE 62.4' Tie 3: Top NE corner of power box NW 47.2' Tie 4: Remarks: Ulteig Engineering, Inc. Corner Certification
Surveyor's Record Section 29
Surveyor's Record Section 30
Surveyor's Record Section 31
Surveyor's Record Section 32 |
Corner: S1/4 Date: March 20, 2006 Located: 1/2' pipe Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Ulteig Engineering, Inc. Corner Certification
1861 Field Notes
Surveyor's Record Section 29
Surveyor's Record Section 32 |
Corner: SE Date: Located: CONC. MON. Depth: 4" BELOW GRADE Placed: Location: Tie 1: N&C COR POST SE. 47.1' Tie 2: N&C TP NE. 49.6' Tie 3: N&C TP SW. 47.6' Tie 4: Remarks:
Corner: SE Date: Located: Depth: Placed: STONE Location: Tie 1: TACK IN COR FE POST SE. 42.3' Tie 2: TACK IN COR FE POST SW. 40.4' Tie 3: Tie 4: Remarks:
Corner: SE Date: March 20, 2006 Located: Big Spike Depth: Placed: Location: Centerlines of gravel roads Tie 1: Nails Xed in telephone ped post NE 49.2' Tie 2: Top of water valve SE 79.2' Tie 3: Tie 4: Remarks: Ulteig Engineering, Inc. Corner Certification
Surveyor's Record Section 29
Surveyor's Record Section 32
Surveyor's Record Section 28
Surveyor's Record Section 33 |