Corner: NW Date: 1934 Located: FIELD STONE Depth: Placed: Location: Tie 1: TACK IN COR. POST SW. 41.8' Tie 2: TACK IN COR. POST NE. 44.5' Tie 3: Tie 4: Remarks:
Surveyor?s Record Section 26
Surveyor?s Record Section 22
Surveyor?s Record Section 27
Surveyor?s Record Section 23 |
Corner: N1/4 No information.
1866 Field Notes
Surveyor?s Record Section 26
Surveyor?s Record Section 23 |
Corner: NE No information.
Surveyor?s Record Section 26
Surveyor?s Record Section 23
Surveyor?s Record Section 24
Surveyor?s Record Section 25 |
Corner: W1/4 Date: 1934 Located: FIELD STONE Depth: Placed: Location: Tie 1: TACK IN FE. POST SE. 41.7' Tie 2: TACK IN FE. POST 33.6' Tie 3: Tie 4: Remarks:
1866 Field Notes
Surveyor?s Record Section 26
Surveyor?s Record Section 27 |
Corner: CENTER No information.
Surveyor?s Record Section 26 |
Corner: E1/4 No information.
1866 Field Notes
Surveyor?s Record Section 26
Surveyor?s Record Section 25 |
Corner: SW Date: AUG. 24, 1931 Located: Depth: Placed: STONE Location: CENTER OF GRADE Tie 1: FE. COR. 39' SE. Tie 2: FE. COR. 39.6' SW. Tie 3: Tie 4: Remarks:
Corner: SW Date: July 5, 2007 Located: 3/8" rebar Depth: Down 0.5' Placed: Location: Tie 1: 3/8" rebar down 0.5' below surface NE 47.17' Tie 2: 3/8" rebar down 0.5' below surface SE 41.69' Tie 3: PK Nail on top of wood corner fence post SW 42.39' Tie 4: Remarks: Westwood Professional Services Corner Certification
Surveyor?s Record Section 26
Surveyor?s Record Section 27
Surveyor?s Record Section 34
Surveyor?s Record Section 35 |
Corner: S1/4 Date: March 31, 2017 Located: 3/8" Iron Depth: Placed: Location: Tie 1: Tie 2: Tie 3: Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Corner: S1/4 Date: JULY 1, 1902 Located: Depth: Placed: STONE Location: ON LINE E.&W. AND N./S. FE. LINE Tie 1: FEN. COR 50.5' N. Tie 2: FE. COR. 5' S. Tie 3: Tie 4: Remarks:
1866 Field Notes
Surveyor?s Record Section 26
Surveyor?s Record Section 35 |
Corner: SE Date: March 31, 2017 Located: 3/8" Iron with Seal #12967 Depth: Placed: Location: Tie 1: Nail & bottle cap in PP NW 41.28' Tie 2: Nail & bottle cap in PP NE 41.84' Tie 3: Nail & bottle cap in guy Pole ESE 32.93' Tie 4: Remarks: Bueltel-Moseng Land Surveying Corner Certification
Surveyor?s Record Section 26
Surveyor?s Record Section 35
Surveyor?s Record Section 25
Surveyor?s Record Section 36 |