Township:

Section:

Corner: NW
Date: MARCH 3, 2006
Located:
Depth:
Placed: 1" iron pipe with seal #43844
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Corner: NW
Date: Jan. 30, 2017
Located:
Depth:
Placed: 3/4" x 24" Rebar with plastic cap stamped "MN DNR LS 17003" Down 0.5'
Location: On centerline of north-south road and in line with centerline road west & 2' south of road east
Tie 1: Found PK nail in north end of 18" PVC culvert NE 38.10'
Tie 2: Found PK nail in south end of 18" PVC culvert SE 33.46'
Tie 3: 3/4" x 24" Rebar with plastic cap stamped "MN DNR RP" Down 0.5' SSW 59.05' and SW 67.51'
Tie 4: 3/4" x 24" Rebar with plastic cap stamped "MN DNR RP" Down 0.5' NW 72.73'
Remarks: MN DNR LS
Corner Certification


Corner: NW
Date: June 27, 2007
Located: Capped iron pipe with cap #43844
Depth: 0.2' Down
Placed:
Location:
Tie 1: PK Nail in S end of culvert SW 33.55'
Tie 2: PK Nail in N end of culvert NE 37.96'
Tie 3: PK Nail in S end of culvert SE 33.35'
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


Surveyor's Record Section 11


Surveyor's Record Section 3


Surveyor's Record Section 10


Surveyor's Record Section 2

Corner: N1/4
No information.


1866 Field Notes


Surveyor's Record Section 11


Surveyor's Record Section 2

Corner: NE
Date: APR. 6, 1990
Located: STONE
Depth: 24" DEEP
Placed: 3/4"x18" IRON PIN
Location: ABOVE STONE 4" DEEP
Tie 1: N&C PP NE. 40.30'
Tie 2: N&C TEL. PED. POST SE. 43.25'
Tie 3: N&C PP NW. 44.60'
Tie 4:
Remarks: MADSEN LAND SURVEYING SET THE SEC. COR. PIN AND ALSO SET ANOTHER 3/4" IRON PIN ON E. EDGE OF THE STONE 24" DEEP


Surveyor's Record Section 11


Surveyor's Record Section 2


Surveyor's Record Section 1


Surveyor's Record Section 12

Corner: W1/4
Date: March 3, 2006
Located:
Depth:
Placed: 1" Iron pipe with seal #43844
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


1866 Field Notes


Surveyor's Record Section 11


Surveyor's Record Section 10

Corner: CENTER
No information.


Surveyor's Record Section 11

Corner: E1/4
No information.


1866 Field Notes


Surveyor's Record Section 11


Surveyor's Record Section 12

Corner: SW
Date: 1892
Located: STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. FE. POST SW. 37.5'
Tie 2: TACK COR. FE. POST SE. 36.2'
Tie 3:
Tie 4:
Remarks:


Corner: SW
Date: July 25, 2007
Located: 8"x8" Stone
Depth: Down 1'
Placed: 3/8" Capped rebar #40853 above stone down 0.2' below surface
Location:
Tie 1: PK Nail in S side of wood corner post up 1.5' W 36.15'
Tie 2: 3/8" rebar down 0.5' below surface NE 27.69'
Tie 3: 3/8" rebar down 0.5' below surface SE 26.23'
Tie 4: 3/8" rebar down 0.5' below surface SW 29.00'
Remarks: Westwood Professional Services
Corner Certification


Surveyor's Record Section 11


Surveyor's Record Section 10


Surveyor's Record Section 15


Surveyor's Record Section 14

Corner: S1/4
Date: July 26, 2018
Located:
Depth:
Placed: 5/8" iron with seal #43844
Location: On centerline of the Field Rd.
Tie 1: N- 184886.861
Tie 2: E- 445560.517
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


1866 Field Notes


Surveyor's Record Section 11


Surveyor's Record Section 14

Corner: SE
Date: July 26, 2018
Located: 12" Pointed Field Stone
Depth:
Placed: 5/8" iron with seal #43844 Placed over the Field Stone.
Location: At the Intersection of the N-S-E-W Field Rds.
Tie 1: N- 184885.643
Tie 2: E- 448197.715
Tie 3:
Tie 4:
Remarks: Bueltel-Moseng Land Surveying
Corner Certification


Surveyor's Record Section 11


Surveyor's Record Section 14


Surveyor's Record Section 12


Surveyor's Record Section 13

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2024, Murray County Minnesota