Township:

Section:

Corner: NW
Date: 1940
Located: CONCRETE STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. FE. POST NW. 46.7'
Tie 2: TACK IN COR. FE. POST NE. 51.3'
Tie 3:
Tie 4:
Remarks:


Corner: NW
Date: August 27, 2013
Located: 3/4" Rebar
Depth: 6" Down
Placed:
Location: 3' North of Centerline
Tie 1: Northing = 195143.522
Tie 2: Easting = 548372.284
Tie 3: Elev. = 1533.530
Tie 4:
Remarks:


Corner: NW
Date: JULY 21, 1989
Located: CONC. MON. ABOVE FIELD STONE AND 2"x2" HUB
Depth: FIELD STONE IS 3.7' DEEP WITH MON. AT SURFACE
Placed: 3/4"x8" REBAR
Location: ABOVE MON. 2" BELOW SURFACE
Tie 1: N&C FE. COR. SW. 36.56'
Tie 2: N&C PP NW. 47.80'
Tie 3: SW. COR. POWER BOX NE. 59.12'
Tie 4:
Remarks:


Corner: NW
Date: Aug. 26,2020
Located: NO. 6 REBAR
Depth: DOWN 0.6'
Placed:
Location:
Tie 1: FND NAIL WITH BOTTLE CAP IN SE FACE PP NW 47.09'
Tie 2: SIGN POST SE 31.25'
Tie 3: SW CORNER OF UTILITY BOX NE 70.25'
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


Surveyor?s Record Section 6


Surveyor?s Record Section 36


Surveyor's Record Section 1


Surveyor?s Record Section 31

Corner: N1/4
Date: 1934
Located: CONCRETE STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. FE. POST S. ON LINE 33.9'
Tie 2: TACK IN BLAZED FE. POST SE. 41.0'
Tie 3:
Tie 4:
Remarks:


Corner: N1/4
Date: DEC. 16, 2020
Located: 6" X 6" CONCRETE MONUMENT WITH "X" SCRIBED ON TOP, 0.2' BELOW GRADE
Depth:
Placed: NO. 4 REBAR WITH CAP LS 45874 ON NORTH SIDE OF MONUMENT, DOWN 0.5'
Location:
Tie 1: MAG NAIL IN SOUTH FACE OF POWER POLE NW 224.70'
Tie 2: WIA. WEST FACING SIGN NE 45.52'
Tie 3: MAG NAIL IN SOUTHEAST FACE OF POWER POLE NE 67.56'
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


Surveyor?s Record Section 6


Surveyor?s Record Section 31

Corner: NE
Date: 1934
Located: CONCRETE STONE
Depth:
Placed:
Location:
Tie 1: TACK IN COR. FE. POST SW. 41.4'
Tie 2: TACK IN COR. FE. POST SE. 43.2'
Tie 3:
Tie 4:
Remarks:


Corner: NE
Date: AUG. 12, 2010
Located:
Depth:
Placed: 5/8" IRON STAKE W/ CAP NO. 23008
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: NE
Date: OCT. 28, 2008
Located: CONCRETE MONUMENT W/ X IN TOP
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Surveyor?s Record Section 6


Surveyor?s Record Section 31


Surveyor?s Record Section 32


Surveyor?s Record Section 5

Corner: W1/4
No information.


Surveyor?s Record Section 6


Surveyor's Record Section 1

Corner: CENTER
No information.


Surveyor?s Record Section 6

Corner: E1/4
Date: May 27, 2016
Located: Iron pin with Yellow survey cap denoting zieske PLS 23008.
Depth: At the surface of the township road.
Placed:
Location: On centerline of the N-S Township Road.
Tie 1: Northing- 192579.506
Tie 2: Easting- 553479.981, Elev.- 1475.985
Tie 3:
Tie 4:
Remarks: No other ties found, Placed pink ribbon around the Iron pin with the survey cap.


Corner: E1/4
Date: OCT. 28, 2008
Located:
Depth:
Placed: IRON PIPE W/ CAP 23008
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying
Corner Certification


Corner: E1/4
Date: Aug. 27, 2020
Located: 1" PIPE WITH DAMAGED YELLOW PLASTIC CAP LS # 23008
Depth: FLUSH WITH GRADE
Placed:
Location:
Tie 1: NO. 3 REBAR REF. CAP NW 41.71'
Tie 2: NO. 3 REBAR REF. CAP SE 41.16'
Tie 3: NO. 3 REBAR REF. CAP SW 57.03'
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


1861 Field Notes


Surveyor?s Record Section 6


Surveyor?s Record Section 5

Corner: SW
Date: May 27, 2016
Located: Nothing found with the metal locator.
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks:


Corner: SW
Date: May 14, 1991
Located: 2.5"x24" charred pointed wood stake
Depth: Down 2.5'
Placed: 3/4"x24" rebar with aluminum cap stamped "DNR Survey Marker" over wood stake down 0.5'
Location: 4'south of centerline of east-west road & 5.5' west of centerline field approach in line with fence north
Tie 1: Nail & DNR Disc E side of 10" Ash Tree up 1.0' S/SW 57.47'
Tie 2: Nail & DNR Disc SE side of 12" Ash Tree up 1.0' SW 45.00'
Tie 3:
Tie 4:
Remarks: MN DNR LS
Corner Certification


Corner: SW
Date: Aug. 26,2020
Located: NO. 6 REBAR WITH DNR CAP
Depth: DOWN 0.4'
Placed:
Location:
Tie 1: NO. 3 REBAR WITH REF. CAP NW 60.26'
Tie 2: NO. 3 REBAR WITH REF. CAP SW 48.44'
Tie 3: 3" IRON PIPE NW 50.34'
Tie 4:
Remarks: Westwood Professional Services
Corner Certification


Surveyor?s Record Section 6


Surveyor's Record Section 1


Surveyor's Record Section 12


Surveyor?s Record Section 7

Corner: S1/4
Date: Oct. 9, 1991
Located:
Depth:
Placed: 3/4"x24" rebar with aluminum cap stamped "DNR Survey Marker" down 0.2'
Location: On centerline of east-west road & in line with centerline of road north
Tie 1: Nail & DNR Disc in E side of telephone ped pole up 2.0' NW 39.46'
Tie 2: Punched hole in W end of 15" CMP NW 27.51'
Tie 3: Punched hole in E end of 15" CMP NE 32.22'
Tie 4: Nail & DNR Disc in E side of corner fence post up 2.5' S 33.40'
Remarks: MN DNR LS
Corner Certification


Corner: S1/4
Date: May 27, 2016
Located: Iron Pin with Aluminum survey cap stamped DNR Survey Marker.
Depth: .40' Below the gravel surface
Placed:
Location: On Centerline of E-W Road (Township) and On Centerline of the fence heading in the southerly direction.
Tie 1: Northing- 189891.782
Tie 2: Easting- 550849.087, Elev.- 1520.922
Tie 3:
Tie 4:
Remarks: Pink Ribbon placed 2" above the survey cap. Coordinates in Murray & Geoid 99 used


1861 Field Notes


Surveyor?s Record Section 6


Surveyor?s Record Section 7

Corner: SE
Date: OCT. 28, 2008
Located: IRON MONUMENT
Depth:
Placed:
Location:
Tie 1:
Tie 2:
Tie 3:
Tie 4:
Remarks: Zieske Land Surveying


Corner: SE
Date: May 26, 2016
Located: Iron Pin with aluminum cap Denoting DNR Survey Marker.
Depth: 0.60' Below the top of the gravel surface.
Placed:
Location: On Centerline of the E-W Township road, & 2' West of Centerline of the N-S Township road.
Tie 1: Northing- 189937.012
Tie 2: Easting- 553484.644, Elevation- 1528.764
Tie 3:
Tie 4:
Remarks: Placed Pink Ribbon 2" Above survey DNR Survey Marker.


Corner: SE
Date: Oct. 9, 1991
Located: 12"x19"x19" Granite Stone with pieces of lath
Depth: Down 2.5'
Placed: 3/4"x24" rebar with aluminum cap stamped "DNR Survey Marker" over stone down 0.4'
Location: 1' west of centerline of north-south road & on centerline of east-west road
Tie 1: Nail & DNR Disc in WSW side of wood corner fence post up 4' NW 57.15'
Tie 2: Nail & DNR Disc in S side of PP post up 4' NE 43.66'
Tie 3: Nail & DNR Disc in SW side of PP post up 4' SE 48.82'
Tie 4:
Remarks: MN DNR LS
Corner Certification


Surveyor?s Record Section 6


Surveyor?s Record Section 7


Surveyor?s Record Section 5


Surveyor?s Record Section 8

6

5

4

3

2

1

7

8

9

10

11

12

18

17

16

15

14

13

19

20

21

22

23

24

30

29

28

27

26

25

31

32

33

34

35

36


Show County         Printable Version

Copyright 2024, Murray County Minnesota